ML20151S899

From kanterella
Jump to navigation Jump to search
Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1
ML20151S899
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/30/1998
From: Jefferson F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20151S892 List:
References
NUDOCS 9809090097
Download: ML20151S899 (2)


Text

,_. _. _

ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO.1 i

MONTHLY OPERATING REPORT APRIL 1998 - REVISED PAGE l

I I

I 9809090097 990821~~

PDR ADOCK 05000324.

R PDR I

r..

APPENDIX A OPERATING DATA REPORT DOCKET NO.

50-325 UNIT NAME Brunswick Steam Electric Plant, Unit No.1 DATE May 4,1998 COMPLETED BY Frank Jefferson TELEPilONE (910)457-2064 REPORTING PERIOD April 1,1998 to April 30,1998 (Month / Year)

YEAR TO MONTil DATE CUMULATIVE

1. Design Electrical Rating:

867.0 N/A N/A (MWe-Net)

2. Maximum Dependable Capacity:

820.0 N/A N/A (MWe-Net)

3. Number ofIlours the Reactor Was Critical:

580.27 2,740.27 122,325.31

4. Number of Hours the Generator Was On Line:

577.'/8 2,737.98 118,138.40

5. Unit Reserve Shutdown flours:

0.00 0.00 0.00 l

6. Net Electrical Energy (MWi1):

468,746 2,204,507 84,146,404

(

l