ML19289D194
ML19289D194 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 01/31/1979 |
From: | Poirier M SPIEGEL & MCDIARMID |
To: | Danny John AKIN, GUMP, STRAUSS, HAUER & FELD (FORMERLY AKIN |
Shared Package | |
ML19289D196 | List: |
References | |
NUDOCS 7902230203 | |
Download: ML19289D194 (1) | |
Similar Documents at South Texas | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999
[Table view]Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09 Category:EXTERNAL CORRESPONDENCE MONTHYEARML20087G5791992-05-0808 May 1992
[Table view]Provides Matl Re Complaint Against Stated Utils & Nuclear Support Svc,Inc & Addresses Issues in Detail.Respondents Actions Prevent Complainant Career in Nuclear Industry. Related Info,Including DOL Correspondence Encl.Info Deleted ML20246C6031989-06-28028 June 1989 Notifies of Potential Significant Deficiency That May Be Reportable Under 10CFR21 Re Atmospheric Dump Valves,Per ML20245K0651989-05-18018 May 1989 FOIA Request for Records Re DOL Complaint Filed by Jl Stites Against Util on 880802 ML20196B5361988-11-23023 November 1988 Forwards Prompt Notification Sys Test Rept Using FEMA Region VI Reporting Form for Apr-Oct 1988 ML20235Y9581987-03-18018 March 1987 Offers Svcs of J Geiger to Assist Recipient in Resolving Allegations Re Facility ML20235Y8701987-03-0505 March 1987 Summarizes Discussions Re Investigation & Disposition of Concerns on Facility.Author Would Assure That Safeteam Provided Response Ltr Which Included More Detailed Description of Investigation Process ML20210B2281987-01-26026 January 1987 Requests That Info Re Complaints Concerning Safety Issues at Plant Be Provided to Util or at Least Nrc.Gap Plans to Investigate Complaints Discussed in Encl 870120 & 01221 Articles.Served on 870205 ML20197B9391986-05-0606 May 1986 Requests Removal of Name from Mailing List for 50.55(e) & Other Technical Documents & Correspondence.Receipt of All Pleadings Per Stated Administrative Proceeding Requested. W/Certificate of Svc.Related Correspondence ML20115G4461985-04-17017 April 1985 Responds to 850409 Allegations Re FOIA Request to Selective Svc Sys.Nothing Illegal,Unethical or Unprofessional About FOIA Inquiry.Info Will Not Be Used to Harm Recipient. Related Correspondence ML20113A8361985-04-0909 April 1985 Requests Public Apology from Util & Util Counsel for J Yenouskas 841120 & s to Selective Svc Sys Requesting Info on La Sinkin W/O Identifying Affiliation. Certificate of Svc Encl.Related Correspondence ML20102C1861985-02-25025 February 1985 Advises That L Sinkin Atty for Citizens Concerned About Nuclear Power,Not Client,Per Request for Personal Records from Selective Svc Sys.Distinction Between Client & Counsel Unclear.Certificate of Svc Encl ML20106D0571985-02-0707 February 1985 Considers Characterization of Request for L Sinkin Personal Records from Selective Svc Sys as Routine Background Check Into Qualifications Fanciful.Certificate of Svc Encl.Related Correspondence ML20101S8401985-02-0101 February 1985 Responds to & Confirms Author Request for Publicly Available Records of Selective Svc Sys.No Investigation by Author or Util Undertaken.Related Correspondence ML20101R4241985-01-29029 January 1985 Confirms 850128 & 29 Telcons Re Request for Extension of Time to File Response to NRC 841221 Affidavit.Response Time Extended to 850225 & 0311 for Responsive Pleadings. Certificate of Svc Encl ML20101D0481984-12-17017 December 1984 Forwards 841130 & 1210 Ltrs to Aslab Inadvertently Sent to Incorrect Address.List of All Matls Filed by Firm Between 840413 & 1130 W/Aslb & Aslab Provided to Ensure Receipt. Certificate of Svc Encl.Related Correspondence ML20197D8901983-09-30030 September 1983 FOIA Request for Records Re South Texas Project (STP) in Connection W/Houston Lighting & Power Co Ownership of STP & Brown & Root,Inc,In Connection W/Design & Const of STP ML20024F2971983-09-0707 