ML16342A368
Jump to navigation
Jump to search
| ML16342A368 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/31/1993 |
| From: | Bourgo E, Stipicevich J PACIFIC GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML16342A366 | List: |
| References | |
| NUDOCS 9401250122 | |
| Download: ML16342A368 (2) | |
Text
OPERATING DATAREPORT OPERATING STATUS TELEPHONE DOCKET NO.
50-275 UNIT 1
DATE 01/01/94 COMPLETED BY E. Bourgo J. Stipicevich (805) 545-3035/4877
- 1. Unit Name:
2.
Reporting Period:
3.
Licensed Thermal Power (MWt):
4.
Nameplate Rating (Gross MWe):
5.
Design Electrical Rating (Net Mwe):
- 6. Maximum Dependable Capacity (Gross Mwe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. Ifchanges occur in capacity ratings (items 3 through 7) since last report, give reasons:
9.
Power level to which restricted, ifany (Net MWe):
10.
Reasons for restrictions, ifany:
Diablo Canyon Unit 1 July 1993 3338 1137 1086 1124 1073.4 N/A N/A N/A This Month YTD 5087.0 5087.0 0.0 5087.0 0.0 16510179 5564600 5301748 100.00 100.00 97.09 95.97 0.00
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours 16.
Gross Thermal Energy Generated (MWH) 17.
Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None.
- 25. IfShut Down At End Of Report Period, Estimate Date of Startup: Not applicable Cumulative 72189.3 60699.1 0.0 59799.6 0.0 188251482 63355632 59290188 82.84 82.84 77.55 76.65 3.19 940Xasoam 9O0W4:
PDR ADOCK 05000275.
'R
"':" ',".PDR~='