RO 1-82-127:on 821103,required Diesel Generator Quick Starts for Diesel Generators 2,3 & 4 Not Performed within 12-h Requirement.Caused by Personnel Error.Investigation in Progress.Quick Starts Immediately Performed
ML20027E658
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 11/04/1982
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
BSEP-82-2440, RO-1-82-127, NUDOCS 8211150580
Download: ML20027E658 (1)


Text

___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4 Tc1Leopicd 11-4-82 CP&L CarolinhPower & Light Company '

Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 November 4, 1982 n

FILE: B09-13510C s s \ "

SERIAL: BSEP/82-2440 5 3

2 :0 s eo lC Mr. James P. O'Reilly, Director - "]

U. S. Nuclear Regulatory Commission 2. U9 Region II, Suite 3100 C 101 Marietta Street N.W.  ;

I]h

~

Atlanta, GA 30303 cs L 7

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 1 .

DOCKET NO. 50-325 LICENSE NO. DPR-71 i CONFIRMATION FACSIMILE OF AN IMMEDIATELY REPORTABLE EVENT (1-82-12B

Dear Mr. O'Reilly:

3 j

This confirms the telephone conversation at 0915 on November 4, 1982, between Mr. R. M. Poulk, Jr. and Mr. C. W. Hehl concerning an immediately reportable event per Technical Specification 6.9.1.8c.

l At 1159 on November 3, 1982, it was determined that the required diesel generator quick starts for diesel generators 2, 3, and 4 were not performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> as required by Technical Specification 3.8.1.1. The quick starts were immediately performed on all three diesels satisfactorily.

Diesel generator No. I was taken out of service at 0920 on November 2, 1982, to perform periodic testing. Quick starts were performed on diesel generators 2, 3, and 4 at 0955 on November 2, 1982 and again at 2122 on November 2, 1982.

Due to a personnel error, the next scheduled performance for the quick starts' at 0920 on November 3 was not performed. An investigation of this event is in progress and the results will be reported in the 14-day report. #

(

Very truly yours, g

C. R. Dietz, General Manager Brunswick Steam Electric Plant RMP/dj/LETDJ3 Enclosure ggCIAL COM1 cc: Mr. R. C. DeYoung ..- / p