ML20011A731
From kanterella
ML20011A731 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 10/19/1981 |
From: | Starkey R CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
Shared Package | |
ML20011A729 | List: |
References | |
IEB-79-01B, IEB-79-1B, LER-80-014-01T, LER-80-14-1T, NUDOCS 8110290361 | |
Download: ML20011A731 (2) | |
Similar Documents at Robinson | |
---|---|
Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML20024B7371983-07-0505 July 1983
[Table view]LER 83-011/03L-0:on 830605,circuit Breaker for Boron Injection Tank Heater Channel B Tripped.Caused by Component Failure Due to Normal End of Life.Failed Heater Replaced. W/830705 Ltr ML20023E0791983-05-27027 May 1983 LER 83-007/03L-0:on 830429,PORV RC-455C Failed to Meet Required Cycle Time & Failed to Open Fully on Subsequent Attempt.Caused by Galling of Valve Plug to Cage Due to Rubbing of Stainless Steel in Dry condition.W/830527 Ltr ML20023E0671983-05-26026 May 1983 LER 83-006/03L-0:on 830427,during Testing of Spare Pump Installed to Replace Svc Water Pump A,Pump Tripped on Overcurrent.Apparently Caused by Internal Binding of Shaft as Result of Debris in Impeller assembly.W/830526 Ltr ML20028D2441983-01-0707 January 1983 Updated LER 80-009/01T-1:on 800414,primary to Secondary Leak of Approx 0.5 Gpm Detected in B Steam Generator,Exceeding Tech Spec Limit.Caused by Leaking Tubes.Leaks Repaired by Explosive Plugging ML20028B0691982-11-17017 November 1982 LER 82-017/01L-0:on 821104,w/unit at 80% Power,Operator Discovered Isolation Valve Tank Isolation Valve Closed.Cause Undetermined.Valve Locked Open & Procedures Changed to Ensure That Valve Remains Open ML20027D9181982-11-0303 November 1982 Updated LER 82-005/01T-1:on 820628,during Refueling Shutdown,Main Steam Check Valve B Found in Degraded Condition.Caused by Set Screws Which Lock Valve Disc tail- Piece to Rockshaft Loosened by Vibration.Set Screws Staked ML20050C2911982-03-25025 March 1982 Updated LER 79-034/03L-1:on 790918,motor Operated Isolation Valve AFW-V2-16A in Auxiliary Feedwater Line to Steam Generator a Failed to Open During Monthly Periodic Test. Caused by Power Supply Breaker Trip on Previous Closure ML20042A5711982-03-0909 March 1982 LER 82-002/03L-0:on 820207,condensate Measuring Sys Breaker HVH-1 Tripped During Periodic Testing.Caused by Reverse Rotation Due to Missing Discharge Damper Louver.Reverse Rotation Stopped.Damper Repairs Underway ML20049J5071982-03-0202 March 1982 LER 81-033/01X-1:on 811228,error in Tech Specs Heatup & Cooldown Curves Determined to Be Reportable.Caused by Calculational Mistake & Not Revised Due to Administrative Error.Corrected Curves & Calculations Will Be Submitted ML20040B5701982-01-11011 January 1982 LER 81-033/01T-0:on 811228,error in Tech Spec Heatup & Cooldown Curves Found to Be Not Reported to Nrc.Caused by Administrative Reporting Failure & Errors in Calculation. Info Will Be Reported as Tech Spec Change by 820131 ML20040C9471982-01-0808 January 1982 LER 81-034/03L-0:on 811211,loop 2 Steamline Pressure Channel Indicated Higher than Other Channels.Caused by Frozen Sensing Lines in Pressure Transmitter & Failure to Return Freeze Protection Circuit to Svc After Maint ML20039F7481982-01-0404 January 1982 LER 81-032/03L-0:on 811205,boric Acid Transfer Pump a Tripped & Was Declared Inoperable.Caused by Error in Valve Lineup Procedure & Open Winding in Transfer Pump Motor. Procedure Revised & Motor Replaced ML20039F4831981-12-30030 December 1981 LER 81-029/03L-0:on 811130,w/unit at Hot Shutdown,Leak Was Discovered in Chemical & Vol Control Sys.Caused by Failed bonnet-to-body Gasket on Valve CVC-291.Gasket Replaced ML20039D3281981-12-23023 December 1981 LER 81-030/03L-0:on 811130,emergency Diesel Generator B Failed to Reach Rated Output Voltage Following Automatic Start Initiated by Safety Injection Signal.Caused by Faulty auto-voltage Adjust Reostat.Failure Due to Normal Wear ML20039D1831981-12-23023 December 1981 LER 81-028/03L-0:on 811125,steam Generator low-low Level Trip & Alarm Bistables BS-494-A1 & BS-494-A2 Found to Be Inoperable During Periodic Test PT-5.5 W/Unit at Cold Shutdown.Caused by Failure of Instrument Channel LI-494 ML20038C9061981-12-0404 December 1981 LER 81-026/01T-0:on 811120,primary to Secondary Leak of Approx 1.5 Gpm Found in Steam Generator A.Caused by Leaking Explosive Plug.Plant Shut Down,Plug Removed & Weld Repaired on 811127 ML20038C7281981-12-0202 December 1981 LER 81-025/03L-0:on 811102,emergency Diesel Generator B Failed to Start Manually.Caused by Loss of Prime in Fuel Oil Sys,Possibly Due to Debris in Ball Check Valve.Generator Returned to Svc ML20011A6211981-10-20020 October 1981 Updated LER 81-007/01T-1:on 810122,potential Modeling Error in ECCS Model Used for LOCA Analysis Reported.Caused by Shift in Peak Clad Temp.New ECCS Analysis Performed in Aug 1981.No Impact on Public Health & Safety ML20011A7311981-10-19019 October 1981 Updated LER 80-014/01T-1:on 800702,vendor Info Indicated That No Certification of Qualification Was Available for PVC Electric Cable Pigtails Used on Eight Penetrations.Cable Pigtails Meet Design Specs & Accident Requirements ML20011A3451981-10-0101 October 1981 LER 81-020/03L-0:on 810902,containment Spray Check Valve SI-890B & Associated Flow Path Declared Inoperable.Caused by Failure to Perform Post Maint Testing Prior to Startup Due to Oversight.Valve Tested.Procedures Will Be Revised ML20010B0731981-08-0404 August 1981 LER 81-019/03L-0:on 810705,w/unit at 95% Power,Svc Water Booster Pump (Swbp) a Motor Tripped.On 810706,SWBP a Motor Tripped Again.Caused by Normal Wear of Motor Bearings & Possible Breaker Problem,Respectively ML20009H6101981-07-31031 July 1981 LER 81-018/03L-0:on 810701,Channel I (PI-474) of a Steam Generator Steam Line Pressure Indicated High Compared to Two Redundant Channels.Caused by Throttled Root Isolation Valve MSV-14.Valve Reopened ML20009H3581981-07-30030 July 1981 Updated LER 81-004/03L-1:on 810116,primary Coolant Sys Leak Found.Caused by Sample Cooler Tube Bundle Leakage Due to Normal Wear.Bundle Replaced.Review of Maint Records Revealed No Generic Problems ML20009E5561981-07-16016 July 1981 LER 81-017/03L-0:on 810619,auxiliary Feedwater Pump a Tripped on Low Discharge Pressure.Caused by Improper Throttle Setting of Discharge Valve.Valve Repositioned ML20009G1181981-07-10010 July 1981 LER 81-016/03L-0:on 810611,during Startup,Motor Driven Auxiliary Feedwater Pump a Tripped Due to Low Discharge Pressure While Feeding Steam Generators.Event Reoccurred on 810716.Caused by Backleakage Through Discharge Valve AFW-40 ML20005A1921981-06-24024 June 1981 LER 81-015/03L-0:on 810525,computer Box FM-475 Found to Be Out of Acceptable Tolerances & Several Checkpoints Showed Erratic Readings During Loop a Steam Flow Channel Investigation.Caused by Two Worn Electronic