September 1983 Confirms Recent Conversations Agreeing to Jh Goldberg 830927 Deposition in Friendwood,Tx.Certificate of Svc Encl ML20076F7361983-08-22022 August 1983 Forwards Notice of J Goldberg Deposition.Related Correspondence ML20009B6101981-07-0202 July 1981 Advises That 801007 Part 21 Rept Re Reportable Defect Was Unfounded.Nrc Determined Rept Closed.Requests Ack of Ltr ML19339C3091980-11-0606 November 1980 Responds to Intervenor 801030 Request for Documents.Util Correspondence W/Nrc Re Const Deficiencies Available in Lpdr in San Antonio,Tx.Certificate of Svc Encl ML19339A8311980-10-30030 October 1980 Requests Const Deficiency Repts Missing from Files.Related Correspondence ML19339A8351980-10-29029 October 1980 Requests Name of Company Hired for Testing Backfill for Stability & Relationship to Util,Brown & Root or Any Other Facility Affiliates ML19338F8271980-10-21021 October 1980 Responds to 801015 Ltr Re Release of Potential Exhibits for Which Util Has Claimed Confidential Treatment.Objects to Release of Matl Per ASLB 790724 Stipulation to Protective Order.Lists Documents Which Can Be Released W/O Restriction ML19332A2651980-09-0808 September 1980 Confirms Conversation Re Objection & Intent Not to Respond to Util 800825 Interrogatories & Document Requests.Factual Discovery Closed Since 800314.Interrogatories Are ill-timed as Efforts Have Been Made to Encourage Settlement ML19344E5711980-08-28028 August 1980 Requests That Info Be Provided to All Parties Re Wheeling Rate Development Per 800826 Discussions.Discusses Principles to Be Considered Re Smaller Util Participation in Facility Ownership ML19330B9671980-08-0101 August 1980 Notifies That Resumption of Deposition Indefinitely Postponed & Will Be Rescheduled.Svc List Encl ML19320D4571980-07-10010 July 1980 Reviews 800702 Draft Transmission Svc Settlement Agreement. Document Found to Be Unacceptable Due to Provisions Making Austin Jurisdictional as Practical Matter for Wheeling. Postage Stamp Wheeling Rate Is Not Proper in Tx ML19320C2581980-07-0808 July 1980 Identifies Documents to Be Produced within 30 Days Per P Buchorn Deposition Testimony Re Application for Ol.Related Correspondence ML19330B1331980-07-0707 July 1980 Requests Confirmation That Meeting Notes,Members Names, Documents & Records,Position Papers,Taped Conversations, Consent of interviewees,by-laws & Notes Will Be Provided as Agreed in Deposition.Related Correspondence ML19330B1361980-07-0202 July 1980 Discusses 800618 Deposition & Request for Documents.Requests Reasons for Document Request within 14 Days & Change in Date of Deposition to Last Wk in Jul in San Antonio,Tx.Related Correspondence ML19320A7521980-06-10010 June 1980 Ack Receipt of 800530 Ltr to Tx Parks & Wildlife Dept Advising That Tx Utils Generating Co Is Not Prepared to Enter Into Lease Agreement W/Dept Covering Squaw Creek Reservoir.Requests Info Re Util Intentions ML19320A7781980-06-10010 June 1980 Confirms Understandings Re Withdrawals of Brown & Root Brochure on Implementation of QA Program at Job Site & Associated Videotape.Copies Will Be Available as Evidence in Order to Show Cause & Pending OL Application ML19316B1241980-06-0202 June 1980 Discusses Possible Solutions to Matter Raised by P Buchorn at 800529 Meeting Concerning Application for Ol.Suggests That P Buchorn Submit List of Specific Documents for Examination or Duplication ML19316B0601980-05-20020 May 1980 Confirms Final Arrangements for P Buchorn,L Sinkin & D Swayze Depositions.P Buchorn & L Sinkin Depositions Scheduled 800617 & 18,respectively,in San Antonio,Tx & D Swayze Deposition Scheduled 800619 in Bay City,Tx ML19324A0431980-05-0808 May 1980 Ack 800506 Telcon Re Agreement for P Buchorn 800617 Deposition in San Antonio,Tx.Sinkin Deposition Will Be Taken on 800618 & Swayze on 800619-21 ML19310A0591980-05-0707 May 1980 Advises That Public Utils Board of