Summary of Meeting with NMC, LLC, Steam Generator Replacement Program
ML030910082
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 04/01/2003
From: John Lamb
NRC/NRR/DLPM/LPD3
To:
Lamb J, NRR/DLPM, 415-1446
References
TAC MB4607
Download: ML030910082 (5)


Text

April 1, 2003 LICENSEE: Nuclear Management Company, LLC FACILITY: Prairie Island Nuclear Generating Station, Unit 1

SUBJECT:

SUMMARY

OF MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION STAFF AND NUCLEAR MANAGEMENT COMPANY, LLC, HELD ON MARCH 12, 2003, REGARDING THE STEAM GENERATOR REPLACEMENT PROGRAM (TAC NO. MB4607)

The Nuclear Regulatory Commission (NRC) staff met with representatives of the Nuclear Management Company, LLC (NMC), at NRC Headquarters, at the request of NMC, on March 12, 2003, regarding the steam generator (SG) replacement program for the Prairie Island Nuclear Generating Station, Unit 1. Enclosure 1 lists the meeting participants.

A public meeting notice for the subject meeting was issued on February 14, 2003, and a copy of the meeting notice was posted on the NRCs external (public) web page (ADAMS Accession No. ML030440271).

The purpose of the meeting was to discuss the status of NMCs activities for the SG replacement project at Prairie Island Unit 1. During the meeting, NMC provided a program overview, including the current condition of Unit 1 SGs, justification for replacement, project organization, and program milestone schedule (Enclosure 2). NMC stated that there is no safety concern with the current condition of Unit 1 SGs. The reasons for NMCs decision to replace the SGs include (1) increasing repair costs, (2) potential need for planned mid-cycle inspections and forced outages, (3) increasing outage time, (4) reduction in plant output, and (5) replacement energy costs. NMC stated that Framatome-ANP is the SG replacement vendor. NMC plans to replace the SGs during a planned refueling outage in September 2004.

At the conclusion of the meeting, it was agreed in principle that another meeting should be scheduled in the fall 2003 to focus on the licensing and fabrication of the replacement SGs, followed by a meeting in Spring 2004 to focus on pre-installation.

/RA/

John G. Lamb, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation

Enclosures:

1. Meeting Attendees
2. NMC Handouts cc w/encls: See next page

ML030440271).

The purpose of the meeting was to discuss the status of NMCs activities for the SG replacement project at Prairie Island Unit 1. During the meeting, NMC provided a program overview, including the current condition of Unit 1 SGs, justification for replacement, project organization, and program milestone schedule (Enclosure 2). NMC stated that there is no safety concern with the current condition of Unit 1 SGs. The reasons for NMCs decision to replace the SGs include (1) increasing repair costs, (2) potential need for planned mid-cycle inspections and forced outages, (3) increasing outage time, (4) reduction in plant output, and (5) replacement energy costs. NMC stated that Framatome-ANP is the SG replacement vendor. NMC plans to replace the SGs during a planned refueling outage in September 2004.

At the conclusion of the meeting, it was agreed in principle that another meeting should be scheduled in the fall 2003 to focus on the licensing and fabrication of the replacement SGs, followed by a meeting in Spring 2004 to focus on pre-installation.

/RA/

John G. Lamb, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation

Enclosures:

1. Meeting Attendees
2. NMC Handouts cc w/encls: See next page DISTRIBUTION:

PUBLIC JLamb LMiller KRiemer, RIII BDavis PDIII-1 Reading RBouling DTerao JZwolinski/LMarsh DJones WRuland JTsao MKotzalas LRaghavan PKlein HNieh ADAMS Accession No. ML030910082 (Meeting Summary)

ADAMS Accession No. ML030980830 (Enclosure 2)

ADAMS Accession No. ML030910090 (Package) *Concurred via e-mail OFFICE PDIII-1/PM PDIII-1/LA* PDIII-1/SC NAME JLamb RBouling LRaghavan DATE 04/01/03 03/31/03 04/01/03 MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION AND THE NUCLEAR MANAGEMENT COMPANY, LLC, REGARDING STEAM GENERATOR REPLACEMENT PROJECT AT PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 WEDNESDAY, MARCH 12, 2003 NAME ORGANIZATION D. Jones NRC/RIII J. Tsao NRC/NRR P. Klein NRC/NRR J. Lamb NRC/NRR L. Miller NRC/NRR D. Terao NRC/NRR B. Davis NRC/NRR K. Albrecht NMC R. Pearson NMC A. Laux Framatone J. Billoue Framatone NRR = Office of Nuclear Reactor Regulation NMC = Nuclear Management Company, LLC RIII = Region III ENCLOSURE 1

Prairie Island Nuclear Generating Plant, Units 1 and 2 cc:

Jonathan Rogoff, Esquire Tribal Council General Counsel Prairie Island Indian Community Nuclear Management Company, LLC ATTN: Environmental Department 700 First Street 5636 Sturgeon Lake Road Hudson, WI 54016 Welch, MN 55089 Manager, Regulatory Affairs Mr. Roy A. Anderson Prairie Island Nuclear Generating Plant Executive Vice President Nuclear Management Company, LLC Nuclear Management Company, LLC 1717 Wakonade Drive East 700 First Street Welch, MN 55089 Hudson, WI 54016 Adonis A. Neblett Nuclear Asset Manager Assistant Attorney General Xcel Energy, Inc.

Office of the Attorney General 550 15th St., Suite 1000 455 Minnesota Street Denver, CO 80202 Suite 900 St. Paul, MN 55101-2127 John Paul Cowan Chief Nuclear Officer U.S. Nuclear Regulatory Commission Nuclear Management Company, LLC Resident Inspectors Office 27780 Blue Star Memorial Highway 1719 Wakonade Drive East Covert, MI 49043 Welch, MN 55089-9642 Mano K. Nazar Regional Administrator, Region III Senior Vice President U.S. Nuclear Regulatory Commission Nuclear Management Company, LLC 801 Warrenville Road Prairie Island Nuclear Generating Plant Lisle, IL 60532-4351 1717 Wakonade Drive East Welch, MN 55089 Administrator Goodhue County Courthouse Mr. Joseph M. Solymossy Box 408 Site Vice President Red Wing, MN 55066-0408 Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC Commissioner 1717 Wakonade Drive East Minnesota Department of Commerce Welch, MN 55089 121 Seventh Place East Suite 200 St. Paul, MN 55101-2145 March 2002