Interim Deficiency Rept Providing Status of Corrective Action Re Broken Anchor Bolts in Unit 1 Reactor Vessel Support Flange.Next Rept Will Be Submitted by 800801. Teledyne Revised Repts TR-3887-1 & TR-3887-2 Encl
ML19323D351
Person / Time
Site: Midland
Issue date: 05/16/1980
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML19323D353 List:
References
NUDOCS 8005210470
Download: ML19323D351 (2)


Text

f O

A 'w If( /

). P0sMr consamcm James W Cook y ,/ C0mp;ny na r,c,uc.a. .uuu.a n ,ca General Of f eces: 1945 West ParnaH Hoad. Jackson, Michinun 49201 .(517) 788 0640 May 16, 1980 Mr J G Keppler, Regional Director Office of Inspection and Enforcement US Uuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 50137 MIDLAND PROJECT -

UIIIT NO 1, DOCKET NO 50-329 UNIT NO 2, DOCKET NO 50-330 U?!IT UG 1, REACTOR VESSEL EROKEN AUCHOR BOLT f FILE: 0.4.9 35 UFl: 73*10*01, 02111(S) 2311k(E) SERIAL: 8971

References:

S H Howell letters to J G Keppler; Midland Nuclear Plant; j Unit No 1, Docket no 50-329; Unit No 2, Docket Uo 50-330; Unit no 1 Reactor Vessel Broken Anchor Bolt,;

1) Howe-311-79; dated December lk, 1979
2) Howe-267-79; dated October 12, 1979
3) Hove-51-80; dated IIarch 3,1980 h) Howe-80-80; dated April 30, 1980 This letter, as were the referenced letters, is an interim 50.55(e) report concerning broken anclior bolts in the Unit 1 reactor vessel support skirt flange. The enclosures to this letter are two Teledyne Engineering Services (TES) reports fer your review. Enclosure 1 is a revision of a report previoualy transmitted by Reference 3. The revision was made to a) correct typographical errors and b) to further clari fy the actual locations of hardness testing done by TES. Ene]osure 2 is an original submittal.

Revision 1 is submitted because Revision 0 of this document did not address Teledyne's evcluation of the third stud failure.

At the rcquent of the Office of Huclear Reactor Regulation, the distributicn of reports on this subject to Mr Stello is being increased by 23 copies to 38 copies.

Another report , either interim or final, will be sent on or before August 1, 1980.

h;g) . -

WRB/JLW/lr -

/

/

8005210 gg

c o

2

Enclosures:

(1) Tcledyne Engineering Services Report #TR-3887-1, Revision 1,

" Investigation of Preservice Failure of Midland RPV Anchor Studs" (2) Teledyne Engineerinc Services Report #TR-3887-2, Revision 1,

" Acceptability for Service of Midland RPV Anchor Studs" CC: Director, Office of Inspection & Enforcement Att: Mr Victor Stello, USURC (38)

Director, Office of Management Information & Program Control, USNRC (1)

(