PS~G Public Service Electric and Gas Company nE~UtAT~nY DOCKET f~lE COPY P.O. Box 168 Hancocks Bridge, New Jersey 08038 Salem Nuclear Generating Station May 10, 1978 2

(/)

  • -*~

Director, Office of Inspection and Enforcement 3l l.l:

U.S. Nuclear Regulatory Commission Washington, D.C. 20555

~~~

(.j*"":.:;:J

i:_~.::-:;

~

Dear Sir:

(5 iTl U)

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of April, 1978 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Summary of Safety Related Maintenance Operating Summary Refueling Information Sincerely yours, H. J. Midura Manager - Salem Generating Station LKM:jcm cc: Mr. Boyce H. Grier Director of U. S. NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pa. 19406 Director, Office of Management Information and Program Control rno:1*f'Jsfrs-;f Nuclear Regulatory Comrniss ion

~d~-Shington, D.C. 20555

.;~

Enc.* .. U:\llSOF smmn; Page l of 13 8-l-7.R4 95-2189 (4M) 3-78

eAVERAGE DAILY UNIT POWER LEVEL DOCKET NO. __ 50-272

..;:.....:;..._:;:...~---

UNIT - Salem No. 1 DATE May 10, 1978 COMPLETED BY L. K. Miller TELEPHONE 609-365-7000. X507 MONTH April, 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWE-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0

  • ,()6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 -*-

16 0

<J. .Pg. 2* 13 8.1-7 .Rl.

e OPERATING DATI\. REPORI' 50-272 r::ccKET NJ.: _ _ _ _ _ _ _ _ __

DATE : May 1.0, 1978 COME'LEl'ED BY: L. K_. Miller TELEPHONE: 609-365-7000 X507 OPERATING STATUS

l. unit Narre: Salem No. 1 Notes:
2. Rei;:orting Period: April, 1978 3338
3. Licensed The.ma.1. Power (MWt):

1135 4.

5.

Narreplate Rating (Gross MWe):

Design Electrical Rating (Net MWe): 1090

6. 1-f..aximum Dependable capacity (Gross~) : _ _ 1_1_2_4_ __
7. MaxiJm:ml De;:e.11dable capacify (Net MWe): 1079
8. If Changes Occur in capacity .Ratings (Ite!l's Nurnl:er 3 Through 7) Since Last Rei;:ort, Give Reason:

None

9. Fewer Level To Which Restricted, If Any (Net !<We) : _N_o_n_e____________________
10. Reasons For Restrictions, If Any:-----------------------------

This M:lnth Year to Date CUmulative

11. Hours In Rer:orting Period 719 2879 7320
12. Numl:er Of Hours Reactor Was critical. 0 1522.7 4065.9
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 0 1460.1 3890.7
15. Unit Feserve Shutdown Hours 0 0 0
16. Gross Thenral Energy Generated (M'm) 0 4,505,479 11,200,699
17. Gross Electrical Energy Generated(MWH) 0 1,548,500 3,734,810
18. Net Electrical. Energy Generated (MWH) (4374)* 1,471,031* 3,529,249*
19. Unit Service Factor 0 50.7 53o2
20. Unit Availability Factor 0 50.7 53.2
21. Unit Capacity Factor (Using MOC Net) 0 47.4 44.7
22. Unit Capacity Factor (Using DER Net) 0 46.9 44.2
23. Unit Forced outage Rate 100 49.3 31.3
24. Shutdowns Scheduled Over Next 6 t-mths (Type, Date, and Duration of Each):

None

25. If Shut r.cwn At End of Rei;:ort Period! Estimated Date of startup: _ _ _J_un_e_l_7.,;..,_1_9_7_8________
26. Units In Test Status (Prior to CCmrercial Operation):

Forecast Achieved rnITIAL CRITICALITY 9/30/76 12/11/76 8-1-7 .R2 ThTI'IAL ELECTRICITY" 11/1/76 12/25/76 PagA* 3 of 13 CtM1EFCIAL OPERATION 12/20/76 6/30/77