Components ML20009G0181981-06-22022 June 1981 LER 81-014/03L-0:on 810523,discovered That Hagan Summator PM-446B Had Shifted Nonconservatively Approx 3%.Caused by Failure of Filter Capacitor Due to Normal Wear.Faulty Capacitor Replaced ML20004E7441981-06-0909 June 1981 Updated LER 81-013/03L-1:on 810415,determined Containment Isolation Valves Not Tested in Required Manner.Seven of Eight Valves Functioning as Designed.Eighth Valve Tested & Shown Operable.Test Undergoing Revision 1983-07-05 Category:RO) MONTHYEARML20024B7371983-07-0505 July 1983
[Table view]LER 83-011/03L-0:on 830605,circuit Breaker for Boron Injection Tank Heater Channel B Tripped.Caused by Component Failure Due to Normal End of Life.Failed Heater Replaced. W/830705 Ltr ML20023E0791983-05-27027 May 1983 LER 83-007/03L-0:on 830429,PORV RC-455C Failed to Meet Required Cycle Time & Failed to Open Fully on Subsequent Attempt.Caused by Galling of Valve Plug to Cage Due to Rubbing of Stainless Steel in Dry condition.W/830527 Ltr ML20023E0671983-05-26026 May 1983 LER 83-006/03L-0:on 830427,during Testing of Spare Pump Installed to Replace Svc Water Pump A,Pump Tripped on Overcurrent.Apparently Caused by Internal Binding of Shaft as Result of Debris in Impeller assembly.W/830526 Ltr ML20028D2441983-01-0707 January 1983 Updated LER 80-009/01T-1:on 800414,primary to Secondary Leak of Approx 0.5 Gpm Detected in B Steam Generator,Exceeding Tech Spec Limit.Caused by Leaking Tubes.Leaks Repaired by Explosive Plugging ML20028B0691982-11-17017 November 1982 LER 82-017/01L-0:on 821104,w/unit at 80% Power,Operator Discovered Isolation Valve Tank Isolation Valve Closed.Cause Undetermined.Valve Locked Open & Procedures Changed to Ensure That Valve Remains Open ML20027D9181982-11-0303 November 1982 Updated LER 82-005/01T-1:on 820628,during Refueling Shutdown,Main Steam Check Valve B Found in Degraded Condition.Caused by Set Screws Which Lock Valve Disc tail- Piece to Rockshaft Loosened by Vibration.Set Screws Staked ML20050C2911982-03-25025 March 1982 Updated LER 79-034/03L-1:on 790918,motor Operated Isolation Valve AFW-V2-16A in Auxiliary Feedwater Line to Steam Generator a Failed to Open During Monthly Periodic Test. Caused by Power Supply Breaker Trip on Previous Closure ML20042A5711982-03-0909 March 1982 LER 82-002/03L-0:on 820207,condensate Measuring Sys Breaker HVH-1 Tripped During Periodic Testing.Caused by Reverse Rotation Due to Missing Discharge Damper Louver.Reverse Rotation Stopped.Damper Repairs Underway ML20049J5071982-03-0202 March 1982 LER 81-033/01X-1:on 811228,error in Tech Specs Heatup & Cooldown Curves Determined to Be Reportable.Caused by Calculational Mistake & Not Revised Due to Administrative Error.Corrected Curves & Calculations Will Be Submitted ML20040B5701982-01-11011 January 1982 LER 81-033/01T-0:on 811228,error in Tech Spec Heatup & Cooldown Curves Found to Be Not Reported to Nrc.Caused by Administrative Reporting Failure & Errors in Calculation. Info Will Be Reported as Tech Spec Change by 820131 ML20040C9471982-01-0808 January 1982 LER 81-034/03L-0:on 811211,loop 2 Steamline Pressure Channel Indicated Higher than Other Channels.Caused by Frozen Sensing Lines in Pressure Transmitter & Failure to Return Freeze Protection Circuit to Svc After Maint ML20039F7481982-01-0404 January 1982 LER 81-032/03L-0:on 811205,boric Acid Transfer Pump a Tripped & Was Declared Inoperable.Caused by Error in Valve