MONTHYEARML24107A9112024-04-15015 April 2024 NRC to Fws, Follow-up on Request for Concurrence for North Anna SLR ML24107A9122024-04-11011 April 2024 Fws to NRC, Follow-up on Request for Concurrence for North Anna SLR ML24087A0102024-03-26026 March 2024 NRR E-mail Capture - Verbal Relief for North Anna Unit 1 - (ASME Code), Section XI, Subsection IWB-2430 ML24087A0112024-03-23023 March 2024 NRR E-mail Capture - Draft RAIs for Reactor Coolant Pump (RCP) Relief Request (L-2024-LLR-0022) ML24107B1562024-02-20020 February 2024 Cherokee Nation E.Toombs Na Removal Request ML24044A2462024-02-0606 February 2024 001 Radiation Safety Baseline Inspection Information Request ML23320A1122024-01-18018 January 2024 NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23039A1712023-02-0808 February 2023 NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22342B1472022-12-0808 December 2022 NRR E-mail Capture - Acceptance Review for LAR Re NAPS Post LOCA Buffer Change (L-2022-LLA-0162) ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22104A0252022-04-14014 April 2022 NRR E-mail Capture - Dominion Presentation Slides for April 21, 2022 Public Meeting on Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML22032A0962022-02-0101 February 2022 002 Radiation Safety Baseline Inspection Information Request ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22007A2672022-01-0707 January 2022 NRR E-mail Capture - North Anna, Unit 2, ASME Section XI Inservice Inspection Program Relief Request N2-14-LMT-003 Fourth Interval Third Period Limited Examinations (L-2021-LLR-0088) ML21335A0812021-12-0101 December 2021 NRR E-mail Capture - Acceptance Review for OMN-28 Request Alternative to ISTC-3700, Position Verification Testing (L-2021-LLR-0086) ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21312A0082021-11-0404 November 2021 Enclosure 2 - NAPS Draft SER Table A.1-1 Markup ML21312A0012021-11-0404 November 2021 Comments on North Anna Draft SER ML21312A0112021-11-0404 November 2021 Enclosure 3 - NAPS Draft SER Section 3 Comments ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21274A0022021-09-30030 September 2021 NRR E-mail Capture - Acceptance Review for TSTF-577 LAR (L-2021-LLA-0158) ML21312A0072021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure B - NAPS SER App a - Dominion Comments 9-21-2021 ML21312A0032021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure a - Dominion Table A4.4-1 Clean Version ML21312A0022021-09-21021 September 2021 Enclosure 1 - E-mail - NAPS SLR SER Appendix a for Dominion Review ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21152A1722021-09-0707 September 2021 NRC to Fws, NRC Issuance of Draft Environmental Impact Statement for North Anna Subsequent License Renewal, Opportunity for Public Comment, and Endangered Species Act Determinations ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21225A5512021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21154A0152021-06-0101 June 2021 NRR E-mail Capture - Acceptance Review for Primary Grade Water LAR (L-2021-LLA-0082) ML21140A3682021-05-20020 May 2021 Response to North Anna Hardship (Temporary Staff Guidance Additional Guidance for FOF Inspections During the PHE) 2024-04-15
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24283A1442024-10-16016 October 2024 Main Steam Line Break Accident Analysis LAR Pre-Application Meeting ML24247A0042024-09-0303 September 2024 SLR Efficiencies Public Meeting - NRC Presentation - September 5, 2024 ML24108A0712024-04-30030 April 2024 Combined - 2023 Annual Assessment Public Meeting Slides ML24029A2362024-01-30030 January 2024 Preliminary Results of the Environmental Review, Subsequent License Renewal ML23338A1522023-12-0707 December 2023 Public Meeting Slides for North Anna and Surry Emergency Plan Augmentation Times License Amendment Request ML23255A0992023-09-15015 September 2023 Slides for September 15, 2023 Public Meeting on Poanhi Seismic Evaluations ML23103A3482023-04-14014 April 2023 Annual Assessment Meeting Presentation for North Anna and Surry ML21221A0332022-06-17017 June 2022 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML22091A0902022-04-0101 April 2022 Combined 2021 Assessment Meeting Slides ML21221A1482021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - NRC Slides ML21221A1542021-05-27027 May 