ML19273B417

From kanterella
Revision as of 18:58, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Final Deficiency Rept,Ncr 1011,re Sys Accumulator Flow at Low Reactor Coolant Sys Levels
ML19273B417
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/09/1979
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19273B418 List:
References
NUDOCS 7904060328
Download: ML19273B417 (1)


Text

- - - .

"( 7__ e *; 4 4 >, '

. %f - O h irr%

TENNESSEE VALLEY AUTHORITY CH ArTANOOG A. TENNESSEE 37401 500C Chestnut Street Tower II MM J 1979 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Dear Mr. O'Reilly:

SEQUOYJJi NUCLEAR PLANT UNITS 1 AND 2 - REDUCED SIS ACCUMULATOR P.0W AT LOW REACTOR COOLANT SYSTEM LEVELS - NCR 1011 - FINAL REPORT The subject deficiency was initially reported to NRC-01E Inspector J. K. Rausch on September 18, 1978. Interim reports were submitted on October 17, 1978, and December 19, 1978. Er. closed is our final repert.

If you have any questions concerning this matter, please. get in touch

. with M. R. Wisenburg at FTS 854-2581.

Very truly yours,

, { hL -

. J. E. Gilleland Assistant Manager of Power Enclosure cc: Mr. John G. Davis, Acting Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission ~* " --

Washington, DC 20555 b 9 anssom ss 790406C @ E N T ^' '

7[. O!. r . .

An Equal Ococr'u n.'v E mmov <