Lineup Procedure & Open Winding in Transfer Pump Motor. Procedure Revised & Motor Replaced ML20039F4831981-12-30030 December 1981 LER 81-029/03L-0:on 811130,w/unit at Hot Shutdown,Leak Was Discovered in Chemical & Vol Control Sys.Caused by Failed bonnet-to-body Gasket on Valve CVC-291.Gasket Replaced ML20039D3281981-12-23023 December 1981 LER 81-030/03L-0:on 811130,emergency Diesel Generator B Failed to Reach Rated Output Voltage Following Automatic Start Initiated by Safety Injection Signal.Caused by Faulty auto-voltage Adjust Reostat.Failure Due to Normal Wear ML20039D1831981-12-23023 December 1981 LER 81-028/03L-0:on 811125,steam Generator low-low Level Trip & Alarm Bistables BS-494-A1 & BS-494-A2 Found to Be Inoperable During Periodic Test PT-5.5 W/Unit at Cold Shutdown.Caused by Failure of Instrument Channel LI-494 ML20038C9061981-12-0404 December 1981 LER 81-026/01T-0:on 811120,primary to Secondary Leak of Approx 1.5 Gpm Found in Steam Generator A.Caused by Leaking Explosive Plug.Plant Shut Down,Plug Removed & Weld Repaired on 811127 ML20038C7281981-12-0202 December 1981 LER 81-025/03L-0:on 811102,emergency Diesel Generator B Failed to Start Manually.Caused by Loss of Prime in Fuel Oil Sys,Possibly Due to Debris in Ball Check Valve.Generator Returned to Svc ML20011A6211981-10-20020 October 1981 Updated LER 81-007/01T-1:on 810122,potential Modeling Error in ECCS Model Used for LOCA Analysis Reported.Caused by Shift in Peak Clad Temp.New ECCS Analysis Performed in Aug 1981.No Impact on Public Health & Safety ML20011A7311981-10-19019 October 1981 Updated LER 80-014/01T-1:on 800702,vendor Info Indicated That No Certification of Qualification Was Available for PVC Electric Cable Pigtails Used on Eight Penetrations.Cable Pigtails Meet Design Specs & Accident Requirements ML20011A3451981-10-0101 October 1981 LER 81-020/03L-0:on 810902,containment Spray Check Valve SI-890B & Associated Flow Path Declared Inoperable.Caused by Failure to Perform Post Maint Testing Prior to Startup Due to Oversight.Valve Tested.Procedures Will Be Revised ML20010B0731981-08-0404 August 1981 LER 81-019/03L-0:on 810705,w/unit at 95% Power,Svc Water Booster Pump (Swbp) a Motor Tripped.On 810706,SWBP a Motor Tripped Again.Caused by Normal Wear of Motor Bearings & Possible Breaker Problem,Respectively ML20009H6101981-07-31031 July 1981 LER 81-018/03L-0:on 810701,Channel I (PI-474) of a Steam Generator Steam Line Pressure Indicated High Compared to Two Redundant Channels.Caused by Throttled Root Isolation Valve MSV-14.Valve Reopened ML20009H3581981-07-30030 July 1981 Updated LER 81-004/03L-1:on 810116,primary Coolant Sys Leak Found.Caused by Sample Cooler Tube Bundle Leakage Due to Normal Wear.Bundle Replaced.Review of Maint Records Revealed No Generic Problems ML20009E5561981-07-16016 July 1981 LER 81-017/03L-0:on 810619,auxiliary Feedwater Pump a Tripped on Low Discharge Pressure.Caused by Improper Throttle Setting of Discharge Valve.Valve Repositioned ML20009G1181981-07-10010 July 1981 LER 81-016/03L-0:on 810611,during Startup,Motor Driven Auxiliary Feedwater Pump a Tripped Due to Low Discharge Pressure While Feeding Steam Generators.Event Reoccurred on 810716.Caused by Backleakage Through Discharge Valve AFW-40 ML20005A1921981-06-24024 June 1981 LER 81-015/03L-0:on 810525,computer Box FM-475 Found to Be Out of Acceptable Tolerances & Several Checkpoints Showed Erratic Readings During