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Dominion Slides ML21132A2892021-05-13013 May 2021 SLRA RAI Response Public Meeting ML21145A2172021-05-13013 May 2021 Discussion on May 13, 2021 with Dominion on Select Staff RAIs on North Anna Subsequent License Renewal Application - Dominion Slides ML21034A5972021-02-10010 February 2021 External Presentation Am Atkinson_Nrc ISG-06 Meeting Dominion Digital IC Project 02102021 ML20288A3472020-10-14014 October 2020 (COVID-19) Emergency Preparedness Exemption Pre-Application Meeting ML20099F2412020-04-0909 April 2020 Co., NRC Safety Pre& 8208;Application Meeting North Anna Power Station (NAPS) ML20099F2992020-04-0909 April 2020 NRC Slides for North Anna pre-app April 9 ML20098B6022020-04-0707 April 2020 Annual Assessment Meeting Presentation ML19297D1872019-11-18018 November 2019 Pre-Application Meeting - Dominion Slides ML18141A3072018-05-21021 May 2018 18 - SLR Status ML16124A7582016-05-0303 May 2016 April 14, 2016, Summer of Public Meeting - North Anna, Units 1 and 2 ML16124A7632016-05-0303 May 2016 April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2 ML15273A4292015-09-29029 September 2015 Revised Slides for September 29, 2015 Meeting with Dominion Re North Anna ISFSI License Renewal ML15153A0452015-05-13013 May 2015 Revised North Anna ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15133A0822015-05-13013 May 2015 ISFSI Presentation Slides - TN-32 High Burnup Dry Storage Research Project, May 13, 2015 (Tom Brookmire) ML15128A5462015-05-0808 May 2015 Summary of Public Meeting with North Anna, Units 1 and 2 to Discuss the Annual Assessment with the Public ML14058B1762014-03-0606 March 2014 Presentation Slides - North Anna ISFSI - High Burnup Dry Storage Confirmatory Data Project, TN-32 Storage Cask, Tom Brookmire, March 6, 2014, Docket No. 72-16, TAC No: L24886 ML14071A1672014-01-28028 January 2014 Enclosure 2: Presentation Slides - North Anna ISFSI TN-32 Cask and Pad 1 Assessments Following August 23, 2011, Central Virginia Earthquake ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12257A2002012-09-11011 September 2012 2-North Anna Extent of Condition Presentation 9-7-12 Sept 10 ML12257A2342012-09-11011 September 2012 5-Hacker - North Anna Mockup and Search Unit Action Presentation Sept 10 ML12131A5052012-05-0909 May 2012 Presentation for 2011 North Anna EOC Annual Assessment Meeting ML11305A0452011-11-0101 November 2011 Region II - North Anna Public Meeting Slides ML11305A0622011-11-0101 November 2011 Restart Readiness, Public Meeting PR2 ML1128500392011-10-12012 October 2011 Summary of Augmented Inspection Team Public Exit Meeting with Virginia Electric Power Company to Discuss the Results of an ATI Inspection of an Earthquake Event on August 23, 2011 ML11276A0242011-10-0303 October 2011 Slides-North Anna AIT Public Meeting October 3, 2011 ML1127701352011-10-0303 October 2011 Ltr to D. Heacock Re Participation in the Commission Meeting on the North Anna Plant on 10/21/11 ML11252A0062011-09-0808 September 2011 Dominion'S Slides Earthquake Response and North Anna Restart Readiness Demonstration Plan ML12040A2742011-08-31031 August 2011 E-Mail from G. Wilson, NRR to D. Merzke, EDO; Subject: Seismic Instruments at North Anna ML12044A2912011-08-30030 August 2011 E-mail from G. Bowman, EDO to T. Hipschman, Comm, Et Al; Subject: FYI-Revised Slides on North Anna/Gl-199 ML1124205512011-08-30030 August 2011 Seismic Event ML12044A2792011-08-30030 August 2011 Email from M. Khanna, NRR to R. Auluck, NRR FW: North Anna Earthquake Issue Commissioner Briefing Final with Talking Points ML12044A2572011-08-26026 August 2011 Email from A. Istar, NRR to A. Hiser, NRR on North Anna Nuclear Power Plant. Pptx ML1110304822011-04-13013 April 2011 Public Annual Assessment Meeting/Open House Slides ML1032204442010-11-18018 November 2010 Public Meeting Summary - North Anna Power Station ML1021102592010-08-0404 August 2010 Enclosure 3: Dominion - North Anna Presentation of July 28, 2010 Public Meeting ML1020100212010-07-14014 July 2010 Nucler Power Station, Units 1 and 2, Westinghouse RFA-2 Fuel Transition Licensing Meeting Presentation Slides ML1012600332010-05-0505 May 2010 Meeting Posters ML1012600342010-05-0505 May 2010 Public Mtg. Slides ML0917610472009-08-0505 August 2009 ECCS Preacs Filtration Presentation 2024-09-03
[Table view] |
Text
,,.
