IR 05000456/2003004

From kanterella
Revision as of 03:22, 23 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IR 05000456-03-004, IR 05000457-03-004, on 03/10-13/2003, Exelon Generation Company, LLC; Braidwood Station, Units 1 & 2. Ti 2515/148, Verification of Compliance with Interim Compensatory Measures Order
ML031120336
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/18/2003
From: Creed J
Division of Reactor Safety III
To: Skolds J
Exelon Generation Co, Exelon Nuclear
References
IR-03-004
Download: ML031120336 (6)


Text

ril 18, 2003

SUBJECT:

BRAIDWOOD STATION, UNITS 1 AND 2 NRC SAFEGUARDS INSPECTION OF COMPLIANCE WITH ORDER INSPECTION REPORTS 50-456/03-04(DRS); 50-457/03-04(DRS)

Dear Mr. Skolds:

On March 13, 2003, the NRC completed an inspection at your Braidwood Station. The enclosed report documents the inspection findings which were discussed on March 13, 2003, with T. Joyce and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with an Order issued on February 25, 2002, which required your site to implement specific measures related to the security of your facility. The inspection utilized Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, to verify implementation of the Order as clarified in your responses dated March 15, 2002, May 24, 2002, and June 19, 2002. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.

On the basis of the results of this inspection, no findings of significance were identified.

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be placed in the Public Document Room.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter, without enclosure, will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Enclosure Contains Upon Separation This Page is Decontrolled Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

James R. Creed Safeguards Program Manager Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Enclosure: Inspection Report 50-456/03-04(DRS);

50-457/03-04(DRS) ( )

cc w/encl: Site Vice President - Braidwood Braidwood Station Plant Manager Regulatory Assurance Manager - Braidwood Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing NSIR/DNS/RSOS cc w/encl w/o : M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission Enclosure Contains Upon Separation This Page is Decontrolled