MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
1 s w.
l '. :' ;. "
VIRGINIA ELECTRIC AND POWER COMPANY' RICHMOND, VIRGINIA 23261 !
October 16, 1989
- U. S. Nuclear Regulatory Commission Serial No, .89-729 Attention: Document Control Desk NO/JMJ:Jmj :
Washington, D.C. 20555 Docket Nos. 50 338 50 339 ' t' License Nos. NPF-4 NPF-7 . ,
' Gentlemen:
e VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclored is the Monthly Operating Report for North Anna Power Station Units 1 and 2
. for the month of September 1989. -
Very truly yours, L g C \$tJw \ .
W. L. Stewart i Senior Vice President - Power Enclosures cc: U.S. Nuclear Regulatory Commission 1 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. J. L. Caldwell NRC Senior Resident inspector North Anna Power Station
/
8910260265 DR ADocg 890930 oso0033a % %I '
g i PNU i g l
4 ,-vg e---
- y ---wv-e,-, y-er y aswr-va- -wrew,w -wwr-,-e w e-m.w-w- , - - --,e e <v-www-w w -mwr-*-i-, r -ww-ow'w-ww e wwur-w-'e--w-r-e twww w v 7 v
.3 g; '
, : gy,. ;
.g.- 3
.e. ,
a n ,
a, . . ,
t ,-.
t
., g: , . .
n t
i 1
l i
J 'll . I l
l' :
, 6
- s I VIRGINIA POWER C(BIPANY !
NORTH ANNA POWER STATION-
,M0lmILY OPERATING REPORT i 4
MDR11I SEPTEMBER YEAR 1989 j t
k
(
4 i
APPROVED:
> w - (;hw gm yti;sR I
L
, . . . _ _ _ . - - . . - - . _ _ - . .-.--,_-m. , - - . . - . - . . , . . ~ . . . - , _ _ - . . < - _ _ - . . - _ . . . . . , . . , . . . _ _ . _ . - . - . . . _ . , . . . . . . - . . . . .
. .., . I<
c f ,: s: ;
1 b >
. OPERATING DATA REPORT
. DOCKET NO. 50 338 DATE 10-02-89 ;
L COMPLETED BY Bob Tillack I. R . TELEPHONE (703) 894-5151 X2632. -
h 0PERATING STATUS L
1.~ Unit Name: North Anna 1 ;
7 2.; Reporting Period: SEPTEMBER 1989 I' 3. Licensed Thermal Power (MWt):. 2893 .
f 4.. Nameplate Rating (Gross MWe): 947 ,
- 5. Design Electrical Rating (Net MWe): 907 !
- 6. Maximum Dependable Capacity.(Gross MWe): 963 7 .' Maximum Dependable Capacity (Net MWe): 915
- 8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A
. 9. ' Power Level 'lo Which Restricted, If Any (Net MWe): N/A 10.; Reasons For Restrictions, If Any: N/A >
.l This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720 6551 98,843 L12. Number of Hours Reactor Was Critical 720 3174.4 69,393.8 13.' Reactor Reserve Shutdown Hours 0 94.8 6,552.1 ,
'14. -Hours Generator On-Line 720 3136.8 66,651.3
- 15. Unit Reserve Shutdown Hours 0 0 0 j 16.. Gross Thermal Energy Generated (MWH) 2,081.383 8,501,851 _l,76,661,844
'17. Gross Electrical Energy Generated (MWH) 688,180 2.805,366 57,979.715 l
18.' - Not Electrical Energy Generated (MWH) 654,096 2,660,447 54,852,369-
- 19. Unit Service Factor 100 47.9 67.4
- 20. Unit Availability Factor 100 47.9 67.4
- 21. Unit Capacity Factor (Using MDC Net) 99.3 44.4 62.2
- 22. Unit Capacity Factor (Using DER Net) 100.2 44.8 61.2
- 23. Unit Forced Outage Rate 0 5.5 14.2 24.. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l:
l' ' Maintenance / Snubbers, 02-23-90, 25 days l'
l'
- i. :25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
l Forecast Achieved INITIAL CRITICALITY l~ INITIAL ELECTRICITY COMMERCIAL OPERATION ,
1
& , , ,.m
,w,
!!'g : '
r, . , '", . ,
, '. w 3 J
r e, u.