Bozin, Sunny From: Bowman, Gregory - *"*,-rp Sent: Tuesday, August 30, 2011 11:54 AM To: Hipschman, Thomas; Marshall, Michael; Castleman, Patrick; Sosa, Belkys; Gilles, Nanette; Orders, William; Nieh, Ho; Franovich, Mike
Subject:
FYI - Revised Slides on North Anna/GI-199 Attachments: GI 199.pptx; North Anna Earthquake.pptx Subsequent to my sending the slides on North Anna this morning, the staff decided to make some changes to both presentations. The attached two presentations represent what they'll be using for the briefings. Sorry for the multiple e-mails on this.
Greg From: Bowman, Gregory Sent: Tuesday, August 30, 2011 10:17 AM To: Hipschman, Thomas; Marshall, Michael; Castleman, Patrick; Gilles, Nanette; Orders, William; Franovich, Mike
Subject:
FYI - Slides on North Anna/GI-199 The attached slide presentations will be used for upcoming briefings for individual Commissioners on GI-199 and earthquake impacts at North Anna. I'm passing these along for information only. If you have any questions, please let me know.
-Greg 55
Generic Safety Issue 199 Briefing Presentation to the Commissioners August 30 and September 1, 2011
- 1. Identification
- 2. Acceptance
- 3. Screening
- 4. Safety/Risk Assessment
" Paneled, Report Issued
" Recommendations Endorsed
- 5. Regulatory Assessment
- During reviews of COL, and ESP applications, NRC staff identified increased seismic hazard estimates that may result in a greater likelihood of exceeding the safe shutdown earthquake (SSE) at operating nuclear power plants in the CEUS.
3
1E-3 safe shutdown earthquake SSE= .1:g LL 19 USS 00 W 1E-45 11E-6 EP+S 0.1 Peak Ground Acceleration (g's) 1 4
Safety/Risk Assessment Stage Goals:
" Determine, if risk associated with GI-199 warrants further investigation for potential imposition of cost-justified backfits.
- Provide recommendation for the next step, i.e.
continue to the Reg. Assessment stage for identification of potential, cost-justified backfits, be dropped due to low risk, or have other actions taken outside the GIP.
5
Performed Two Tasks:
- 1. Compared updated seismic hazard estimates (USGS and ESP/COL) to design (SSE) and previous review levels (IPEEE-RLE).
- 2. Evaluated changes in seismic risk metric (SCDF) consistent with MD 6.4.
Performed for all 96 NPPs in CEUS 6
1E-4 7 IE-5 1 .. EPRI baseline AA A 0 C)0 LLNL baseline A A A04A, z 0 A -GIP Critei 1E-6 0.
0- LI1E-7 1E-8 - ---
1 E-7 1E-6. 1E-5 1E-4 1E-3 1E-2 Seismic Core-Damage Frequency (per year) 7
Cost-Justified Backfits That Provide Substantial Safety Enhancements Safety Goal Evaluation Screening Criteria (NUREG/BR-0058)
Distribution of GI-199 -- 1E-3 Safety/Risk OL Assessment Results 1E-4 0 I--
no E 4 0
13_
2Oc6 _ 1E-5 Ci, CD 2E-6 i'- 1E-6 c-C) 1E-1 Conditional Containment Failure Probability 8
m Individual Plant Examination for External Events (IPEEE) provided initial basis for current assessment
- GI-199 Safety/Risk assessment provided the basis to proceed with the GL in accordance with GIP 9
No imminent seismic safety concern
- Current data indicates the probability for ground shaking above the seismic design basis in CEUS has increased
- GI-199 Safety/Risk assessment indicated changes in SCDF estimates for some plants lie in the 10-5 to 10-4 per year; meets risk criteria to continue to regulatory assessment stage of the GIP
- Approach to estimate SCDF in GI-199 extrapolated from IPEEE submittals, but lacked insight which SSC important to seismic risk
- Information needed as basis for considering potential plant backfits commensurate with reduction of seismic risk 10
Requested Response:
" Within 90 days, provide results of action taken to eliminate or reduce plant seismic vulnerabilities (anomalies, outliers & other findings) identified by IPEEE
" Within 180 days, provide seismic hazard curves over a range of spectral frequencies, and site specific GMRS and SSE
- Within 1 year (SMA), provide description of methodology to quantify seismic margin HCLPF capabilities of SSC, detailed list of SSC seismic margin values, bases for screening SSCs, description of the SMA and its logic models,..etc.
