ML20005B327 | |
Person / Time | |
---|---|
Site: | Diablo Canyon, San Onofre |
Issue date: | 05/04/1981 |
From: | Machada J AFFILIATION NOT ASSIGNED |
To: | Hendrie J NRC COMMISSION (OCM) |
References | |
FRN-46FR17216, FRN-46FR20215, RULE-PR-2 46FR17216-692, 46FR20215-92, NUDOCS 8107070198 | |
Download: ML20005B327 (1) | |
Similar Documents at Diablo Canyon, San Onofre | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P7111999-10-26026 October 1999
[Table view]Informs That Licensee 990330 Response to GL 97-06 Provides Reasonable Assurance That Condition of Licensee Steam Generator Internals Is in Compliance with Current Licensing Bases for Plant ML20217K3571999-10-21021 October 1999 Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217J8631999-10-15015 October 1999 Forwards Insp Repts 50-361/99-12 & 50-362/99-12 on 990808- 0918.One Violation Identified Involving Inoperability of Emergency Diesel Generator in Excess of Allowed Outage Time ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20217B5981999-10-0606 October 1999 Informs That Staff Concluded That All Requested Info for GL 98-01, Year 2000 Readiness in Us Nuclear Power Plants, Provided for San Onofre Nuclear Generating Station,Units 2 & 3 ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20216J2631999-09-28028 September 1999 Forwards Copy of Final Accident Sequence Precursor (ASP) Analysis of Operational Event at Songs,Unit 2,reported in LER 361/98-003 ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212D9921999-09-16016 September 1999 Informs That on 990818,NRC Staff Completed Midcycle PPR of San Onofre.Nrc Plan to Conduct Core Insps & One Safety Issues Evaluation of MOVs at Facility Over Next 7 Months. Details of Insp Plan Through March 2000 Encl ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 ML20217B9011999-09-10010 September 1999 Responds to Which Addressed Concerns Re Y2K Issue & Stockpiling of Potassium Iodide (Ki) Tablets by Informing That San Onofre Nuclear Station Already Completed All Work Required to Be Ready for Y2K Transition ML20211N0261999-09-0303 September 1999 Forwards Exemption from Certain Requirements of 10CFR50.44 & 10CFR50,app A,General Design Criterion 41 in Response to Util Request of 980910,as Supplemented 990719 & SER ML20211K4191999-09-0303 September 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Withheld in Part (Ref FOIA Exemptions 5 & 7) 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20211H3321999-08-30030 August 1999 Discusses 1999 Emergency Preparedness Exercise Extent of Play & Objectives.Based on Review,Nrc Has Determined That Exercise Extent of Play & Objectives Are Appropriate to Meet Emergency Plan Requirements ML20211J7151999-08-27027 August 1999 Forwards Insp Repts 50-361/99-09 & 50-362/99-09 on 990627- 0807.Two Violations Being Treated as non-cited Violations ML20211J5821999-08-23023 August 1999 Corrected Copy of ,Changing Application Date from 970625 to 990625.Ltr Forwarded SE Accepting Licensee 990625 Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section XI as Listed ML20211H8561999-08-23023 August 1999 Forwards SE Accepting Licensee 970625 Requests for Relief RR-E-2-03 - RR-E-2-04 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N9721999-08-10010 August 1999 Responds to Appeal of FOIA Request for Documents Re Osre Issue.No Osre Visit Scheduled for Sept 1996 at Plant,Per 990722 Telcon.V Dricks,In Ofc of Public Affairs Should Be Contacted Re Osre Issue ML20210N0901999-08-0909 August 1999 Informs That 990312 Application Requested Amends to Licenses DPR-13,NPF-10 & NPF-15,respectively,being Treated as Withdrawn.Proposed Change Would Have Modified Facility TSs Pertaining to SONGS Physical Security Plan ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20210B9891999-07-20020 July 1999 Ack Receipt of Transmitting Plant Emergency Plan Implementing Procedure SO123-VIII-1, Recognition & Classification of Emergencies ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp ML20209D8051999-07-12012 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rc Structural Integrity, Issue on 950519 to Plant. NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20209F5681999-07-0909 July 1999 Forwards Insp Repts 50-361/99-08 & 50-362/99-08 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy 1999-09-03 Category:INCOMING CORRESPONDENCE MONTHYEARML20217K3571999-10-21021 October 1999
