Letter Sequence Draft Approval |
---|
|
|
MONTHYEARML12314A0292012-11-13013 November 2012 Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2 Project stage: Draft Approval ML12331A1752012-11-26026 November 2012 Draft Bypass Fiber Quantity Test Plan Project stage: Request ML12331A1782012-11-26026 November 2012 Meeting Slides Re GSI-191 Strainer Fiber Bypass Test Plan Slides for H. B. Robinson Unit 2 Project stage: Request ML12332A1932012-12-13013 December 2012 Summary of Public Meeting with Duke Energy Concerning GL 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plan Re H. B. Robinson Steam Electric Plant, Unit 2 Project stage: Draft Approval 2012-11-26
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24165A2362024-06-21021 June 2024 Duke Robinson Technical Report 5-22-24 Public Meeting Summary ML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML23129A0012023-06-26026 June 2023 May 2, 2023, Summary of Meeting Duke Energy to Discuss an H. B. Robinson Steam Electric Plant, Unit No. 2 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High ML22262A2882022-10-0303 October 2022 Summary of September 14, 2022, Observation Public Meeting with Duke Energy Progress, LLC to Discuss a Planned TSTF-577, Rev. 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 ML22174A2872022-07-14014 July 2022 Summary of Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML22166A0182022-07-0707 July 2022 Summary of June 13, 2022, Closed Meeting with Duke Energy Progress, Llc to Discuss Licensee Responses Provided to a Request for Additional Information Associated with a License Amendment Request to Adopt Technical Specifications Task Force ML22131A3802022-05-12012 May 2022 Public Meeting Summary - 2021 Annual Assessment Meeting Regarding the H. B. Robinson Steam Electric Plant, Docket No. 50-261, Meeting Number 20210460 ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22091A2692022-04-19019 April 2022 Summary of March 30, 2022, Pre-Submittal Meeting with Duke Energy Progress, LLC to Discuss a Potential License Amendment Request Surveillance Requirements 3.8.1.16 for H. B. Robinson Steam Electric Plant, Unit 2 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21182A2202021-07-0909 July 2021 Summary of June 24, 2021, Meeting with Duke Energy Progress, LLC, Regarding a Proposed Amendment Concerning TSTF-577, Revised Frequencies for Steam Generator Frequencies for Steam Generator Tube Inspections, for the H. B. Robinson Steam Ele ML21068A4172021-03-17017 March 2021 Summary of Meeting with Duke Energy Progress, LLC, Regarding a Proposed Relief Request Concerning Containment Inspections of Liners and Moisture Barriers for the H. B. Robinson Steam Electric Plant, Unit 2 ML20141L6282020-05-20020 May 2020 EOC Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19123A1592019-05-0101 May 2019 Summary of Public Meeting with H. B. Robinson Steam Electric Plant, to Provide Opportunities to Discuss the Annual Assessment of the H.B Robison Steam Electric Plant with the Public for Period of January 1, 2018 - December 31, 2018 ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML18144A0632018-05-24024 May 2018 Summary of Meeting Concerning Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 for Period of January 1, 2017 - December 31, 2017 ML17340A1302017-12-22022 December 2017 Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson ML17254A3492017-09-19019 September 2017 Summary of Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request Regarding a Transmission Upgrade at the H. B. Robinson Steam Electric Plant Unit No. 2 ML17223A1212017-08-17017 August 2017 Summary of August 3, 2017, Meeting with Duke Energy Progress, LLC on Proposed License Amendment Request to Implement Fuel Reload Design Methodology Reports for Shearon Harris and H. B. Robinson ML17097A2492017-04-0606 April 2017 Public Meeting Summary, 2016 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML16235A2382016-10-17017 October 2016 Summary of the July 12-13, 2016 Audit Supporting the U.S. Nuclear Regulatory Commission Review of DPC-NE-1008-P, Nuclear Design Methodology Using CASMO-5/SIMULATE-3 for Westinghouse Reactors ML16123A0312016-05-26026 May 2016 Summary of