BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With
ML20199E735
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/31/1998
From: Jefferson F, Jury K
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-99-0005, BSEP-99-5, NUDOCS 9901210068
Download: ML20199E735 (8)


Text

-

4 6

CP&L Carolina Power & Ught Company P.O. Box 10429 Southport, NC 28461-0429 January 11,1999 SERIAL: BSEP 99-0005 FILE: B09-13510C U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 DECEMBER 1998 MONTHLY OPERATING REPORT Gentlemen:

In accordance with Technical Specification (TS) 5.6.4 for the Brunswick Steam Electric Plant (BSEP), Unit Nos. I and 2, Carolina Power & Light Company is submitting the enclosed report of operating statistics and shutdown experience for the month of December 1998. This report is being submitted to the NRC by the 15th day of the month following the calendar month covered by the report as specified in TS 5.6.4. No regulatory commitments are contained in this letter.

Please refer any questions regarding this submittal to Mr. Warren J. Dorman, Supervisor -

Licensing, at (910) 457-2068.

Sincerely, b L Keith R. Jury Manager- Regulatory Affairs Brunswick Steam Electric Plant KRJ/dch

~

rG b0q 'l .

I

Enclosures:

,2 v

1. BSEP, Unit No.1 Monthly O'perating Report December 1998
2. BSEP, Unit No. 2 Monthly Operating Report December 1998 l 9901210068 981231 E l kDR ADOCK 05000324 PM ir-i i . - . .

Document Control Desk .  ;

L- BSEP 99-0005 / Page 2 l cc (with enclosures):'

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr.Luis A.Reyes, Regional Administrator  ;

Atlanta Federal Center-

  1. 61 Forsyth Street, SW, Suite 23T85 ,

,9 Atlanta,GA 30303 l U. S. Nuclear Rega nory Commission ATTN: Mr. Theodore A. Eastick, NRC Senior Resident Inspector  ;

8470 River Road  :

l Southport,NC 28461 U. S. Nuclear Regulatory Commission ATTN: Mr. David C. Trimble, Jr. (Mail Stop OWFN 14H22) 11555 Rockville Pike Rockville, MD '20852-2738 -

Ms. Jo A. Sanford Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Electricities of N. C., Inc.

ATTN: Mr. Clarence C. Wells P.O. Box 29513 L Raleigh, NC 27626-0513 r

l l

- - - ... - . - _.. .__ - ,_. _ ~ . _ . -. . -

ENCLOSUREI BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 l DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 l

l l

i l

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO.1 MONTHLY OPERATING REPORT

[

DECEMBER 1998 l

l l

i. l l

l l

l

. .- l APPENDIX A OPERATING DATA REPORT j 1

! DOCKET NO. 50-325 l UNIT NAME Brunswick Steam Electric Plant, Unit No. I DATE January 6,1999 COMPLETED BY Frank Jefferson TELEPHONE (910) 457-2064 l

REPORTING PERIOD December 1,1998 to December 31,1998 (Month / Year) i l

l I

l YEAR I TO I MONTH DATE CUMULATIVE

1. Design Electrical Rating: 867 N/A N/A (MWe-Net) j
2. Maximum Dependable Capacity: 820 N/A N/A l (MWe-Net) j
3. Number of Hours the Reactor Was Critical: 744 7,927 127,512
4. Number of Hours the Generator V'as On Line: 744 7,813 123,213 i l 5. Unit Reserve Shutdown Hours: 0 0 0 i

l

6. Net Electrical Energy (MWH): 610,139 6,360,44I 88,302,338 1

i i

1 l

l l

APPENDIX B -

UNIT SHUTDOWNS DOCKET NO. 50-325 ,

UNIT NAME Brunswick Steam Electric Plant, Unit No. I DATE January 6,1999 COMPLETED BY Frank Jefferson TELEPHONE (910) 457-2064 REPORTING PERIOD December 1 to December 31,1998 .

(Month / Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/ CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS Unit No. I was not required to shut down in December 1998.

SUMMARY

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restrictsn 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)

F- Administrative G - Operational Error (Explain) 11 - Other (Explain)  ;

. .. - - . - - . -.. - .. . . - - . - - . . - . _ . ~ . . . _ _ _ _ . - = . . -

ENCLOSURE 2 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 .

DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62

'l

\, 1 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 MONTHLY OPERATING REPORT DECEMBER 1998 l

l l

l l

APPENDIX A OPERATING DATA REPORT 1

DOCKET NO. 50-324 UNIT NAME Brunswick Steam Electric Plant, Unit No. 2 DATE January 6,1999 COMPLETED BY Frank Jefferson TELEPHONE (910) 457-2064 REPORTING PERIOD December 1,1998 to December 31,1998 (Month / Year)

YEAR TO MONTH DATE CUMULATIVE

1. Design Electrical Rating: 867 N/A N/A (MWe-Net)
2. Maximum Dependable Capacity: 811 N/A N/A (MWe-Net)
3. Number of Hours the Reactor Was Critical: 744 8,586 137,282
4. Number of Hours the Generator Was On Line: 744 8,540 131,514
5. Unit Reserve Shutdown Hours: 0 0 0
6. Net Electrical Energy (MWH): 616,286 6,963,477 90,256,190 t

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-324 Brunswick Steam Electric Plant, Unit No. 2 UNIT NAME DATE January 6,1999 COMPLETED BY Frank Jefferson TELEPHONE (910) 457-2064 REPORTING PERIOD December 1 to December 31.1998 (Month / Year)

NO. DAT11 TYPE DURATION REASON (1) METIIOD OF CAUSE/ CORRECTIVE ACTIONS F: FORCED (liOURS) SIIUTTING S: SCliEDULED DOWN (2) COMMENTS Unit No. 2 was not required to shut down in December 1998.

SUMMARY

(I) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip /Saam C - Refuelmg 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explam)

F- Administrative G - Operational Error (Explain)

II - Other (Explain)

-- , . . . .