05000261/LER-1981-014-03, /03L-0:on 810523,discovered That Hagan Summator PM-446B Had Shifted Nonconservatively Approx 3%.Caused by Failure of Filter Capacitor Due to Normal Wear.Faulty Capacitor Replaced

From kanterella
(Redirected from ML20009G018)
Jump to navigation Jump to search
/03L-0:on 810523,discovered That Hagan Summator PM-446B Had Shifted Nonconservatively Approx 3%.Caused by Failure of Filter Capacitor Due to Normal Wear.Faulty Capacitor Replaced
ML20009G018
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/22/1981
From: Graham J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009G014 List:
References
LER-81-014-03L, LER-81-14-3L, NUDOCS 8108030247
Download: ML20009G018 (2)


LER-1981-014, /03L-0:on 810523,discovered That Hagan Summator PM-446B Had Shifted Nonconservatively Approx 3%.Caused by Failure of Filter Capacitor Due to Normal Wear.Faulty Capacitor Replaced
Event date:
Report date:
2611981014R03 - NRC Website

text

N U.S. NUCLEAR REGULATORY COMMISSION (7 77)

LICENSEE EVENT REPORT G% TROL BLOCX: l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQUIRED IRFORMATIOR) 1 6

lo lil I s I c l u IB In l 2 l@l010 l-l01010 lo lo l In ln l@l 41 11 1l 11 11@l I

l@

7 8 9 LICENSEE CODE 14 15 LICENSE NUVBEH 25 26 LICENSE TYPE JO b1 CAI b8 CON'T lolil 3$ [y l L l@l 0 l 5 l 010 l0 l 2 l 6 l 1 @l0l5l2 l3 l8 11 @l0 l 6 l 2 l 2 l 8 l1 l@

7 8

60 61 DOCKET NUMiiER 68 69 EVENT DATE 74 75 REPOHT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h I o 12 l lon May 23, 1981, at approximately 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> with the pInnt in cold shutdown, a l

l o 131 l routine instrument calibration identified that the Hagan Summator, PM-446B, which l o l4 l ldctermines the high steam line flow setpoint for reactor protection safeguards, had I

lo isl l shifted nonconservatively approximately 3%.

This shift would have delayed but not l

l O l6 l l prevented the fulfillment of the protection functions of this channel.

In addition.

I l 0 l 7 l lthe redundant channel was operational so there was no threat to the health and safetv I of the public. This is contrary to Technical Specification 3.5.1 and is reportable t O ls l l pursuant to 6.9.2.b.1.

I 7

8 9 80 DE CODE SLECO E

' COMPONENT CODE SUBC DE SU DE

. l B lh lE lh Wh l Il NI S l Tl R l U lh W@ lZ l@

10191 1

7 8

9 10 11 12 13 18 19 40 SEQUE NTI AL OCCURRENCE REFORT REVISION LE R RO EVENT YEAR REPORT NO.

CODE TYPE NO.

@,R'[gR; l 3l 1l

[--j l 0l 1l 4l l/l l0 l3 l lL l l-l l0 l u

_ 21 27 23 74 26 27 28 29 30 31 32 AKLF A T ON ON PLA T ET HOURS S P ITi D Fo 1 UB.

SL PLIE MAN FA URER [E_jgl4 Zl@

l Z l@

J@

l0l0l0l0l W@

lYl@

lNl@

l W [ 1 l 2 l 0 l@

33 3

35 M

31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS l i l o l lThe cause of this event was the failure of a filter capacitor.

This failure is attri-l 4 1 li l lbuted to normal wear resulting in the end-of-life of the ccmponent. The faultv capa-I g g lcitar was replaced and the module recalibrated on May 23, 1981.

I i t al l l

ITiTl I l

7 8 9 80 A S

% POWE R OTHER STATU3 15 OV RY DISCOVERY DESCRIPTION i ls l W@ l 0l Gl 0l@l NA l

lBl@l Routine Recalibration l

' A!nvlTv CohT i l6] ( Zj @ l Zl@l AMOUNTOF ACTIVnY @ l LOCAHON OF RELEASE @

RELEASED OF red ASE NA l

NA l

t

/

8 9 to 11 44 45 E0 PERSONNEL EXPOSURES NUMBEH TYPE DE!CRIPTION i l 7 l l 0 l 0 l 0j@l Z l@l NA l

PE RSoNM'imunS DESCn+ HON @

NuMei n ls l l 0 l 0 l 0 l@l i

NA l

8 9 li 12 80 TOSS OF OH DAMAGE TO F AC'LiTY TYPE D E SC RIP TION 1191 W hl NA l

8 9 10 80 g hSSUEhl ESCRIPTION I

NA l

lllllllllllll,1 81b803024' 010622 PDR ADsCK 05000261 J. E. Graham

@M WM pgggg; a,

S PDR JL

1

),..

Supplemental Information i

for Licensee Event Report 81-014 i

1 1.

Cause Description and Analysis on May 23, 1981, at approximately 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> with the plant at cold shutdown, a routine iastrument calibration identified that the llagan Summator (PM-446B) in the first stage turbine pressure i

channels which develops.the high steam line flow setpoint for a

reactor protection safeguards had shifted nonconservatively 4

approximately 3%.

This shift would have delayed but not prevented the fulfillment of the protection functions of this channel. The redundant channel was operational co there was no threat to the j

health and safety of the public.

This event, which is contrary to Technical Specification 3.5.1, is reportable under Technical j

Specification 6.9.2.b.1.

2.

Corrective Action

The cause of this event was found to be the failure of a filter capacitor. This failure is attributed to normal wear resulting in the end-of-life of the component. The faulty capacitor was replaced and the module recalibrated on May 23, 1981.

3.

_ Corrective Action to Prevent Further Occurrence Since the failure is attributed to normal wear, no further action is required. The module is teste'd and recalibrated yearly.

)

)