Meeting with Duke Energy Progress, Inc. to Discuss a Proposed License Amendment Requests Regarding a 24 Month Fuel Cycle and an Alternative Source Term for Robinson, Unit No. 2 ML16123A0362016-05-0505 May 2016 Summary of the H.B. Robinson Steam Electric Plant, Unit 2 - February 9-10, 2016 Audit Associated With License Amendment Request to Transition to the National Fire Protection Association 805 Standard (CAC No. MF2746) ML16034A5242016-03-11011 March 2016 Summary of February 1, 2016, Pre-submittal Meeting with Duke Energy Regarding Consolidation of Emergency Operations Facilities ML15343A0712015-12-23023 December 2015 September 22-26, 2014, Summary of H. B. Robinson Steam Electric Plant, Unit 2 - Audit Associated with License Amendment Request to Transition to the National Fire Protection Association 805 Standard ML15280A2532015-11-25025 November 2015 Summary of Mtg. with Duke Energy Progress Inc. to Discuss Fuel Reload Design Methodology Reports & Proposed License Amendment Request Shearon Harris Nuclear Power Plant Unit 1 and H.B. Robinson Steam Electric Plant Unit No. 2 (MF6701/MF6702 ML15288A1312015-11-17017 November 2015 Summary of Meeting with Duke Energy Progress, Inc. to Discuss H. B. Robinson Steam Electric Plant Unit No. 2 - Proposed License Amendment Request Transmission Upgrades ML15281A1982015-11-10010 November 2015 Summary of Meeting with Duke Energy Progress Inc., to Discuss the H. B. Robinson Steam Electric Plant Unit No. 2, License Amendment Request to Adopt National Fire Protection Association Standard 805 ML15117A5812015-05-0606 May 2015 April 14, 2015, Summary of Public Meeting on Calculation of Risk for NFPA-805 Fire Areas Crediting Control Room Abandonment ML15125A4382015-05-0505 May 2015 Public Meeting Summary - 2014 Annual Assessment Public Meeting Regarding H.B. Robinson Steam Electric Plant ML15068A3492015-03-18018 March 2015 Summary of March 4, 2015, Meeting with Duke Energy Progress, Inc., Regarding Pre-Submittal Meeting for 24-Month Fuel Cycle Proposed License Amendment Request ML14210A0502014-07-30030 July 2014 June 30, 2014, Summary of the Category 1 Public Meeting with Duke Energy Progress Inc. to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14154A0932014-06-0303 June 2014 May 28, 2014, Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML14112A4712014-05-0202 May 2014 Conference Call Summary - Regarding the Spring 2014 Steam Generator Inspections During a Forced Outage ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13238A0542013-08-23023 August 2013 Meeting Summary - Category 1 Public Meeting Regulatory Conference, H.B. Robinson Steam Electric Plant, Docket No. 50-261 ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13155A1052013-06-12012 June 2013 May 2, 2013, Summary of Meeting with Duke Energy Concerning the Relocation of the Emergency Operating Facilities ML13150A0742013-05-29029 May 2013 Meeting Summary - Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML13127A0502013-05-20020 May 2013 Summary of April 18, 2013, Meeting with Duke Energy Concerning the National Fire Protection Association (NFPA) 805: Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants ML12332A1932012-12-13013 December 2012 Summary of Public Meeting with Duke Energy Concerning GL 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plan Re H. B. Robinson Steam Electric Plant, Unit 2 ML12107A3552012-04-16016 April 2012 4/11/2012 Summary of Category 1 Public Meeting - Annual Assessment of H.B. Robinson Steam Electric Plant ML1113703382011-05-17017 May 2011 Meeting Summary Letter Regarding Performance Improvement Plan ML11116A0202011-05-12012 May 2011 April 12, 2011, Summary of Pre-Application Meeting with Carolina Power & Light Company and Florida Power Corporation, on Brunswick, Units 1 & 2, Crystal River, Unit 3, and H. B. Robinson, Unit 2 ML1023804682010-08-26026 August 2010 08/18/10 Summary of Meeting NRC Initial Exam Writer'S Workshop ML1015803032010-06-0707 June 2010 Summary of Meeting with Augmented Inspection Team to Discuss the Results of an Augmented Inspection at the H.B. Robinson Team Electric Plant ML1013904872010-05-19019 May 2010 Summary of Category 1 Public Meeting with Carolina Power & Light Company H. B. Robinson Steam Electric Plant Fire Event on March 28, 2010 ML1011703342010-04-27027 April 2010 Summary of Category 1 Public Meeting with Carolina Power and Light Company Regarding NRC Reactor Oversight Process Annual Assessment H.B. Robinson Steam Electric Plant, Unit 2 2024-06-21
