NUCLEAR REACTOR LABORATORY
(
AN INTERDEPARTMENTAL CENTER OF
'4NT#
(AASSACHUSETTS INSTITUTE OF TECHNOLOGY l
O K. HARUNG 138 A'Dany Street Cambruge. Mass 02139 1.. CLAR K. JR, Director (617)253-4 202 Diretor of Reactor Operatons i
September 6, 1988 1
l U.S. Nuclear Regulatory Commission l
Document Control Desk Washington, D.C. 20555 j
Gentlemen:
I
[
Subj e ct: NRC Region I Inspection Report No. 50-20/88-02 As noted in NRC Region I Inspection Report No. 50-20/88-02, no reply to that report was required.
Accordingly, this letter is sub-mitted as an item of information.
Under Section 6 (Experiments) of the aforesaid report, a concern was raised that a proposed experiment
[
be prototype tested to a pressure of at least 970 psi.
Please be advised that the proposed experituent has now been ptototype tested to l
a pressure of 1000 psi.
Also, certain changes have now been made to the proposed experiment which significantly reduce the necessary i
hydrostatic test pressures.
These are described in a safety evalua-(
tion report that is being forwarded under separate cover.
Sincerely, kN IW John A. Bernard, Ph.D Director of Reactor Operations Nuclear Reactor Laboratory l
JAB /crh j
I cci USNRC - Region I l
I Chief, Reactor Projects Section IB USNRC - Region I l
L.T. Deerflein, Project Inspection, Section IB j