ML20198N073
| ML20198N073 | |
| Person / Time | |
|---|---|
| Site: | MIT Nuclear Research Reactor |
| Issue date: | 01/09/1998 |
| From: | Weiss S NRC (Affiliation Not Assigned) |
| To: | Bernard J MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE |
| Shared Package | |
| ML20198N078 | List: |
| References | |
| 50-020-97-202, 50-20-97-202, NUDOCS 9801200246 | |
| Download: ML20198N073 (2) | |
See also: IR 05000020/1997202
Text
-
~
_ _ - - -
_-
,
w
January 9, 1998
i
Dr. John A. Bernard, Jr.
Director of Reactor Operations
Massachusetts institute of Technology
Research Reactor
MITNRL-NW12
138 Albany Street
Cambridge, Massachusetts 02139
SUBJECT: NRC II'SPECTION NO. 50-20/97202
Duar Dr. Bernard:
On November 21,1997, the NRC completed an inspection of reactor operations at the MIT
research resctor. The enclosed report represent' the results of that inspection.
No noncompliance or significant issues were identified. No response to this letter is
required.
Your cooperation with us is appreciated.
Sincerely,
ORIGINAL SIGNED BY:
Seymour H. Weiss, Director
Non Power Reactors and Decommissioning
Project Directorate
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Docket No. 50-20
License No. R-37
Endosure: NRC Inspection Report No. 50-20/97202
cc w'/ enclosure:
km
ht h hk
Dr. William Vernetson, TRTR
Commonwealth of Massachusetts
HARD CCPY
. vf enclocure
E Mall
DISTRIBUTION:
l
! Docket F1650 20
TDregoun
CBassett
AAdams
- PUBLIC
SWeiss
TBurdick
TMichaels
[f
PDND r/f
W. - Dean, OEDO
SHolmes
PDoyle
~JRoe
Nuclear Safety information Ctr.
MMendonca ~Plsaac
-
EHylton
WEresian
PDND:PS p
PDN
PDND:D
TDragoun
J
E$n
SWeiss
}N-
-
/
/ /98
[/& /98
f g/98
'
/
OFFICIAL RECORD COPY
,-
DOCUMENT NAME: G:\\SECY\\DRAGOUN\\MIT97.202
9801200246 900109
ADOCK 05000020
0
~ae4
"1.11.111.1B.11111!m..D1.L
.
'
a
.
sk" 44
,y
- a
UNITED STATES
l
j
NUCLEAR REGULATORY COMMISSION
t
WASHINGTON D.C. 20666 0001
\\,...../
January 9, 1998
Dr. John A. Bernard, Jr.
Direct')r of Reactor Operations
Mask
- setts Institute of Technology
Research Reactor
MITNRL-NW12
138 Albany Street
Cambridge, Massachusetts 02139
SUBJECT: NRC INSPECTION NO. 50-20/97202
Dear Dr. Bernaid:
On November 21,1997, the NRC completed an inspection of reactor operations at the MIT
research reactor. The enclosed report represents the results of that inspection.
No noncompliance or significant issues were identified. No response to this letter is
required.
Your cooperation with us is appreciated.
Sincerely,
/
.W
-
.
,
!eyn.6ur H. Weiss, Director
S
Non-Power Reactors and Decommissioning
Project Directorate
Division of Reactor Program Management
Office of Nuclear Reactor Regulation
Docket No. 50-20
License No. R-37
Enclosure: NRC Inspection Report No. 50-20/97202
cc w/ enclosure:
Dr. William Vernetson, TRTR
Commonwe::lth of Massachusetts
--x.---
- - - _ - --.m---
- - - - - - - - - - - - - - - - - - - - - - - - . - - - - - - - . - _ _ _ _ _ _ - - - - - - - - _ - - , - - - - _ _ - - _ - - - - - - - - - _ _ _ _
, - - - _ _ - - - - - _
- - - , - - - - -
m-
.
.
,.
-
.
.
-
- .
- .
. ,
'
,
>
n.
Messachusetts Institute of -
Docket No. 50-20
Technology
~
~
cc:
City Manager
- City Hall '
Cambridge, Massachusstu 02139
,
Assistant Secretary for Policy
Executive Office of Energy Resources
100 Cambridge Street, Room 1500
Boston, Massachusetts 02202
Department of Environmental
. Quality Engineering
100 Cambridge Street
Boston, Massachusetts 02108
,
a
2
9
7<
'
,
.4
Wy
e
m
--