City of Brownsville,Tx Does Not Agree W/Dm Stahl Version of Facts Re Bruggeman Deposition.Labeling Matter as Misunderstanding Considered as Polite Understatement ML19323H2481980-05-0505 May 1980 Confirms & Notifies Parties of L Sinkin 800618 Deposition. Rescheduling Necessitated by Involvement in Other Hearing. Suggests 800617 for Buchorn Deposition.Related Correspondence ML19316B2061980-04-28028 April 1980 Confirms & Notifies of Agreement for DE Swayze 800619-21 Deposition,Subj to ASLB Granting of Motion for Discovery Extension.Place Will Be Determined at Later Time ML19323F9141980-04-21021 April 1980 Provides Notice & Confirmation of 800417 Telcon,Re QA Procedure 2.6 Extension of Discovery Period & Swayze & Sinkin Depositions.Recipient Deposition Will Be Taken on 800515 ML19316A9631980-04-18018 April 1980 Discusses DE Swayze Contemplated Oral Deposition Which Cannot Be Put Off Later than 800622.Inquires Whether Recipient Will Be Available During Wk of 800609 or 16. Subpoena Will Be Issued If Cooperation Is Not Forthcoming ML19305E5711980-04-16016 April 1980 Forwards Correspondence Between DOJ & Doe,Re WE Scott Availability as Doi Expert Witness,For Redeposition ML19316A9791980-04-16016 April 1980 Ack Receipt of 800409 Ltr & Advises That Submitting Questions in Advance Is Not Practical.Deposition Will Focus on Allegations of QA & QC Failures.Work Product Will Be Discussed Prior to 800514 ML19344D6001980-04-0404 April 1980 Advises of Arrangement to Deliver Houston Lighting & Power Pleadings Moving to Compel Documents Re E Mcginnes & P Wetzel Subpoenas.Consents to 14-day Extension for Responses. Certificate of Svc Encl ML19309C0051980-03-13013 March 1980 Forwards DOJ Third Supplemental Response to Houston Lighting & Power Co First Set of Interrogatories.Documents Responsive to Util 790204 Second Set of Interrogatories Encl.Documents Re Second Interrogatories Not Encl ML19309C9811980-03-13013 March 1980 Ack Receipt of & Accepts 800312 Ltr in Lieu of Interrogatory Answer Per 800307 Prehearing Ruling.Ltr Does Not Solve Houston Lighting & Power Problems Re C Stover Deposition.Doj 800311 & 12 Ltrs & Certificate of Svc Encl ML19309D1531980-03-11011 March 1980 Forwards DOJ Subpoena Requiring DE Simmons,Util Vice President,To Testify 800331-0402.Confirms That Simmons Will Be Available for Deposition on 800404-05 Instead of Dates Listed in Subpoena.W/O Encl ML19309D7231980-03-10010 March 1980 Notifies That W Scott Deposition Scheduled for Mar Is Cancelled.Cancellation Based on DOJ Representation That Scott Would Be Called as Expert Withness ML19305C8251980-03-10010 March 1980 Forwards Notice of Taking of Deposition of D Springs ML19309D2881980-03-0606 March 1980 Notifies That DOJ Received Houston Lighting & Power Co Supplemental Answers to Central Power & Light Co First Interrogatories W/O Apps.Requests Attachment a to Houston Power & Light Co Second Set of Addl Answers to NRC ML19305D0401980-03-0404 March 1980 Confirms 800229 Telcon Re DOJ Subpoena of Documents from Gulf States Utils.Subpoena Covers Certain Areas Also Covered in Brownsville Public Utils Subpoena.Util Documents Will Be Available to All Parties 1992-05-08 Category:EXTERNAL LETTERS ROUTED TO NRC MONTHYEARML20246C6031989-06-28028 June 1989
[Table view]Notifies of Potential Significant Deficiency That May Be Reportable Under 10CFR21 Re Atmospheric Dump Valves,Per ML20245K0651989-05-18018 May 1989 FOIA Request for Records Re DOL Complaint Filed by Jl Stites Against Util on 880802 ML20196B5361988-11-23023 November 1988 Forwards Prompt Notification Sys Test Rept Using FEMA Region VI Reporting Form for Apr-Oct 1988 ML20235Y9581987-03-18018 March 1987 Offers Svcs of J Geiger to Assist Recipient in Resolving Allegations Re Facility ML20235Y8701987-03-0505 March 1987 Summarizes Discussions Re Investigation & Disposition of Concerns on Facility.Author Would Assure That