[Table view]Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette ML20217K8541999-10-21021 October 1999 Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 ML20217L9491999-10-21021 October 1999 Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 ML20217E3221999-10-13013 October 1999 Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 ML20217E7671999-10-12012 October 1999 Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20216H8741999-09-29029 September 1999 Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements ML20216H8541999-09-29029 September 1999 Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 ML20212H4461999-09-28028 September 1999 Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20212G5611999-09-24024 September 1999 Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO 05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments1999-09-23023 September 1999 Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments ML20212A4061999-09-14014 September 1999 Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 ML20216E6031999-09-10010 September 1999 Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 31999-08-31031 August 1999 Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 ML20210V4271999-08-16016 August 1999 Forwards Proprietary Certified Renewal Applications for SROs a Harkness,R Grabo & T Vogt & RO D Carter,Submitted on Facsimile Form NRC-398 & Certified NRC Form 396.Encls Withheld ML20210R6681999-08-13013 August 1999 Forwards Response to NRC RAI Re SCE License Amend Applications 173 & 159 for Songs,Units 2 & 3,proposed Change Number 485,which Requests Addition of SR to TS 3.3.9, CR Isolation Signal ML20210Q6451999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for SONGS, Units 2 & 3,per TS 5.7.1.4.There Were No Challenges to Pressurizer Safety Valves for Either Units ML20210P4681999-08-11011 August 1999 Forwards COLR for Cycle 10 for Songs,Units 2 & 3,IAW TS Section 5.7.1.5.d, Colr. Changes to COLR Parameters Have Been Conducted IAW Approved COLR Methodologies & All Applicable Limits of Safety Analysis Were Met ML20210P5711999-08-11011 August 1999 Forwards Amend Application Number 189 for License NPF-10 & Amend Application Number 174 to License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Encl Calculation E4C-098 ML20210P6221999-08-10010 August 1999 Forwards Replacement Pages for Attachments E & F of Amend Application Numbers 168 & 154 for Songs,Units 2 & 3.Pages Are Provided to Correct Errors to Pagination & Headings in 970618 Submittal ML20210N5051999-08-0909 August 1999 Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e) 05000361/LER-1999-004, Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl1999-08-0606 August 1999 Forwards LER 99-004-00 Re Automatic Tgis Actuation.Event Affected Units 2 & 3 Equally Because Tgis Is Shared Sys. Single Rept Is Being Provided for Unit 2 IAW NUREG-1022, Rev 1.No New Commitments Are Contained in Encl ML20210L2311999-08-0505 August 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements,For Songs,Unit 3.Rept Covers 970916 Through 990509,date Unit 3 Returned to Service Following Cycle 10 Refueling Outage ML20216D9671999-07-29029 July 1999 Provides Response to RAI to Support Proposed TS Change 460 Re Containment Isolation Valve Completion Time for SONGS, Units 2 & 3.Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak, Encl ML20210C1821999-07-22022 July 1999 Forwards Rept Providing Results of Insp of Eggcrate Tube Supports Done on Secondary Side of Sgs,Using Remote Controlled Visual Equipment ML20210B2451999-07-21021 July 1999 Forwards Response to NRC 990615 RAI Re GL 95-07, Pressure Locking & Thermal Bldg of SR Power-Operated Gate Valves, for Songs,Units 2 & 3 ML20210N2881999-07-19019 July 1999 Forwards Rev 61 to Physical Security Plan,Rev 21 to Safeguards Contingency Plan & Rev 20 to Security Force Training & Qualification Plan,Per 10CFR50.54(p),for Plant. Screening Criteria Forms Encl.Plans Withheld ML20210A2911999-07-19019 July 1999 Submits Withdrawal Request Submitted by Ltr Dtd 990312, Requesting NRC Approval of Revs to Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan ML20209J5241999-07-19019 July 1999 Provides Clarification of Util Intentions Re Disposition of Systems for Which Exemption & TS Changes Were Requested in Licensee .Deferment of Action Re Hydrogen Monitors,Encl ML20209G3421999-07-15015 July 1999 Forwards Table of 16 Affected Tube Locations in SG E089, Discovered During Cycle 10 Outage Insp,Which Were Probably Not Examined by Bobbin During Cycle Outage Insp ML20209C1571999-07-0202 July 1999 Forwards Response to NRC RAI Re SCE Submittal Dtd 980710,re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20210N9871999-07-0101 July 1999 Appeals Denial of Documents Re Sept 1996 Osre for San Onofre Nuclear Generating Station.Requests Copies of Sept 1996 Osre Rept & Any More Recent Osre Repts ML20209B3571999-06-28028 June 1999 Submits Response to GL 98-01,Suppl 1 Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701. Disclosure Encl ML20209B4831999-06-25025 June 1999 Requests NRC Approval of Six Relief Requests from ASME Code Requirement for Containment ISI Exams.Six Relief Requests, Provided as Enclosures 1-6,are as Listed ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20196A9801999-06-17017 June 1999 Responds to NRC 990420 RAI Re Proposed risk-informed Inservice Testing & GL 96-05 Programs at Songs,Units 2 & 3. Revised Pages to risk-informed Inservice Testing Program, Encl ML20195G8091999-06-14014 June 1999 Forwards Response to RAI Made During 990511 Telcon Re LARs 184 & 170 for SONGS Units 2 & 3.Amend Applications Proposed Restriction on Operation with Channel of RAS or Efas in Tripped Condition ML20195K4201999-06-11011 June 1999 Forwards LERs 99-003-00 & 99-004-00 Re Manual Esfas (Reactor Trips) Due to Problems with Main Feedwater Control.Two Events Are Being Reported Separately Because Actual Causes Are Considered Different & Independent of Each Other ML20195H1561999-06-10010 June 1999 Forwards MORs for May 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 & 3 ML20195E4981999-06-0808 June 1999 Forwards Application for Amends 188 & 173 to Licenses NPF-10 & NPF-15 for SONGS Units 2 & 3,respectively.Amends Would Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 Re Small Break LOCA Charging Flow & Main Steam Safety Valve Setpoints ML20196L3191999-05-24024 May 1999 Forwards ISI Summary Rept,Including Owners Repts of Repairs & Replacements for Songs,Unit 2.Rept Covers Period of 970916-990226 ML20207A3831999-05-24024 May 1999 Responds to NRC 990326 RAI on DG Srs.Proposed to Add Listed Sentence to TS Bases for SRs 3.8.1.7,3.8.1.12 & 3.8.1.15,as Result of Discussion with NRC During 990427 Telcon ML20211K4261999-05-18018 May 1999 FOIA Request for Documents Re San Onofre OI Repts 4-98-041, 4-98-043 & 4-98-045 ML20206S7161999-05-17017 May 1999 Forwards MORs for Apr 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 or 3 ML20206M7791999-05-13013 May 1999 Informs NRC of Changes Being Made to Emergency Response Data Sys (ERDS) at SONGS Unit 3.Revised Page to ERDS