ML16342A368

From kanterella
Jump to navigation Jump to search
Revised MOR for July 1993 for Dcnpp Unit 1
ML16342A368
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 07/31/1993
From: Bourgo E, Stipicevich J
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML16342A366 List:
References
NUDOCS 9401250122
Download: ML16342A368 (2)


Text

OPERATING DATAREPORT OPERATING STATUS TELEPHONE DOCKET NO.

50-275 UNIT 1

DATE 01/01/94 COMPLETED BY E. Bourgo J. Stipicevich (805) 545-3035/4877

1. Unit Name:

2.

Reporting Period:

3.

Licensed Thermal Power (MWt):

4.

Nameplate Rating (Gross MWe):

5.

Design Electrical Rating (Net Mwe):

6. Maximum Dependable Capacity (Gross Mwe):
7. Maximum Dependable Capacity (Net MWe):
8. Ifchanges occur in capacity ratings (items 3 through 7) since last report, give reasons:

9.

Power level to which restricted, ifany (Net MWe):

10.

Reasons for restrictions, ifany:

Diablo Canyon Unit 1 July 1993 3338 1137 1086 1124 1073.4 N/A N/A N/A This Month YTD 5087.0 5087.0 0.0 5087.0 0.0 16510179 5564600 5301748 100.00 100.00 97.09 95.97 0.00

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 16.

Gross Thermal Energy Generated (MWH) 17.

Gross Electrical Energy Generated (MWH)

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None.

25. IfShut Down At End Of Report Period, Estimate Date of Startup: Not applicable Cumulative 72189.3 60699.1 0.0 59799.6 0.0 188251482 63355632 59290188 82.84 82.84 77.55 76.65 3.19 940Xasoam 9O0W4:

PDR ADOCK 05000275.

'R

"':" ',".PDR~='