ML20062F547
| ML20062F547 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/02/1982 |
| From: | Scott W PACIFIC GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20062F528 | List: |
| References | |
| NUDOCS 8208120076 | |
| Download: ML20062F547 (3) | |
Text
-
M-lus10 (23; gj77 AVERAGE DAILY UNIT POhER LEVEL DOCKET NO. _50-275 UNIT -Diablo Canyon Unit 7/2/82 DATE COMPLETED BY W. B. Scott TELEPHONE (805) 595-7351 MONTH _ JUNE 1982 DAY AVER AGE DAILY POWER LEVEL DAY (MWe Neti AVER AGE DAILY POWER LEVEL IMWe Neti I
0 37 0
2 0
18 0
3 0
39 0
4 0
20 0
5 0
21 0
6 22 0
7 0
23 0
8 0
24 0
9 0
10 0
0 25 26 0
11 0
27 0
12 28 0
13 0
29 0
14 0
30 0
15 0
3, 16 0
INSTRUCTIONS On this fortnat, list the average daily unit power lesd m MWe Net for each day in th the nearest whole megawatt.
u e to (9 /77 )
8208120076 820706 PDR ADOCK 05000275 R
69-10507 (23) 9/77 OPERATING DATA REPORT DOCKET NO.
50-275 DATE 7/2/82 COMPLETED BY W.B. Scott TELEPHONE (805) 595-7351 OPERATING STATUS Notes Diablo Canyon Unit 1
- 1. Unit Name:
- 2. Reporting Period:
11u np _ 1982
- 3. Licensed Thermal Power (MWt):
166.9 1170
- 4. Nameplate Rating (Gross MWe):
1084
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Ca'pacity (Gross MWe):
1134 1084
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons:
-NONF-9. Power Level To which Restricted. If Any (Net MWe):
Suspended Low Power Test License
- 10. Reasons For Restrictions,1f Any:
This Month Yr.-to.Date Cumulatise 0
0 0
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On.Line 0
0 0
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 0
0
- 17. Gross Electrical Energy Generated (MWH) 0 0
0
- 18. Net Electrical Energy Generated (MWH) 0 0
0
- 19. Unit Service Factor N/A
- 20. Unit Availability Factor N/A
- 21. Unit Capacity Factor (Using MDC Net)
N/A
- 22. Unit Capacity Factor (Using DER Net)
N/A
- 23. Unit Forced Outage Rate N/A
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
-NONE-SeDtember. 1982 (fuel load)
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation p:
Forecast Achiesed INITIA L CRITICA LITY NOV. 1982 INITIAL ELECTRICITY NOV 1982 COMMERCIAL OPERATION FEB. 1983 pu;;i
69-10809 (25) 9/77 DOCKET NO.
50-275 UNIT SilUIDOWNS AND POWER REDUCTIONS Diablo Canyon Unit 1 UNIT N AME DATE 7/2/82 COMPLETED BY W. B. Scott REPORT MON 111 JUNE 1982 TELEPHONE (805) 595-7351 i
15 jg
'h 4 Yi Licensee gg h8 Cause A Corrective o-Action to N..
Date a
ti 2 i
jj5 Event s?
j@
y jgg Report n (N 0 fU Prevent Recurrence i
6 810928 F
0 H
4 81-002/01T ZZ ZZZZZZ Halted fuel loading preparations upon discovery of seismic calculation errors.
Reanalysis and reviews are being conducted in accordance with Commission's instructions.
I 2
3 4
F: Forced Reas m:
Method:
Exhibit G - Instructions S S(beduled A.Equipmen' Failure (Explain)
- 1. Manual for Preparation of Data B. Maintenance of Test
- 2. Manual Scram.
Entry Sheets for Licensee C. Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D. Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Ad nunist rative 5
G. Operational Error IExplain)
Exhibit I Same Source to/77)
II Other il% plain)
W.