ML19351A584

From kanterella
Jump to navigation Jump to search
Special Rept 1-SR-89-003:on 891115,7-day Time Frame of Limiting Condition for Operation for Designated Fire Barrier Exceeded.Door Repaired & Returned to Svc
ML19351A584
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/12/1989
From: Harness J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1-SR-89-003, 1-SR-89-3, BSEP-89-1089, NUDOCS 8912190373
Download: ML19351A584 (1)


Text

ce p

y o.

g, ,c r

Carolina Power & Light Company Brunswick. Nuclear Project P. O. Box 10429 Southport, NC 28461-0429 December 12, 1989 i" FILE: 'B09-13510C

. SERIAL
BSEP/89-1089 L U.S. Nuclear Regulatory Commission

! ATTN: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 DOCKET NO. 50-325 LICENSE NO. DPR-71 SPECIAL REPORT PER TECIINICAL SPECIFICATION 3.7.8 AND PURSUANT TO TECIINICAL SPECIFICATION 6.9.2 (1-SR-89-003)

Gentlemen:

During Unit 1 power operation, concurrent with the scheduled Unit 2 1989-1990 refueling / maintenance outage, a Unit I designated fire barrier LCO was initiated at 0335 hours0.00388 days <br />0.0931 hours <br />5.539021e-4 weeks <br />1.274675e-4 months <br /> en November 8, 1989, for fire door No. 118 in the units' common Diesel Generator (DG) Building. The door, which would not l completely self-close, is located at fire barrier penetration seal No.

4 DG-2-095 and provides personnel access between DG rooms 1 and 2. At 0335 hours0.00388 days <br />0.0931 hours <br />5.539021e-4 weeks <br />1.274675e-4 months <br /> on November 15, 1989, the specified seven-day time frame of the LCO was exceeded. The door wcs found to be out of adjustment and required repairs were made to the door. It was returned to service at 1435 hours0.0166 days <br />0.399 hours <br />0.00237 weeks <br />5.460175e-4 months <br /> on November 15, 1989. During the time frame the subject LCO was in effect, appropriately M stationed fire watches were maintained.

Very truly yours, e MW

. L. Ilarness, General Manager Brunswick Nuclear Project MJP/mcg Enclosure

.cc: Mr. S. D. Ebneter Mr. E. G. Tourigny BSEP NRC Resident Office i

-