Safeteam Provided Response Ltr Which Included More Detailed Description of Investigation Process ML20210B2281987-01-26026 January 1987 Requests That Info Re Complaints Concerning Safety Issues at Plant Be Provided to Util or at Least Nrc.Gap Plans to Investigate Complaints Discussed in Encl 870120 & 01221 Articles.Served on 870205 ML20197B9391986-05-0606 May 1986 Requests Removal of Name from Mailing List for 50.55(e) & Other Technical Documents & Correspondence.Receipt of All Pleadings Per Stated Administrative Proceeding Requested. W/Certificate of Svc.Related Correspondence ML20115G4461985-04-17017 April 1985 Responds to 850409 Allegations Re FOIA Request to Selective Svc Sys.Nothing Illegal,Unethical or Unprofessional About FOIA Inquiry.Info Will Not Be Used to Harm Recipient. Related Correspondence ML20113A8361985-04-0909 April 1985 Requests Public Apology from Util & Util Counsel for J Yenouskas 841120 & s to Selective Svc Sys Requesting Info on La Sinkin W/O Identifying Affiliation. Certificate of Svc Encl.Related Correspondence ML20102C1861985-02-25025 February 1985 Advises That L Sinkin Atty for Citizens Concerned About Nuclear Power,Not Client,Per Request for Personal Records from Selective Svc Sys.Distinction Between Client & Counsel Unclear.Certificate of Svc Encl ML20106D0571985-02-0707 February 1985 Considers Characterization of Request for L Sinkin Personal Records from Selective Svc Sys as Routine Background Check Into Qualifications Fanciful.Certificate of Svc Encl.Related Correspondence ML20101S8401985-02-0101 February 1985 Responds to & Confirms Author Request for Publicly Available Records of Selective Svc Sys.No Investigation by Author or Util Undertaken.Related Correspondence ML20101R4241985-01-29029 January 1985 Confirms 850128 & 29 Telcons Re Request for Extension of Time to File Response to NRC 841221 Affidavit.Response Time Extended to 850225 & 0311 for Responsive Pleadings. Certificate of Svc Encl ML20101D0481984-12-17017 December 1984 Forwards 841130 & 1210 Ltrs to Aslab Inadvertently Sent to Incorrect Address.List of All Matls Filed by Firm Between 840413 & 1130 W/Aslb & Aslab Provided to Ensure Receipt. Certificate of Svc Encl.Related Correspondence ML20197D8901983-09-30030 September 1983 FOIA Request for Records Re South Texas Project (STP) in Connection W/Houston Lighting & Power Co Ownership of STP & Brown & Root,Inc,In Connection W/Design & Const of STP ML20024F2971983-09-0707 September 1983 Confirms Recent Conversations Agreeing to Jh Goldberg 830927 Deposition in Friendwood,Tx.Certificate of Svc Encl ML20076F7361983-08-22022 August 1983 Forwards Notice of J Goldberg Deposition.Related Correspondence ML20009B6101981-07-0202 July 1981 Advises That 801007 Part 21 Rept Re Reportable Defect Was Unfounded.Nrc Determined Rept Closed.Requests Ack of Ltr ML19339C3091980-11-0606 November 1980 Responds to Intervenor 801030 Request for Documents.Util Correspondence W/Nrc Re Const Deficiencies Available in Lpdr in San Antonio,Tx.Certificate of Svc Encl ML19339A8311980-10-30030 October 1980 Requests Const Deficiency Repts Missing from Files.Related Correspondence ML19339A8351980-10-29029 October 1980 Requests Name of Company Hired for Testing Backfill for Stability & Relationship to Util,Brown & Root or Any Other Facility Affiliates ML19338F8271980-10-21021 October 1980 Responds to 801015 Ltr Re Release of Potential Exhibits for Which Util Has Claimed Confidential Treatment.Objects to Release of Matl Per ASLB 790724 Stipulation to Protective Order.Lists Documents Which Can Be Released W/O Restriction ML19332A2651980-09-0808 September 1980 Confirms Conversation Re Objection & Intent Not to Respond to Util 800825 Interrogatories & Document Requests.Factual Discovery Closed Since 800314.Interrogatories Are ill-timed as Efforts Have Been Made to Encourage Settlement ML19344E5711980-08-28028 August 