[Table view] |
Text
December 13, 2012 LICENSEE: Carolina Power & Light Company FACILITY: H.B. Robinson Steam Electric Plant, Unit 2
SUBJECT:
SUMMARY
OF NOVEMBER 26, 2012, MEETING WITH DUKE ENERGY CONCERNING GENERIC LETTER 2004-02 AND NRC STAFF REVIEW OF DRAFT PROPOSED STRAINER FIBER BYPASS TEST PLAN FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (TAC NO. ME9894)
On November 26, 2012, the Nuclear Regulatory Commission (NRC) staff conducted a Category 1 public meeting via a conference call with Duke Energy, Inc., which is representing Carolina Power & Light Company (the licensee), including its contractors Enercon and Alion, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was for Duke Energy to present its proposed strainer fiber bypass test plan for H. B. Robinson Steam Electric Plant, Unit No. 2 (HBRSEP) regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors. The purpose of the meeting was also for the NRC staff to provide the licensee with questions and comments during the meeting. The meeting notice was publicly available on the NRCs website and is documented in Agencywide Document Access and Management System (ADAMS) Accession No. ML12314A029. The list of participants for this call is provided in the enclosure to the meeting summary.
The licensees draft bypass fiber quantity test plan that was provided to the NRC staff by an electronic mail (e-mail) is documented in ADAMS Accession No. ML12331A175. Prior to the meeting the licensee provided its presentation slides that are documented in ADAMS Accession No. ML12331A178.
The intent of the strainer bypass test is to measure the amount of fibrous debris that bypasses or passes through an emergency core cooling system sump strainer module. The fibrous material used in the testing is representative of debris that could be generated during a loss-of-coolant accident. The results of the testing will be used to quantify the amount of debris that could bypass a plant strainer to assist in evaluation of the response of equipment downstream of the strainer. During the conference call, the licensee presented information regarding the generic safety issue 191 project status, the bypass test configuration, the procedures used for debris preparation, the bypass test approach velocity, and how the potential for pump stop/restart would be accounted for during the testing HBRSEP. The licensee also presented the HBRSEP bypass test procedure acceptance criteria, and bypass test schedule.
This presentation was followed by discussing the NRC staffs questions and the licensees responses. During the conference call, the NRC staff discussed its overall expectation of the test results and asked a few clarification questions. The NRC staff specifically noted its concerns with using deionized water, similar to those discussed during a Crystal River Unit 3 public meeting regarding bypass testing. The staff is concerned that water chemistry used
during testing may affect bypass results and recommends that testing either use prototypical reactor coolant or use of an alternate be addressed by the licensee in its evaluation of the testing.
The licensee clarified during the call that HBRSEP has bypass eliminators installed to reduce the amount of debris that can pass through the strainer. The licensee also indicated that testing would model pump stop/restart timing as it is expected to occur in the plant. The licensee stated that there is some limited amounts of mineral wool type fiber left at the plant, but the amount is very small compared to the amount of Nukon fiber. The NRC staff has seen foreign reactor test results that indicate that mineral wool fiber my bypass the strainer more easily than fiberglass. The NRC staff stated that the licensee should ensure that care is taken during critical test steps to ensure that the test is not adversely affected or biased non-conservatively.
