ML20039D183

From kanterella
Jump to navigation Jump to search
LER 81-028/03L-0:on 811125,steam Generator low-low Level Trip & Alarm Bistables BS-494-A1 & BS-494-A2 Found to Be Inoperable During Periodic Test PT-5.5 W/Unit at Cold Shutdown.Caused by Failure of Instrument Channel LI-494
ML20039D183
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/23/1981
From:
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20039D180 List:
References
LER-81-028-03L, NUDOCS 8112310400
Download: ML20039D183 (3)


Text

NRC FORM J66 U.S. NUCLEAR REGULATORY COMMISSION (7 77) d LICENSEE EVENT REPORT CONTROL BLOCX: l l l l l l l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6 l0 l 18 l9 l S l LICENSEE 7

C l H CODE l B { R14l 2 15l@l 0 l 0 l - lLICENSE 0 l 0NUMBER l 0 l 0 l 0 l- l 0 25l 0 l@l 26 4LICENSE l 1 l 1TYPE l 1J0l 1 l@l l 57 CAI b6 l@

COB *T lo111 $u"CE' 60l L l@l 0 l 5 l DOCKET 0 l 0 NUMBER l 0 l 2 l 6 l 168 @l691 l 1EVENT l 2 lDATE 5 l 8 l 1 74]@l75 l j 'l l REPORT D ATE l

BC l@

7 8 61 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h l o 121 lOn November 25, 1981, at approximately 1710 hours0.0198 days <br />0.475 hours <br />0.00283 weeks <br />6.50655e-4 months <br /> with the unit at colc! shutdown. the I g o ,3 ; [ steam genaator low-low level trip and alarm bistables BS-494-Al and BS-494-A2 were l lo l4 j lfound to be inoperable during the performance of Periodic Test PT-5.5. This event I 10 I s l Iresulted in less than the minimum degree of redundancy required by Technical i lo le i ISPecification table 3.5-2 and is reportable pursuant to 6.9.2.b.2. Since the other 1 jog 7; l channels were operable, there was no threat to the public health and safety. I l

10181 l DE CODE S 8C E COMPONENT CODE SUBC DE SU DE l0l9l l 1l Al@ [E j@ lF l@ l Il Nl S l Tl Rl Ul@ g@ y @ 18 19 20 7 8 9 10 11 12 13 SE QUENTI AL OCCUR RE NCE REPORT REVISION EVENT YEAR REPORT NO. CODE TYPE No.

LER

@ ,ajm.RO g I 81 11 1-1 1012l8l l-l l0l3l [L j

[_j [0j

_ 21 22 23 24 a6 27 28 29 30 31 J2_

ON PLA T ME HOURS 22 SB IT FOR V6. SUPPL MANUFACTURER

)

Wg K N A ON l3J C 34lgyg yg 35 l36Zl@

l0 l0 l0 l0 l 31 40 41 l42Nl@ W@

43 l44H l 0 l 2 l 1l@

47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l i l 0 l lI nstrument Channel LI-494 wa s declared inoperable and the bistables were tripped l i i panually at 1740 hours0.0201 days <br />0.483 hours <br />0.00288 weeks <br />6.6207e-4 months <br />. The failed component, LC-494A was replaced with a new unit. I I

, , palibrated, tested, and the instrument channel was declared operable at 2010 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.64805e-4 months <br /> on I g l November 25, 1981. This event is the result of component failure due to normal wear. I

, , , fo further action is considered necessary. l i

80 7 8 9

'STSNS  % POWER OTHER STATUS DlS RY DISCOVEnY DESCRIPTION y lG l@ l 0 l 0 l 0 l@l n/a l W @l Surveillance Test l ACTIVITY CO TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE n/a n/a l 7

i e 8 9 W @ lZl@l 10 11 44 l l 45 80 PERSONNEL EXPOSURES 1 7 l0lbl0l@ @l n/a l PERSONNE L INJURIES NUM8ER DESCRIPTION t a l0l0l0l@l n/a l

[ 80 l 7 8 9 11 12 l

LOSS OF OR DAMAGE TO FACILITY TYPE DESCRIPTION n/a l

. 7 9

8 9

@ @l10 80 PUBLICITY NRC USE ONLY *

- ISSUED DESCRIPTION 2 o lNlhl n/a ._

I llllllllllll11 8 9 10 68 69 80 s

[-

l 7

81123h0400811223,'

PDR A K 05000261- PHON E:

o j NAME OF PREPARER .PDR $

S

e s

SUPPLEMENTAL INFORMATION FOR LICENSEE EVENT REPORT 81-28

1. Cause Description and Analysis:

On November 25, 1981, at approxima tely 1710 hours0.0198 days <br />0.475 hours <br />0.00283 weeks <br />6.50655e-4 months <br /> with the unit at cold shutdown conditions, reactor protection bistables BS-494-Al and BS-494-A2 ("C" steam generator low-low level trip and and lo-lo level alarm respectively) were found inoperable during the performance of Periodic Test PT-5.5. BS-494-Al would not trip in response to test signals and BS-494-A2 was out of acceptable tole ra nce . Sub sequent investiga tion revealed tha t the failure was due to a bad filter capacitor in the power supply section of dual compara tor LC-494A.

Although the unit was in cold shutdown conditions, this event would have resulted in less than the minimum degree of redundancy required by Technical Specification table 3.5-2 during operation and is reportable pursuant to 6.9.2.b.2. Since the other two channels were operable, there was no threat to the public health and safety.

2. Corrective Action:

Instrument channel LI-494 was declared inoperable and the bistables were tripped manually at 1740 hours0.0201 days <br />0.483 hours <br />0.00288 weeks <br />6.6207e-4 months <br />. This res tored the minimum degree of redundancy required by Technical Specification table 3.5-2.

The failed component, LC-494A, was replaced with a new unit, calibrated, tested, and the instrument channel was declared operable a t 2010 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.64805e-4 months <br /> on November 25, 1981.

3. Corrective Action to Prevent Recurrence:

This event is the result of component failure due to normal wear.

No further action is considered necessary.

m