Jr ,
d AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT NA-1
" e DATE' 10-02-89 o COMPLETED BY Bob T111ack
' TELEPHONE 703-894-5151X2632 MONTH Sept' ember 1989' DAY l AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net) (MWe-Net) d 1 910 17 908
>- 2 908 18 908 3 909 19 909 4 909 20 909 5 910 21 908
- t. 6 909 22 904 7 910 23 905 8 908 24 910 9 909 25 910 10 907 26 911 11 906 27 911 12 906 28 912 13 908 29 901 14 908 30 912 ;
15 908 31 i- 16 908 l
p INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
I L - - _ _ . - - .
s . . s.
4 .
..'g,'.. :.,..,
,- J 1
- a. . . .
(..' ,
i it n . ..
i e ,
1 Page 1 of 1 ;
r .1 i
r- 1 i
UNIT SHUTDOWN AND PolRR REDUCTIGES i ,
1 EIPLANATI0tf SHEET DOCKET NO.- 50-338' l
'; REPORT MONTH SEPTDIBER UNIT NAME NA-1 1 1
YEAR 1989 DATE 10-02-89 ;
COMPLETED BY Bob Tillack-i NO ENTRY THIS MONTH
~
d 9
4 i
9 13 1
r )
l o
l 1'
l l-l 1
l l
UNIT SHUTDOWNS AND poler REDUCTIONS D00GT No. 50-338 UNIT NAME North Anna 1
.DATE 1042-89 REPORT MONTH SEPTEMBER 1989 COMPLETED BT Bob Tillack TEI2 PRONE (703) 894-5151 X2632 No. Date Type Duration Reason Method of Licensee System Component Cause and Corrective (Rours) Shutting Ever-t Code Code **I'"
- 3 4 5 Down Reactor Report i Frevent Recurrence NOT ENTRY THIS MONTH I
I 2 3 4 i F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee j C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training / License Examination 5-Lead Reduction
, F-Administrative 9-Other
- G-Operational Error (Explain) 5 i H-Other (Explain) Exhibit H - Same Source i
O 1 - - m,,c-- -<c-~,. -- ,#,.- , ,
- m. .. - v --
k a- . . .
, ,.~ .l. -
p.
i 4
h i 4 .
I' .{
i; ,'
NORT11 ANNA POWER STATION L'
UNIT NO. I 1 :
MONT11 SEPTEMBER' SIDetART OF OPERATING EIPERIENCE Listed below in. chronological sequence is a summary of operating '
experiences for this month which required load reductions or resulted in ,
significant non-load related incidents. ;
i DATE TIME DATA September 1., 1989 0000 Began the month with Unit at 956 W - 100% ' '
power. -
0845 Commenced rampdown to 860 W, 90% power for main turbine governor valve maintenance. ,
0950 Unit stabilized at 860 W.
1120 Completed maintenance, commenced rampup'to L 960 W,100% power.
1230 Unit stabilized at 960 W - 100% power.
L September 30, 1989 2400 Ended month with Unit at 960 W - 100%
- l. power.
t l-1 L
1 l^
l 1.
l-l l
l' t
,,v -
, , , ,-. . + - - - - . ., ,w- m.
, ' I C. ,c e,~ n. . ~ ,
i ll' -
t b IE ' ]7 '
> j h ,
h , ,
J
!6
' OPERATING DATA REPORT i
DOCKET NO. 50-339 DATE 10-02-89 0
[ COMPLETED BY Bob Tillack TELEPHONE (703) 894-5151 X2632 r, , OPERATING-STATUS
~
i {
l '. Unit Name: North Anna 2 !