1980 Requests That Info Be Provided to All Parties Re Wheeling Rate Development Per 800826 Discussions.Discusses Principles to Be Considered Re Smaller Util Participation in Facility Ownership ML19330B9671980-08-0101 August 1980 Notifies That Resumption of Deposition Indefinitely Postponed & Will Be Rescheduled.Svc List Encl ML19320D4571980-07-10010 July 1980 Reviews 800702 Draft Transmission Svc Settlement Agreement. Document Found to Be Unacceptable Due to Provisions Making Austin Jurisdictional as Practical Matter for Wheeling. Postage Stamp Wheeling Rate Is Not Proper in Tx ML19320C2581980-07-0808 July 1980 Identifies Documents to Be Produced within 30 Days Per P Buchorn Deposition Testimony Re Application for Ol.Related Correspondence ML19330B1331980-07-0707 July 1980 Requests Confirmation That Meeting Notes,Members Names, Documents & Records,Position Papers,Taped Conversations, Consent of interviewees,by-laws & Notes Will Be Provided as Agreed in Deposition.Related Correspondence ML19330B1361980-07-0202 July 1980 Discusses 800618 Deposition & Request for Documents.Requests Reasons for Document Request within 14 Days & Change in Date of Deposition to Last Wk in Jul in San Antonio,Tx.Related Correspondence ML19320A7521980-06-10010 June 1980 Ack Receipt of 800530 Ltr to Tx Parks & Wildlife Dept Advising That Tx Utils Generating Co Is Not Prepared to Enter Into Lease Agreement W/Dept Covering Squaw Creek Reservoir.Requests Info Re Util Intentions ML19320A7781980-06-10010 June 1980 Confirms Understandings Re Withdrawals of Brown & Root Brochure on Implementation of QA Program at Job Site & Associated Videotape.Copies Will Be Available as Evidence in Order to Show Cause & Pending OL Application ML19316B1241980-06-0202 June 1980 Discusses Possible Solutions to Matter Raised by P Buchorn at 800529 Meeting Concerning Application for Ol.Suggests That P Buchorn Submit List of Specific Documents for Examination or Duplication ML19316B0601980-05-20020 May 1980 Confirms Final Arrangements for P Buchorn,L Sinkin & D Swayze Depositions.P Buchorn & L Sinkin Depositions Scheduled 800617 & 18,respectively,in San Antonio,Tx & D Swayze Deposition Scheduled 800619 in Bay City,Tx ML19324A0431980-05-0808 May 1980 Ack 800506 Telcon Re Agreement for P Buchorn 800617 Deposition in San Antonio,Tx.Sinkin Deposition Will Be Taken on 800618 & Swayze on 800619-21 ML19310A0591980-05-0707 May 1980 Advises That Public Utils Board of City of Brownsville,Tx Does Not Agree W/Dm Stahl Version of Facts Re Bruggeman Deposition.Labeling Matter as Misunderstanding Considered as Polite Understatement ML19323H2481980-05-0505 May 1980 Confirms & Notifies Parties of L Sinkin 800618 Deposition. Rescheduling Necessitated by Involvement in Other Hearing. Suggests 800617 for Buchorn Deposition.Related Correspondence ML19316B2061980-04-28028 April 1980 Confirms & Notifies of Agreement for DE Swayze 800619-21 Deposition,Subj to ASLB Granting of Motion for Discovery Extension.Place Will Be Determined at Later Time ML19323F9141980-04-21021 April 1980 Provides Notice & Confirmation of 800417 Telcon,Re QA Procedure 2.6 Extension of Discovery Period & Swayze & Sinkin Depositions.Recipient Deposition Will Be Taken on 800515 ML19316A9631980-04-18018 April 1980 Discusses DE Swayze Contemplated Oral Deposition Which Cannot Be Put Off Later than 800622.Inquires Whether Recipient Will Be Available During Wk of 800609 or 16. Subpoena Will Be Issued If Cooperation Is Not Forthcoming ML19316A9791980-04-16016 April 1980 Ack Receipt of 800409 Ltr & Advises That Submitting Questions in Advance Is Not Practical.Deposition Will Focus on Allegations of QA & QC Failures.Work Product Will Be Discussed Prior to 800514 ML19305E5711980-04-16016 April 1980 Forwards Correspondence Between DOJ & Doe,Re WE Scott Availability as Doi Expert Witness,For Redeposition ML19344D6001980-04-0404 April 