ML20069G963
| ML20069G963 | |
| Person / Time | |
|---|---|
| Site: | MIT Nuclear Research Reactor |
| Issue date: | 10/13/1982 |
| From: | Lisa Clark MASSACHUSETTS INSTITUTE OF TECHNOLOGY, CAMBRIDGE |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8210190334 | |
| Download: ML20069G963 (1) | |
Text
8 k
gluc > -
l ' g/
1.
1 NUCLEAR REACTOR LABORATORY r
AN INTERDEPARTMENTAL CENTER OF MASSACHUSETTS INSTITUTE OF TECHNOLOGY O.K. HARUNG 138 Albany Street Cambridge, Mass. 02139 L CLARK, JR.
Director (617)2514202 Director of Reactor Operations October 13, 1982 Mr. Robert L. Tedesco, Assistant Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
SAR Revision No. 27, Physical Security Plan, MIT Research Reactor, Docket No. 50-20, License No. R-37
Dear Mr. Tedesco:
Massachusetts Institute of Technology submits herewith six copies of Revision No. 27 to the " Safety Analysis Report for the MIT Research Reactor (MITR-II)", Report No. MITNE-115 (October 22, 1970), as amended.
The revision affects the " Physical Security Plan for the MIT Research Reactor Facility", Appendix 13B to the above SAR,and contains Safeguards Information requiring protection pursuant to the requirements of 10 CFR 73.21.
Please contact the writer if further information is desired in connection with the enclosed Physical Security Plan revisions.
Sincerely, L M Ow/*
Lincoln Clark, Jr.
Director of Reactor Operations LC/sbs
Enclosure:
SAR Revision No. 27 cc: MITRSC (w/o enclosure) gg(LOS@E(OhOU 3gtc%RDS\\"gggG
- 5#4 Ih t~'B210190334 821013 i PDR ADOCK 05000020 I
F PDR