  • Values reflect rrodified rrethod of calculating unit net generation.

UNIT SllllTroVNS l\ND IU'IER nEDUC'fIONS DOCKET NO.: 50-272 REPORT MJNTH April / 1978 UNIT :NAME: Salem No .. 1 DATE: May 10, 1978 COMPLETED DY: L. K. Miller TELEPHONE: (609) 365-7000 X507 METHOD OF DURZ\TION 2 SHUITING LICENSE SYSTEM ai1PoNmr CAUSE AND CORRF.CTIVE NO. DATE TYPEl (HOURS) REASON OCMN EVENT cooE4 CODES ACTION '.lD REAC'.lDR REPOR'l' II PREVENr REUJRRENCE 78-40 3-15-78 F 719 B 1 - - - N/A Turbine High vibration, Main Turbine Bearing No. 3., Unit Shut Down to IPake necessary turbine repairs.

1 2 3 4 5 F: Forced Reason: M:!thod: Exhibit G - Instructions Exhibit 1-Sarre S: Scheduled A-El:}uipnent Failure(Explain) 1-Manual for Preparation of Data source B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Autanatic Scram. Event Report (LER) File D-Regulatocy Restriction 4-0ther (Explain) (NUREG-0161)

E--qJerator Training & License Examination F-Administrative 8-l-7.R2 G--qJerational Error(Explain)

H-Other (Explain)

Page 4 of 13

DOCKET NO.: 50-272

,MAJOR PLANT MOD:;I:FICA~NS Salem #1 UNITLE:

REPORT MONTH April, 1978 May 10, 1978 DATE:

COMPLETED BY: L. K. Miller TELEPHONE: 609-365-7000 X507

  • DCR NO. PRINCIPLE SYSTEM. SUBJECT ED-0062 Steam Generator Feed Modify Recirculation Valve (11 & 12 BF32) Controls from Modulating to Open-Close.

ED-0082 Refueling Equipment Install Sheave Guards on RCC Change.Fixture.

ED-0145 Reactor Coolant Install .100" Shims on *14 RCP No. 3 Seal.

ED-0146 Reactor Coolant Modify No. 3 Seal Ring on llRCP ED-0192 Waste Liquid Replace Limit Switches on 11 & 12 LW9 with improved type ED-0204 EH Install new Panel 745 for *-

Turbine Instruments.

ED-0226 Main Steam Modify MSCDT Piping Hangers to reduce vibration.

ED-0302 Auxiliary Feed Replace *AFP Recirc Orifices with Redesigned Type.

ED-0352 Reactor Cavity Remove Seal Plate and Hold

- Down Clamps.

OD-0024 Waste Gas Replace 11 & 12 NT98 and Piping to increase flow.

  • DESIGN CHANGE REQUEST Page 5 of 13 8-1-7 .Rl _

DOCKET NO. : 50-272 t'!AJOR PLANT MOD~FICA~NS UNI~AME: Salem #1 REPORT MONTH April, 1978 DATE: May :'10, 1978 COMPLETED BY: __ L_._K__ ._Mi_._l_l_e_r~-----

TELEPHONE: ___ 60_9_-_3_6_5-_7_0_0_0_X_5_0_7___

  • DCR NO. 1 OCFRS 0. 5 9_ SAFETY EVALUATION OD-0024 Safety related equipment will not be affected.

ED-0062 Safety related equipment will not be affected.

ED-0082 This design change does not effect any presently performed safety analyses nor does it create any new hazards. Therefore, the criteria of an unreviewed safety question is not satisfied.

ED-0145 No change to seal design or safety analyses is proposed.

Criteria for an unreviewed safety question are not met.

ED-0146 There is no fundamental change to seal design or function.

Criteria for an unreviewed safety question are not met.

ED-0192 Safety related equipment will not be affected.

ED-0204 This change does not effect the safety function of structure.

An unreviewed safety question is not involved.

ED-0226 Safety related equipment will not be affected.

ED-0302 This design change does not alter the function of the recirc. orifices.

The criteria of an unreviewed safety question is not satisfied.