Loop a Steam Flow Channel Investigation.Caused by Two Worn Electronic Components ML20009G0181981-06-22022 June 1981 LER 81-014/03L-0:on 810523,discovered That Hagan Summator PM-446B Had Shifted Nonconservatively Approx 3%.Caused by Failure of Filter Capacitor Due to Normal Wear.Faulty Capacitor Replaced ML20004E7441981-06-0909 June 1981 Updated LER 81-013/03L-1:on 810415,determined Containment Isolation Valves Not Tested in Required Manner.Seven of Eight Valves Functioning as Designed.Eighth Valve Tested & Shown Operable.Test Undergoing Revision 1983-07-05 Category:TEXT-SAFETY REPORT MONTHYEARML20217A1691999-09-22022 September 1999
[Table view]Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers RA-97-0258, LER 97-S12-00:on 971119,discovered Uncompensated Security Zone.Caused by Inattention to Detail by Members of Security Force.Provided Event Info to Security Shift Personnel & Changed Practice Re Zone Review1997-12-19019 December 1997 LER 97-S12-00:on 971119,discovered Uncompensated Security Zone.Caused by Inattention to Detail by Members of Security Force.Provided Event Info to Security Shift Personnel & Changed Practice Re Zone Review ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20217Q2751997-06-30030 June 1997 CP&L Fitness for Duty Program Performance Data for Period 970101-0630 ML14183A6951995-09-18018 September 1995 Safety Evaluation Approving Relocation of Technical Support Ctr ML20059H7721994-01-17017 January 1994 Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 ML17352A8691993-05-31031 May 1993 Technical Rept, Assessment of Aging Degradation of Civil/ Structural Features at Selected Operating Nuclear Power Plants. ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20118B4391992-09-11011 September 1992 Part 21 Rept Re Degradation in Abb Type 27N Undervoltage Relays Used in Electrical Switchgear.Recommends That Users Review Applications Requiring Exposures Greater than 1E03 Rads TID W/Time Delay Function Option ML20079H1571991-09-30030 September 1991 Nonproprietary Evaluation of Revised Transfer to Cold Leg Recirculation Procedure,Hb Robinson Unit 2 ML20086T2951991-06-14014 June 1991 Rev 1 to EQ Documentation Package Eqdp 36.0, Boston Insulated Wire Cable ML20086T2861991-03-0808 March 1991 Rev 1 to EQ Documentation Package Eqdp 11.1, Dekoron Instrumentation Cables ML20086T2561991-03-0808 March 1991 Rev 1 to EQ Documentation Package 10.0, Continental Shielded Instrument Cable ML20065K6961990-10-31031 October 1990 Mechanical Licensing Rept for Hb Robinson High Thermal Performance Fuel Assemblies ML20065K6971990-10-31031 October 1990 Thermal Hydraulic Compatibility Analysis of Anf High Thermal Performance Fuel for Hb Robinson,Unit 2 ML20005G6831990-01-0505 January 1990 Part 21 Rept Re Installation Instructions for Grommet Use Range for Patel Conduit Seal P/N 841206.Conduit Seals in Environ Qualification Applications Inspected for Proper Wire Use Range & Grommets Replaced ML20247E0701989-07-20020 July 1989 Info Rept:On 890717-0804,fire Penetration Seals Will Be Removed from Svc to Allow Access for Ventilation Sys Mod. Addl Fire Barrier Penetrations Will Be Made in Wall Between RHR Pump Pit & Fuel Handling Bldg,Per Tech Spec 3.14.7.2 ML20246E9111989-03-31031 March 1989 PDC-3:Advanced Nuclear Fuels Corp Power Distribution Control for PWRs & Application of PDC-3 to Hb Robinson Unit 2 ML20245H0821989-01-25025 January 1989 Criticality Safety Analysis