Data Point Library Is Provided in Encl ML20206N4711999-05-13013 May 1999 Provides Info Requested by NRC Re Reduced Pressurizer Water Vol Change Amends Application 172 & 158 for Songs,Units 2 & 3,respectively.Proposed Change Will Reduce Pressurizer Water Level Required for Operability ML20206K6891999-05-11011 May 1999 Forwards Approved Amends to NPDES Permits CA0108073,Order 94-49 & CA0108181,Order 94-50 & State Water Resources Board Resolution ML20206M0681999-05-10010 May 1999 Submits Correction to Info Contained in Licensee to NRC Re Proposed TS Change Number NPF-10/15-475.Stated Info Was Incorrect in That Overtime Provisions Were Not Contained in TR at Time of Was Submitted ML20206H0451999-05-0404 May 1999 Forwards Annual Financial Repts for Listed Licensees of Songs,Units 1,2 & 3.Each Rept Includes Appropriate Certified Financial Statement Required by 10CFR50.71(b) ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML20206C5151999-04-29029 April 1999 Forwards 1998 Radiological Environ Operating Rept for Songs,Units 1,2 & 3. Annual Radiological Environ Operating Rept Covers Operation of Songs,Units 1,2 & 3 During CY98 & Includes Summaries Interpretations & Analysis of Trends 1999-09-29 Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC MONTHYEARML20056A6211990-07-0606 July 1990
[Table view]Forwards Preexam & post-exam Security Agreement ML20206F0991988-09-27027 September 1988 FOIA Request for Documents Re Drug Use & Distribution, Alcohol Use or Fitness for Duty Issues at Util ML20236U6921987-11-20020 November 1987 Telex from San Luis Obispo California Mothers for Peace Re Facilities ML20236C1201987-10-20020 October 1987 Forwards Request for Stay Filed by Sierra Club in Proceeding Re NRC Issuance of Amends 8 & 6 to Licenses DPR-80 & DPR-82,respectively.Requests Commission Act on Request by 871026 ML20235K7941987-10-0202 October 1987 Informs of Change of Address for Receiving All Matls Related to Facility.New Address Listed.Served on 871002 ML20235F2561987-09-24024 September 1987 Forwards Request for Stay & Notice of Appeal of Licensing Board 870911 Initial Decision,Authorizing License Amends & 870902 Order of Board Denying Sierra Club Motion to Admit Contention & Request for Preparation of Eis.W/O Encl ML20238B7731987-08-0707 August 1987 FOIA Request for Records Explaining Status of Listed LERs Omitted from List,Previously Received from Nrc,Of LERs Filed by Commercial Nuclear Power Plant Licensees for Operating Year 1986 ML20237G9911987-07-28028 July 1987 Comments Supporting Onsite Storage & Reracking Until Federal Repository for Storage of All Spent Fuel Built.Support of Util & Facility Operations Discussed ML20245C9351987-07-0909 July 1987 FOIA Request for Documents & All Records Generated in Connection W/All NRC Insps or Investigations on Allegations Raised by L Penzes from 1983 to Present Re San Onofre Seismic Design ML20236K7881987-07-0202 July 1987 Appeals Denial of FOIA Request for Interview Tapes Re SER of Operation of Plant ML20235G8501987-06-15015 June 1987 Appeals Denial of FOIA Request for Documents Re Plant Listed in App E.W/O App ML20215B1431987-02-25025 February 1987 FOIA Request for Listed Documents Re Mgt of Facility QA & QC Personnel ML20213A3971986-11-30030 November 1986 Summarizes ACRS Subcommittee on Extreme External Phenomena 861120 Meeting Re Facility long-term Seismic Program.Studies Necessary & Conducted in Excellent Manner ML20214P8771986-09-16016 September 1986 Submits Addl Corrections to 860822 Preliminary Conference Transcript.Requests That Response Remain Open Until 860919 in Order That Items Be Accurately Researched & Corrected. W/Certificate of Svc ML20212L1781986-08-18018 August 1986 Forwards Rept on Efforts to Resolve Sierra Club Contention (I)(A) ML20236C4021986-06-30030 June 1986 FOIA Request for Documents Re NRC Investigation