ML20093L468
| ML20093L468 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/30/1984 |
| From: | Sisk D, Thornberry R PACIFIC GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8410190005 | |
| Download: ML20093L468 (5) | |
Text
_ _
OPERATING ~ DATA EPORT.
DOCKET NO.-
50-275 DATE 10/05/84 COMPLETED BY D.P. Sisk TELEPHONE (805)595-7351 OPERATINGSTATUS 1.. Unit Name:
-Diablo Canyon Unit 1
.2.
Reporting Period:
September 1984 Notes: Low Power Physics
- 3.. Licensed Thermal Power (MWt):
166.9 Testing is completed. Awaiting 4.
Nameplate Rating (Gross MWe):
1170 grant of the full power 5.
Design. Electrical Rating (Net MWe):
- 1084 license'from the NRC.
.6.
Maximum Dependable Capacity (Gross We):
1134 7.
Maximum Dependable Capacity (Net MWe):-
'1084 8.
If Changes Occur in Capacity Ratings (Items _ Number 3 Through 7) Since Last Report,.
'Give-Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
58.50
- 10. ' Reasons For Restrictions, If Any:
Low power test permit granted by the Nuclear Regulatory Commission on April 13, 1984, effective April 19, 1984 at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />.
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 720 6576 6576
- 12. Number Of Hours Reactor Was Critical 0
361 361 13.
Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
0 0
- 15. Unit' Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 15056.2 15056.2
- 17. Gross Electrical Energy Generated (MWH) 0 0
0
- 18. Net Electrical Energy Generated (MWH) 0 0
0
- 19. Unit Service Factor N/A
- 20. Unit Availability Factor.
N/A
- 21.. Unit Capacity Factor (Using MDC Net)
N/A
- 22. Unit Capacity Factor (Using DER Net)
N/A
- 23. Unit Forced Outage Rate N/A
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25.
If Shut Down At End Of Report Period, Est. Date of Startup:
NOVEMBER 1984
- 26. Units In Test. Status-(Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY.
April 1984 April 1984 INITIAL ELECTRICITY November 1984 COMERCIAL OPERATION
' January 1985 a
. v R
DC0044 -4
.m--
.. ~ -. -.
-,--.,,-.,,-.e...
i
.,,we,,~r...~-,..r
..,,.u.v.%w.
.--,-,-wn-,w-w-,w-.,..+
---,-w, yna-y.
m AVERAGE DAILY-UNIT POWER LEVEL
-DOCKET NO.-
50-275-UNIT Diablo-Canyon-Unit 1 DATE 10/05/84 COMPLETED BY D.P. Sisk
. TELEPHONE (805)595-7351
~ MONTH September 1984 1-DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (lWE-fhT)-
(lWE-ItiT)-
+
, 0 17 0
2
-0
- 18 0
3 0
19 0
1 l.
4 0
20 0
5 0
21 0
4 -
6 0
22 0-7 0
23 0
e 5
.8 0
24 0
9 0
25 0
10 0
26 0-5 11 0
27 0
12 0
28 0
13 0
29 0-t 14 0
30
- 0 I'
15 0
16 -
0 1
9 h
i-INSTRUCTIONS f
-On this format, list th'e average daily unit power level in MWe-Net for each day in the
[--
reporting month. Compute to the' nearest whole megawatt.
P f
DC0044 ?S'.
V y g
g-y-=
hg 7g---e--9$--
e--g 9
iee--=--
--w-+4cw y
y
-p gW-g Q
--i'we 1
-g-trg7w+,
es t'we--w q
=9Wsw'-sw-g g-y.iy-g-&
9#,
y g* vtgy44or y a73-.qyg e
pgyg
,;.r.y y e
UNIT. SHUTDOWNS #0 POWER REDUCTIONS DOCKET NO~
50-275:
.UNITNAP8 DIALO LANYON UNIT'l-DATE-10/15/8'4 COPPLETED BY-D. 3 SISK-TELEPID E Wb)wa-/3')1 l
REPORT MONTH
. SEPTEPBER.
B 84 -
Method of Licensee-
.Cause.8 Corrective Duration l
Shutting Event System Component Action.to No.
Date Type - (Hours)
Reason 2 Down Reactor 3 Report #
Code" Code 5 Prevent Recurrence-NOT APPLICABLE T
I l
1 i
i t
1 2
3 4
F:
Forced Reason:
Method:
Exhibit G Instructions
}
S: Scheduled A-Equipment Failure (Explain) 1-Manual' for Preparation of Data 4
B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File-4 l
D-Regulatory Restriction 4-Other(Explain)-
.(NUREG-0161)~
l E-Operator Training & License Examination i
F-Administrative 5
G-Operational - Error. (Explain).
Exhibit'I - Same Source.
H-Other(Explain) t 1
i
.DC0044 6 i
a PACIFIC GAS AND E LE C T RIC C O M PANY DIABLO CANYON POWER PLANT pgg I
RO. Box 56 Avila Beach, California 93424 (805) 595-7351 R.C. THORNBERRY PLANT MANAGER October 5, 1984 Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 RE:
Docket No. 50-275 License No. DPR-76 Monthly Operating Report for September, 1984 Gentlemen:
Enclosed are the completed monthly operating report forms for Diablo Canyon Unit 1 for September 1984. This report is submitted in accordance with Section 6.9.1.10 of our Technical Specifications.
Sincerely, s / _A R. C. THORNBERRY RCT:lah Enclosures cc Mr. John B. Martin, Regional Administrator Region V - USNRC i
I DC0044 1
MONTHLY NARRATIVE REPORT 0F OPERATION
- AND MAJOR MAINTENANCE EXPERIENCE-nThis report describes the operating and major maintenance experience for the month of September,1984. This narrative report was prepared-by the plant staff-and is submitted in accordance with Section 6.9.1.10 of the Plant Technical Specifications.
There is no_ significant operating experience or major safety-related maintenance to report.
No challenges to the PORV's or safety valves have been made.
No changes have been made in the Offsite Dose Calculation Procedure, the
~ Environmental Radiological Monitoring Procedure, or any radioactive waste treatment systems.
DC0044 3 i