of Hb Robinson Spent Fuel Pool W/4.2% Nominal Enrichment Fuel Assemblies ML20205T0551988-10-31031 October 1988 Responses to NRC Questions on RTD Bypass Elimination Licensing Rept ML20147E2371988-02-29029 February 1988 1987 Annual Rept - Primary Coolant Iodine Spikes ML20147B1971987-12-31031 December 1987 1987 Annual Rept - Primary Safety & Relief Valve Challenges ML20236K7731987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235W3781987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20238E2741987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20235H3151987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML17261A5301987-06-18018 June 1987 Part 21 Rept Re Potential Util Failure to Comply W/Component Containment Isolation Licensing Commitment If Proposed Mods to Component Cooling Water Sys Instituted.Utils Advised to Evaluate Containment Isolation Sys ML20214W3241987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214R5101987-04-30030 April 1987 Rev 1 to Monthly Operating Rept for Apr 1987,correcting Operation Statistics & Shutdown Experience Due to Mathematical Errors ML20215L4941987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206F3561987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20210B4141987-03-31031 March 1987 Revised Monthly Operating Rept for Mar 1987 ML20205F6021987-03-23023 March 1987 Special Rept:On 870302,noble Gas Effluent Monitor for Main Steam Line B Declared Inoperable & Svc Not Returned Until 870312.Caused by Defective Detector.Detector Replaced.High Voltage for Detector Adjusted & Sys Operation Checked ML20212P3101987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20214Q7891987-01-31031 January 1987 Cycle 12,SAR ML20210R6341987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20207M2451986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 L-18-120, Rev 0 to Supplemental Info in Support of Conservatisms in Criticality Analysis Performed for Hb Robinson Isfsi1986-12-18018 December 1986 Rev 0 to Supplemental Info in Support of Conservatisms in Criticality Analysis Performed for Hb Robinson Isfsi ML20215C7911986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20213F3121986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20215G1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20215F0361986-09-29029 September 1986 Special Rept:On 860902,during Cold Shutdown,Pressurizer PORV Lifted Twice to Prevent Overpressurization.Caused by Inadvertent Action by Unit Operators.Operations Personnel Counseled Re Importance of Breaker Position Indicators ML20211C0641986-09-0909 September 1986 Rev 0 to Final Rept Criticality Safety Analysis Hb Robinson Spent Fuel Storage Racks (Unpoisoned,Low Density) W/4.2% Enriched 15x15 Fuel Assemblies ML20211C0491986-09-0202 September 1986 Rev 0 to Final Rept Criticality Safety Analysis Hb Robinson New Fuel Storage Vault W/4.2% Enriched 15x15 Fuel Assemblies ML20212F5321986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20203D0221986-07-14014 July 1986 Part 21 Rept Re Air Monitoring Sys Probes Exhibiting Blue Tip Rather than Normal White Tip & Insensitive to Chlorine. Caused by Improper Handling/Storage.Advisory Bulletin Encl. Item Not Reportable Per Part 21 ML20202G3371986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211B5601986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20197D2651986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 1999-09-22 |