Into Alleged Drug Activity at Plant ML20207H7661986-06-25025 June 1986 Supports San Luis Obispo Mothers for Peace & Sierra Club Request for Stay of Issuance of Amends 8 & 6 to Licenses DPR-80 & DPR-82,respectively.Problems Associated W/No Significant Hazards Determination Noted ML20214T6541986-05-28028 May 1986 Appeals Denial of FOIA Request for Ofc of Inspector & Auditor Rept & Related Documents Re Allegations That NRC Responded Improperly to Allegations of Whistleblowers at Plant.Response Requested within 20 Working Days ML20214T7651986-03-0404 March 1986 FOIA Request for Documents Re Ofc of Inspector & Auditor Investigation & Audit of Charges That NRC Improperly Responded to Allegations of Whistleblowers at Plant ML20210G9101986-01-27027 January 1986 Undated FOIA Request for Transcript of Closed Commission 811119 Meeting to Discuss Suspension of Diablo Canyon Unit 1 Low Power OL ML20141N3161986-01-14014 January 1986 FOIA Request for R Jackson to R Vollmer Re Diablo Canyon Hearing Reopening & San Onofre Review Status ML20138Q8561985-11-20020 November 1985 FOIA Request for Documents Re Ofc of Inspector & Auditor Investigation Into Charges That NRC Responded Improperly to Allegations by Whistleblowers at Facility ML20133G9571985-08-20020 August 1985 FOIA Request for Documents Re Ofc of Inspector & Auditor Charges That NRC Responded Improperly to Allegations of Possible QA & Safety Violations by Whistleblowers at Plant ML20198M9631985-06-17017 June 1985 Forwards Allegations of Safety Violations of Nuclear Regulatory Law or Westinghouse QA Requirements.Investigation Requested.Related Info Encl ML20133Q2471985-06-13013 June 1985 FOIA Request for Documents Re Performance Appraisal Team Insp Conducted at Facility Starting Wk of 850301 & Info on Fire Protection Deficiencies ML20133H5871985-05-0808 May 1985 FOIA Request for Documents Re Plant,Including All Contacts Between DOE Task Force on Commercial Nuclear Power,White House Cabinet Council Working Group & NRC Concerning OL ML20128Q6531985-05-0808 May 1985 FOIA Request for Three Categories of Documents Re Facilities ML20128P8031985-04-0808 April 1985 FOIA Request for Access to or Records Re Potential Environ Impact Associated W/Fuel Loading &/Or Low Power Testing at Diablo Canyon & AEOD Sept 1980 Rept on Browns Ferry Interim Equipment to Detect Water in Discharge ML20126J0361985-03-26026 March 1985 Ack Receipt of 850325 Telegram Re Followup Interview of Clients for Pending Allegations.Finalization of Interview Schedules Requested.Second Witness Name Should Be Deleted If Telegram Publicly Available ML20111B8171985-03-0606 March 1985 Requests That Commissioners Appoint ASLB Member to Review, Investigate & Issue Findings on NRC Mgt of Ee Kent Allegations.Evidence Suggests Investigation Deliberately Narrowed in Scope ML20126G8451985-02-21021 February 1985 FOIA Request for Documents Re 1982 Order Requiring 0.67g Seismic Design Std & 1984 Order Allowing Restart,Including Applications for Amends to Const Permit,Ol,Psar & FSAR & Facility Seismic Design Deficiency Repts ML20127F1741985-02-0101 February 1985 FOIA Request for All Records & Info Re Vendor Insp Branch 840229 Rept 99900840/83-01 at Cardinal Industrial Products Corp That Mention Diablo Canyon ML20126G7531984-11-28028 November 1984 FOIA Request for Documents Re Restart Prior to 100% Completion of Seismic Upgrades ML20107K7771984-11-28028 November 1984 Appeals Denial of FOIA Request for All Transcripts from Commission June,Jul & Aug 1984 Meetings Re Issuance of Full Power License for Facility ML20136J3341984-11-20020 November 1984 Submits View Re Possible Restart of Facility Prior to Completion of Seismic Design Improvements Required by NRC 820811 Order ML20215L7951984-11-15015 November 1984 Forwards Amended Mcdermott & O'Neill Petition Re Plant,Per 10CFR2.206.Exhibits 