The majority of the call focused on the effect of strainer approach velocity on fiber bypass. The staff is aware that approach velocity affects the amount of fiber that passes through a strainer.
The HBRSEP strainer has a non-uniform approach velocity such that some areas of the strainer have a significantly higher velocity while others have a very low velocity. Because testing is necessarily conducted using a relatively small section of the strainer the velocity gradient is not modeled during the test and a relatively uniform velocity is used.
The licensee proposed that an RMS (root mean square) average could be used to determine an appropriate test velocity. The NRC staff could not conclude that an RMS average was an appropriate methodology for velocity determination. However, the NRC staff stated that the licensee could reference test results for a similar strainer design that show that the bypass follows a relatively linear relationship over the range of velocities that could be experienced by the HBRSEP strainer. The licensee stated that they had adequate information to show a relatively linear relationship and that they would test with 1.5 times the average maximum velocity to ensure margin. The velocity may be reduced to 1 times the design velocity after a debris bed forms over the entire strainer. The licensee stated that the velocity gradient along sections of the strainer is reduced significantly as debris deposits on the strainer.
The licensee indicated that some of the velocity sensitivity testing that will be used to show the linear relationship may have been conducted with debris additions larger than those recommended by the NRC staff for bypass testing. The NRC staff stated that it would accept the use of these tests to show sensitivity to velocity (not absolute bypass amounts) if the debris additions were not unreasonably large.
The following action items for the licensee were taken at the conclusion of this meeting:
- 1) update Table 4.1 of the test plan to show the proper destruction pressures for various types of insulation, 2) describe how debris is added during bypass testing, and 3) provide information regarding the relationship between bypass amount and strainer approach velocity.
The NRC staff expects the test to produce results that are realistic or conservative when compared to actual plant strainer bypass. However, the test results are somewhat dependent on human actions and evaluations of the test results after the testing is complete. Therefore,
while the NRC staff does not have any questions or additional comments regarding the draft strainer fiber bypass test plan for HBRSEP, the NRC staff does not endorse this test plan.
The licensee is planning to finalize its draft strainer bypass test plan and submit it to the NRC in December 2012. Also, the bypass test is currently planned for week of January 28, 2013, at Alions test facility in Warrenville, Illinois. The NRC staff may observe the strainer bypass testing and review its evaluation and application as part of its overall review of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors.
Members of the public were invited and one was on the conference call. Public Meeting Feedback forms were not received.
Please contact me at (301) 415-3302, or by e-mail to Araceli.Billoch@nrc.gov if you have any questions.
Sincerely,
/RA/
Araceli T. Billoch Colón, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-261
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
Package ML12331A170 Notice ML12314A029 Draft Bypass Testing Plan ML12331A175 Slides ML12331A178 Summary ML12332A193 OFFICE LPL2-2/PM LPL2-2/LA SSIB/BC LPL2-2/BC LPL2-2/PM NAME ABillochColón for BClayton SBailey JQuichocho ABillochColón FSaba DATE 11/28/12 11/29/12 12/6/12 12/13/12 12/13/12 LIST OF ATTENDEES U. S. NUCLEAR REGULATORY COMMISSION PUBLIC MEETING WITH DUKE ENERGY REGARDING DRAFT PROPOSED STRAINER FIBER BYPASS TEST PLAN FOR H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 NOVEMBER 26, 2012 U. S. NRC S. Bailey S. Smith F. Saba DUKE ENERGY R. Hightower S. Connelly D. Phillips ENERCON Waqas Abbasi Janet Caldwell Eric Crabtree Kip Walker Gil Zigler ALION Megan Stachowiak PUBLIC J. Bergman, Scientch Enclosure