ML19260A924

From kanterella
Revision as of 21:41, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to NRC 790925 Ltr Re Violations Noted in IE Insp Rept 50-020/79-02.Corrective Actions:Changes Will Be Presented to Committee by 791130 & Senior Review Board Will Conduct Overall Review
ML19260A924
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 10/15/1979
From: Lisa Clark
MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19260A915 List:
References
NUDOCS 7912060146
Download: ML19260A924 (2)


Text

4 .

jw

>}3 Cy NUCLEAR REACTOR LABORATORY MASSACHUSETTS ?NCTITUTE OF TECHNOLOGY k C* - HAALING 138 Albany Street Cambridge. Mass. 02139 L :LA % JA

> +ctc' (6171253- 4202 B "' c ' " c ' ' O c " "' ~

Oct.ober 15, 1979 Mr. Boyce H. Grier Director, Region #1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Penn. 19406

Subject:

Inspection 50-20/79-02, License No. R-37

Dear Mr. Grier:

Massachusetts Institute of Technology submits the following response to your letter dated September 25, 1979, received October 1, 1979, forwarding Inspection Report 50-20/79-02 and listing three items of non-compliance.

The following actions have been taken in regard to the three items:

A) Corrective actions for Item A of the Notice of Violation were described in MIT's letter of September 27, 1979, to USNRC Region #1.

B) It is correct, as stated in Item B of the Notice, that the Requalification Program for Licensed Personnel, as approved by NRC on May 18, 1978, was not approved by the MIT Reactor Safeguards Committee. The changes made in the program were inadvertently overlooked when the agenda for the following MITRSC meeting was prepared and, consequently, approval by the Committee was not secured. Information concerning the proposed changes, however, was sent to MITRSC in a memo dated November 15, 1977, subject " Proposed Revision to Requalification Program".

Corrective action will consist of presenting the changes .. the Program to the Committee at its next meeting, currently being planned for late October or early November. Full compliance will be achieved at that time or, if the Committee should require further changes, as soon as possible thereafter but no later than November 30, 1979.

C) In connection with Item C, it is conceded that the Senior Review Board for the Requalification Program has not annually reviewed the examinations and evaluations for the purpose of assessing the overall program. In our view, this differs somewhat from the statement in the Notice of Violation 1510 159 7 912 0 6 0 $

Mr. Boyce H. Grier October 15, 1979 Inspection 50-20/79-02 that "the Senior Review Board has not been conducting annual reviews of writtan examination results". All members of the Board have, in fact, being reviewing all annual written examinations for the purpose of evaluating the need for retraining.

In compliance with the intent of the citation, the Senior Review Board has conducted an overall review of the Program and has no changes in the Program itself to recommend at this time. It believes that more timely implementation of the Program, in such areas as retraining, is required. Steps to accomplish this have consisted of establishing a time-table as part of Procedure 1.16 which will serve as a guideline for scheduling various requalification activities to assure that they are accomplished in a timely manner. Hence, we believe that we are now in full compliance in this regard.

In connection with Section 10 of tha Inspection Report, paragraph b implies a commitment on the part of MIT to provide for further analysis of a fuel element found to have faulty cladding by arranging to transfer it to a testing laboratory having appropriate facilities. MIT has agreed to in-vestigate the feasibility of having such an analysis made, but the performance of such testing will have to await the results of the feasibility study.

Should you desire further information in connection with any of the above matters, we shall be pleased to provide it.

Sincerely, d i LC/pk Lincoln Clark, Jr.