7-18,consisting of Affidavits from 12 Witnesses,Being Filed W/Nrc to Avoid Compromising Ongoing Ofc of Investigations Investigation.W/O Encl ML20133Q2971984-11-0505 November 1984 Appeals Denial of FOIA Request for Transcripts of Commission Meetings Held During June,Jul & Aug 1984 Re Effects of Earthquakes at facility,SECY-84-70 & SECY-84-291 & Commission Final Order CLI-84-12 ML20107C4631984-11-0101 November 1984 Forwards Mc Thompson,Tm Devine & Lockert Affidavits Representing Portion of Results from 841009-30 Investigative Trip.Commission Has Adopted Adversary Position W/Respect to Public Since 840817 Stay ML20107H7671984-10-19019 October 1984 FOIA Request for Documents Re Commission Meetings Held During June,Jul & Aug 1984 on Complicating Effects of Earthquakes on Emergency Preparedness ML20107H0161984-10-15015 October 1984 FOIA Request for Documents Re Facility,Including Transcripts of Meetings Concerning Issuance of Unit 1 Full Power OL ML20107F9121984-10-0909 October 1984 FOIA Request for Transcripts of Closed Commission Meetings Held During June,Jul & Aug 1984 Re Complicating Effects of earthquakes,SECY-84-70,SECY-84-291 & Drafts of Final Order CLI-84-12 & Related Documents ML20107J4551984-10-0404 October 1984 FOIA Request for Documents on Jul 1984 SER Re Operation of Facilities ML20129A3601984-09-13013 September 1984 FOIA Request for Documents Generated in Connection W/Sser 22 (NUREG-0675) Re Operation of Facilities Which Provided Further Findings on Whistleblower Charges ML20117B7041984-09-13013 September 1984 FOIA Request for Documents Re Sser 26 (NUREG-0675) Concerning Operation of Diablo Canyon Plant ML20107K5221984-09-13013 September 1984 FOIA Request for Documents Re Ofc of Inspector & Auditor Rept by R Smith on Allegations of Staff Misconduct at Facility ML20107J8011984-09-13013 September 1984 FOIA Request for Documents Re 840612 Congressional Briefing on Facility ML20213F0181984-09-0404 September 1984 Alleges That NRC Handling of Allegations Has Shifted Burden of Proof to Allegers & Posed Threat to Anonymity.Nrc Posturing Also Alleged.Recommendations for Improved Handling & Relationship Between NRC & Whistleblowers Given ML20096H4441984-09-0101 September 1984 Suggests That Yin Be Assigned as Technical Liaison to Work W/R Meeks on Investigation.Team Could Help Regain Respect & Perform Definitive Exhaustive Investigation No One Could Challenge ML20117M9621984-08-0101 August 1984 FOIA Request for Probabilistic Seismic Safety Assessment of Diablo Canyon Nuclear Power Plant & Amend 52 to FSAR ML20093N8071984-07-31031 July 1984 Forwards Suppl Supporting T O'Neill 840727 Petition Under 10CFR2.206 on Behalf of J Mcdermott & T O'Neill.Also Expands Original Request for Retraining 1990-07-06 |
Text
.
~
DOCET m user 880F00E0 AULE ~ 7-3 FR 17.1/fr 6 f' %
ggy.-~.;-, -
n090$ED RULE M ' L 0U Yl 46 FA,202iy D*M ctua ,wus F ..
""8 )
PRO S ED Rulf 2 Y# .7/4323 N MOPOSED AULE _8d/M
/s N .,
4 Joseph Hendrie, Chairman e --
Nuclear Regulatory Commission '\ 4 %
gN q Washington, D. C. 20555 /b)>of J 5 14 9 f0 Y.,i fI
Dear Chairman Hendrie:
E m m a s1981 - e r
4 h( j b, u,s. min co m umscu u st C,
) 8 \
I oppose the following rule changes propb- d C:
- 1. Denying interveners discovery against the NRC;
- 2. Eliminating or reducing the 90 day time delay now required between completion of construction and licensing;
- 3. granting a fuel loading, low power testing license.
l I am much concerned with the safety of 'tl. . , g .e yower plants - :j : ,: -
ns is '
. :. c u ,
at Diablo Canyon and San Onofre. P1 ease helpr Iceep Celifointans healthy and free of accidental power leaks and radiatior..
). ...o . . -
y
, y ,,.m.,
_ 1 l}L LE /(f d L. . -
I l
51G N A 1 is RE h.h Y3 ~
ADUK r ds
. G f/]G 1)
/
8107070198 810503 PDR ADOCk OSGOO275 H PDR b///f)t/j f)M(/ j fG. l(~).]gg v v111 j z,1y