RO 1-81-57:on 810717,during Review of Wiring Diagram for Reactor Core Isolation Cooling,Two non-electronic Switching Sys Div 2 Cables Found Intermixed W/One Switching Sys Cable in Controlled Logic Panel in Control Room.Review Underway
ML20009F492
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 07/20/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
BSEP-81-1369, RO-1-81-57, NUDOCS 8107310234
Download: ML20009F492 (1)


Text

t T:1ccopicd 7-20-81 WO3fCgQ]

'I TA_)G #CSibS

.. -- s OlhcLg  !,},

.m__

,J, CaroLq Power p Light Company Brunswick Steam Electric Plant P. O. Box 10429 Southport NC 28461 i

July 20,1981 @ &y h lieN y

FILE: B09-13516 g h\

SERIAL: BSEP/81-1369 N(L.1 L b

Mr. James P. O'Reilly, Director hm JULSOI98 W

  • U. S. Nuclear Regulatory Commission Region II, Suite 3100 g MMwpu W J 101 Marietta Street N.W. N Atlanta, GA 30303 4 g BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 and 2 DOCKET NOS. 50-325 and 50-324 LICF.NSE NOS. DPR-71 and DPR-62 CONFIRMATION FACSIMILE OF_AN IMMMEDIATELY REPORTABLE EVENT (1-81-57)

Dear Mr. O'Reilly:

This confirmc the conversation between Mr. R. M. Poulk, Jr., Regulatory Specialist, and Mr. C. A. Julian of your office at 1610 on July 18, 1981, concerning an immediately reportable event for both units per Technical Specification 6.9.1.81. _ , _

At 1515 on July 17, 1981, Carolina Power and Light Company was notified by its architect engineer, United Engineers and Constructors, that an apparent violation of Division 1 and Division 2 cable separation criteria' existed. While reviewing the wiring diagram for the RCIC System in preparation for a proposed plant modification it was determined that two non-ESS Division 2 cables were intermixed with one ESS Division 1 cable in a controlled logic panel in the Control Room. The deficiency is in the area of control cabinets internal wiring separation for logic. wiring associated with the RCIC steam line isolation valves E51-F007 and E51-F008. This problem is currently being re. viewed by plant engineering.

Very truly yours, b

C. R. Dietz, General Manager Brunswick Steam Electric Plant RMP/mcg cc: Mr. R. A. Hartfield Mr. V. Stello, Jr.

8107310234 810720 D'S gf 0 PDR ADOCK 05000324 PDR S