1980 Advises of Arrangement to Deliver Houston Lighting & Power Pleadings Moving to Compel Documents Re E Mcginnes & P Wetzel Subpoenas.Consents to 14-day Extension for Responses. Certificate of Svc Encl ML19309C0051980-03-13013 March 1980 Forwards DOJ Third Supplemental Response to Houston Lighting & Power Co First Set of Interrogatories.Documents Responsive to Util 790204 Second Set of Interrogatories Encl.Documents Re Second Interrogatories Not Encl ML19309C9811980-03-13013 March 1980 Ack Receipt of & Accepts 800312 Ltr in Lieu of Interrogatory Answer Per 800307 Prehearing Ruling.Ltr Does Not Solve Houston Lighting & Power Problems Re C Stover Deposition.Doj 800311 & 12 Ltrs & Certificate of Svc Encl ML19309D1531980-03-11011 March 1980 Forwards DOJ Subpoena Requiring DE Simmons,Util Vice President,To Testify 800331-0402.Confirms That Simmons Will Be Available for Deposition on 800404-05 Instead of Dates Listed in Subpoena.W/O Encl ML19305C8251980-03-10010 March 1980 Forwards Notice of Taking of Deposition of D Springs ML19309D7231980-03-10010 March 1980 Notifies That W Scott Deposition Scheduled for Mar Is Cancelled.Cancellation Based on DOJ Representation That Scott Would Be Called as Expert Withness ML19309D2881980-03-0606 March 1980 Notifies That DOJ Received Houston Lighting & Power Co Supplemental Answers to Central Power & Light Co First Interrogatories W/O Apps.Requests Attachment a to Houston Power & Light Co Second Set of Addl Answers to NRC ML19305D0401980-03-0404 March 1980 Confirms 800229 Telcon Re DOJ Subpoena of Documents from Gulf States Utils.Subpoena Covers Certain Areas Also Covered in Brownsville Public Utils Subpoena.Util Documents Will Be Available to All Parties ML19312D6951980-03-0303 March 1980 Advises of Documents' Availability for Insp & Copying,Per DOJ Request at a Gerber Deposition.Documents Consist of Houston Lighting & Power Transmittal & Houston Exihibits. Certificate of Svc Encl 1989-06-28 |
Text
.. .
ex
/
97 LAW OFFICES gd" v* 4-SI'IEGEL & McDIAlotto .
- ~
2600 VIRGINIA AVENUE. N.W. A WASHINGTON. O C. 20037 TELEPHONE '202) 333 4300 Y ROBE RT C. MCDIARMIO TELECOPIER (202) 333 2974 SANDRA J. STREBEL ROBERT MARLEY BEAR ROBERT A JABLON THOM AS C. TR AUGER s uES N wCRwoCo JOHN MICHAEL ADRAGNA ALAN J ROTH h7tC PUBLIC DOCINENT a t a c'""^ 5 "" o a^
(MASSACMUSETTS S AR QNLYl FRANCES E. FRANCIS DANIE L 1. D AWIDSON G ARY J. NEWELL iscuAS N uCsuG s. JR. MAR /: R PolRIER OANIEL J. GUTTM AN January 31, 1979 PETE R M. M ATT DAVID R STRAUS Douglas F. John, Esquire Akin, Gump, Hauer & Feld 1100 Madison Office Building 1155 15th Street, N.W.
Washington, D.C. 20005 Re: Houston Lighting & Power Co., et al.
(South Texas Units No. 1 & No. 2)
NRC Docket Nos. 50-498A, 50-499A
Dear Mr. John:
Enclosed is a copy of the Initial Interrogatories to and First Request for Production of Documents by South Texas Electric Cooperative and Medina Electric Cooperative from the Public Utilities Board of the City of Brownsville, Texas, in Houston Lighting & Power Co., et al., (South Texas Units No. 1& No. 2), NRC Docket Nos. 50-498A, 50-499A.
You will also find enclosed copies of interroga-tories and document requests by the Public Utilities Board of the City of Brownsville, Texas to other parties in the South Texas proceeding.
In drafting these requests we have tried to take account of the production that has already occurred in this and related cases, so as to avoid duplicative requests.
Should you feel that a particular request covers the same ground as one to which STEC/MEC has previously responded, please telephone me to discuss the problem. I would also be glad to answer any other questions you may have about any part of this request.
Very truly yours, f/ 41C Marc R. Poirier Attorney for the Public Utilities Board of the City of Brownsville, Texas Enclosures cc: All parties n pu Cn 20i"Br .
7 9 0 2 2 3 0 40$$ Q