ED-0352 An unreviewed safety question*is not involved in rerroving the existing seal ring.

  • DESIGN CHANGE REQUEST Page 6 ot 13

50-272

. e

SUMMARY

OF SAFETY RELATED MAINTENANCE DOCKE~.:

UNIT E: Salem Unit #1 DATE: May 10, 1978 DEPARTMENT PERFORMANCE COMPLETED BY: L. K. Miller REPORT MONTH ~ril! 1978 TELEPHONE: 609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.

OD-8555 Valve llMSlO Does not operate in Auto. Repaired loose socket on relay K2 and replaced relay K4.

OD-8599 Valve 15SW58 No open indication. Adjusted limit switch.

OD-8607 RMS lRlOB Detector failure. Replaced detector.

OD-8608 RMS 1Rl3C&E Check setpoints. Adjusted setpoints.

PD-4634 Fuel Handling Incomplete sequence upon Freed damper.

Bldg. Sup Fan. starting.

OD-8290 Cont. Press Pl003A reads high. Recalibrated.

channels.

OD-8155 #11 Sbn. Gen.Level Does not agree with Recalibrated.

CH III. redundant channels.

PD-4680 Module 1BS518C Module out of spec. Replaced power supply to lLC051.

/

PD-4688 ~ 1R9 Check calibration. Replaced ~ter.

OD-8696 Valve 1MS132 Position indication linkage hligned linkage and stem.

misaligned.

Page 7 of 13

50-272 I

. . e

SUMMARY

OF SAFETY RELATED MAINTENANCE DOCKE~.:

UNIT E: Salem Unit #1 May 10, 1978 DATE:

DEPARTMENT MAINTENANCE REPORT MONTH April, 1978 COMPLETED BY: L. K. Miller

/

. TELEPHONE: 609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.

OD-8251 Boric Acid Disc ruptured. Replaced rupture disc.

Evaporator.

OD-8697 Valve 1CV141 Repair oody/bonnet leak. Replaced gasket.

OD-8634 #2 Fire Pump Oil leak. Put tef lon tape on upper and lower plugs. i, OD-8319 Valves 11RH17 and Packing leak. Repacked valves.

12RH17. I I

MD-2445A Valve 11SJ23. Packing leak. Repacked valve and repaired flange.

OD-8652 1 Errerg. Air Stuck breaker . Tack welded defective gear to

.~ressor Breaker. shaft which allows breaker to be racked in and out.

OD-8653 4 KV feed to Linkage problem. Straightened linkage.

lC 460-230V.

MD-2644 15 Service Water Strainer leak. Welded strainers.

Strainer.

MD-2425 Valve 11SJ54 Bent operator. Repaired threads on yoke bushing.

OD-6858 16 Service Water High Bearing Temp. Replaced upper bearings and Pump. brazed pin hole leaks in cooler.

Page 8 of 13

  • . e

SUMMARY

OF SAFE!I'Y RELATED MAINTENANCE DOCKE~.:

UNIT E:

50-272 Salem Unit #1 DATE: May 10, 1978 DEPARTMENT MAINTENANCE

-- COMPLETED BY: L. K. Miller REPORT MONTH April, 1978 TELEPHONE: 609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.

OD-8530 12 Chiller. Noisy and trips on low oil Replaced corrpressor.

pressure.

OD-8488 Valve 1CV57 Defective handwheel. Replaced -.handwheel.

OD-8669 12 Service Water Shear key broken. Replaced shear key, 4 shoes, Strainer. and thrust bearing.

OD-8670 13 Service Water Alarms on High Diff. Press. Calibrated PD287.

Strainer.

OD-8654 Valve 12CV155 Diaphragm leaks. Replaced diaphragm.

OD-8588 #1 Ernerg. Air ~il leak on head. Replaced gaskets.

Corrpressor.

OD-8321 Valves 11 & 12 KTalve flange leaks. Installed new gaskets.

SJ 37 and 38.

OD-8639 Valve 1CV166 Blockage. Rerroved bonnet and flushed.

~',

/

OD-7570 Valves 12CV 318 Packing leak. Repacked.valves and replaced and 319. cap.

MD-2563 Valve 1PS9 Packing leak. Repacked valve.