T ;2. Reporting Period: SEPTEMBER 1989 1
- 3. Licensed Thermal Power (MWt): 2893
- 4. Nameplate. Rating (Gross MWe): 947
- 5. Design Electrical Rating (Net MWe): 907 7 6, Maximum Dependable Capacity (Gross MWe): 963 i
- 7. Maximum Dependable Capacity (Net MWe): 915 x 8. If Changes Occur in-Capacity Ratings (I'tems No. 3 thru 7) Since Last Report, Give Reasons:
N/A -
- 9. Power Level To Which Rectricted, If Any (Net MWe): N/A' '
- 10. Reasons For Restrictions, If Any N/A
.i This Month Yr.-to-Date cumulative a
- 11. Hours In Reporting Period 720 6551 77,111 :
L 12. Number of Hours Reactor Was Critical -720 4709.9 61,913.1
- l - 13. Reactor Reserve Shutdown Hours 0 152.8 5,854.9
? ~14. Hours Generator On-Line 720 4678.7 61,042.9 i l '
'15. Unit Reserve Shutdown Hours 0 0 0 -
l 16. Gross Thermal Energy Generated (MWH) 2,082,614 12,418,005 161,759.004 l 17. Gross Electrical Energy Generated (MWH) 687,840 4,103,187 52,894,816 i- 18. Net Electrical Energy Generated (MWH) 653,566 3,886,633 50,828,956 L 19. Unit Service Factor 100 71.4 79.2 l 20. Unit Availability Factor 100 71.4 79.2 l
- 21. Unit Capacity Factor (Using MDC Net) 99.2 64.8 73.5
- 22. ' Unit Capacity Factor (Using DER Net) 100.1 65.4 72.7 '
- 23. Unit Forced Outage Rate 0 0 7.4 l 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
'25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY L COMMERCIAL OPERATION l
l
- p. 7- , e l .,
- . , ' f.
i4" ,
in L AVERACE DAILY UNIT POWER LEVEL i
DOCKET NO. 50-339 i UNIT. NA-2
[ DATE- 10-02-89 l COMPLETED BY Bob Tillack TELEP110NE 703-894-5151X2632 -
MONTil SEPTEMBER 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL' >
I (MWe-Net) (MWe-Net) 1 906 17 909 2 905 18 908 3 906 19 909 4 908- 20 908 5 907 21 908 ;
6 __
907 22 908 7 908 23 899 8 908 24 910 9 909 25 910 10 906 26 911 11 906 27 912 12 906 28 913 13 907 29 912 14 909 30 911 15 900 31 16 907 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
- ~
, ;;;Y .. ;
, .6 l . L,.' . . ,, 'e,. ,
.: . w. ,
- h. ,
l Page 1 of 1 t
t.
1; !
- e. UNIT SRU190WN AND POWER REDUCTIONS ,
- j. EXPLAMATION SREET DOGtET NO. '50-339- ;
REPORT MON 111 SEPTEMBER' UNIT NAME NA-2 YEAR 1989 DATE 10-02-89 h COMPLETED BY Bob T111ack i
~
I NO ENTRY THIS MONTH .
1 j
1 1
1 1
- 1. .
l' t,
l l
l l
l l
l l'
l l
_ _ _ . _ _ _ . . _ . . _ . . . . . . . . , . . - . _ _ _ _ _ _ . ~ , . . . _ _ _ _ . _ . - . _ _ _ . - _ _ _.
a UNIT SHOTDOWNS AND F0WER REDUCTIONS DOCKET NO. 50-339 -
UNIT NAME North Anna 2 DATE 10-42-89 REPORT MONTH SEPTEMBER 1989 COMPLETED BT Bob Tillack TELEPHONE g703) 894-5151 X2632 No. Date Type Duration Reason Method of Licensee System Component Cause and Corrective (Hours) Shetting 3 4 5 Down Reactor Report i Frevent Recurrence NO ENTRY THIS MONTH 1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee
- C-Refueling 3-Automatic Scram Event Report (LER) File i D-Regulatory Restriction 4-Continuations (NUREG-0161)
E--Operator Training / License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain) Exhibit H - Same Source i
O l
~
k ,. [ <
- . ~ .
['f i o
(( >
NORTH AletA POWER STATION i
t UNIT NO. 2 MON 11I SEPTEMBER SUle(ARY OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
DATE TIME DATA
- September 1, 1989 0000 Began Month with Unit at 955 MW - 100%
power.
September 15, 1989 0901 Commenced rampdown to 890 MW, 92% power for Turbine Valve Freedom Test.
0930 Unit stable at 890 MW - 92% power.
1018 Completed Turbine Valve Freedom Test- i satisfactorily. j 1130 Commenced Unit rampup to 960 MW - 100%
power.
1210 Unit stable at 960 MW - 100% power.
September 23, 1989 1049 Secured High Pressure Heater Drain Pump for !
maintenance, Gross electrical output l decreased 30 MW.
2213 Started High Pressure Heater Drain Pump 2-SD-P-1B, Unit regained 30 MW. l l
September 30, 1989 2400 Ended month with unit at 955 MW - 100% }
power. !