- Within 2 years (SPRA), provide significant contributors to SCDF, methodologies to estimate SCDF (e.g. seismic fragilities of SSC, dominant failure modes, location of components), findings from walk-downs 11
North Anna Nuclear Power Plant Seismic Event Presentation to the Commissioners August 30 and September 1, 2011
m North Anna Nuclear Power Plant (NANPP) has two Design Basi,s Earthquake (DBE)* values n Structures, systems, and components (SSCs) founded on top of rock anchored at 0.12-g and SSCs founded on top of soil anchored at 0.18 g m NANPP has two corresponding Operating Basis Earthquake (OBE) values, anchored at 0.06 g for rock and 0.( )9 g for soil (OBE is 1/2 of the DBE)
" On August 23, 2011, North Anna Power Station declared an Alert due to significant seismic activity onsite from an earthquake which had a measured magnitude of 5.8.
" The licensee conducted the 1 st general walkdown of the plant as required by the North Anna Power Station abnormal procedure for seismic event.
" The licensee conducted the 2nd walkdown after the magnitude 4.5 aftershock.
" Seismic Response Spectrum Recorder (scratch plate) readings identified that the Design Basis Earthquake had been exceeded at certain frequencies.
" On August 26, the licensee declared all safety-related SSCs of Units 1 and 2 inoperable and issued a 10 CFR 72 Notification 3
- Exceedance of the DBE is an unprecedented event at an operating unit
- While Perry Unit was under construction, an earthquake occurred that exceeded SSE at high frequency (15hz)
A special safety inspection was conducted by the NRC's Region III Staff on February 5-7, 1986. See Inspection Reports 50-440/86005 and 50-440/86006. This included a post-earthquake walkdown and visual inspection of an extensive list of safety-related systems and components.
4
- Appendix A to Part 100-Paragraph V(a)(2) states, "If vibratory ground motion exceeding that of the Operating Basis Earthquake occurs, shutdown of the nuclearpower plant will be required.
- Priorto resuming operations, the licensee will be required to demonstrate to the Commission that no functional damage occurred to those features necessary for continued operation without undue risk to the health and safety of the public."
- 10 CFR 50.54 (ff) contains similarlanguage for Appendix S plants. (Appendix S applies to Part 52 applicants and operating reactorconstruction permits submitted on or after Jan. 10, 1997)
- Director of NRR will authorize restart 5
2.0 I ý I. 1 .1 NA Unit I.&2 Rock SSE (Newmark at 0.12g)
- - OBE (1/2 SSE) 1.5- NA Unit 3 COL GMRS C,) a USGS (ShakeCast Report Version 7)
EPRI GMPE(2004, 2006) Mw~5.8 at 19kini / V
/
N
/
1.0- /
C-)
1**
/
C-) 0.5-
?/
0.0 !*
I 4-0.1 1 10 100 6 frequency (Hz)
- Licensee's evaluation of seismic instruments indicate that the SSE was exceeded at some frequencies
- Information from NANPP's seismic recordings will be utilized by the staff to assist in the assessment of the licensee's operability determination 7
- AIT was dispatched today, which will be conducted in accordance with MD 8.3, "NRC Incident Investigation Program."
- Objectives of the AIT include:
" Collect, analyze and document factual information and evidence
" Assess licensee s actions and plant equipment response during the earthquake and aftershocks
" Conduct independent extent of condition review
" Collect information to support final determination of risk significance of event
" Identify generic issues associated with the event 8
m The list below provides the plants and the associated distance from the Epicenter:
" North Anna is 18 km from the Epicenter
" Surry is 139 km from the Epicenter
" Calvert Cliffs is 141 km from the Epicenter m NRR will confirm that the OBE was not exceeded at Surry and Calvert Cliffs.
9