.MD-2534 15 Service Water Strainer running contin- Disassembled and cleaned Strainer. µously. strainer.

I OD-5844 Valve 1SJ908 Drain valve and line Cleared valve and line.

plusrged.

Page 9 of 13

DOCKEL: 50-272 UNIT  : Salem Unit #1 SUMIVlARY OF SAFETY RELATE,MAINTENANCE

.MAINTENANCE DATE: May 10, 1978 DEPARTMENT April, 1978 COMPLETED BY: L. K. Miller REPORT MONTH

, TELEPHONE: 609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.

OD-8673 Valve 11CV156 Bonnet leak. Replaced diaphragm.

OD-6854 Loop II R'ID Loop Flange leak. Replaced -flange gasket. . *-. -

return orifice.

OD-8640 Valve 1CV175 Pi~e blockage. Cleared line, repacked check valve.

OD-4713 Valve 14WG33 Flange leak. Replaced flange gasket.

OD-8687 11 Service Water* Strainer fails to work on Replaced :m:Jtor leads.

Strainer. auto with 30 PSI !:iP.

OD-8635 11 Service Water Strainer fails to run with Installed new packing and Strainer. 20 PSI !:iP~ gasket.

OD-8048 Valve 1CV89 Valve does not close Removed handwheel and re-properly. adjusted valve.

MD-2445 Valve llSJ23 Packing and flange leak. Repack and replaced flange gasket.

OD-8701 11, 12 and 13 Alarms with only 3 !:i PSI. Reseated alann card.

Service Water Strainer.

MD-2385 Valve 13MS168 Bonnet leak. Installed new gasket and packing.

Page 10 of 13

oocKETLNo.: ______ so_-_2_1_2__________- - i

SUMMARY

OF SAFE;TY *RELATE.MAINTENANCE UNI T . E : Salem Unit #1


~~

DATE: _____Ma:__y_l_0_,__1_97_8_________

DEPARTMENT MAINTENANCE 1 COMPLETED BY: L. K. Miller REPORT MONTH April, 1978 ----------------------~

TELEPHONE: 609-365-7000 X507


~

WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.

MD-2567 Valve 11RC22 Packing leak. _ Repacked valves.

OD-6717 Valves 11 and Packing *leak. Repacked valves.

12SW122.

MD-2562* Valves 1CV139 and Pac~ing leak. Repacked valves.

140.

/

i Page 11 of 13

MONTHLY OPERATING

SUMMARY

SALEM I APRIL, 1978 4/1-30 The unit was out the entire month due to the continuation of outage for the purpose of making turbine repairs.

Estimated date of startup is June 17, 1978.

Page 12 of 13 L

REFUELING IN~O~TION DOCKET NO.: 50-272

~~~~~~~~

UNIT: SALEM NO. l DATE: May 10 1978 I n COMPLETED BY: .L *. ~.*--Miller TELEPHONE: 609-365-7000 EXT. 507 April, 1978

1. Refueling information has changed from last month:

YES X NO

2. Scheduled date of next refueling: April 1, 1979
3. Scheduled date for restart following refueling: May 29, 1979
4. A. Will Technical. Specification changes or other license amendments be required? YES NO NOT DETERMINED TO-DATE April, 1978 B. Has the reload fuel design been reviewed by the Station Operating.

Review Cammi ttee? YES NO X JANUARY, 1979 If no, when is i t scheduled?

5. Scheduled date(s) for submitting proposed licensing action:

February, 1979 if required.

6. Important licensing considerations associated with refueling:

NONE

7. Nuinber or Fuel Assemblies:

A. In-Core 193 B. In Spent Fuel Storage 0

8. *Present licensed spent fuel storage capacity: 264 Future spent fuel storage capacity: 1,170
9. Date of last refueling that can be discharged to the sp~nt fuel pool assuming the present licensed capacity: April, 1982 Page 13 of 13