Interim Deficiency Rept Re Reactor Coolant Pump Motor Flanges.Final Design Mods to Be Completed in Late Summer 1978.B&W Approved Design Mod Concept & Engineering Analysis Completed.Ge Cannot Revise Detail Drawings
ML19329E416
Person / Time
Site: Midland
Issue date: 03/30/1978
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
HOWE-37-78, NUDOCS 8006120752
Download: ML19329E416 (2)


Text

_

. s- , _

, '.,

'

. CDDSumBIS

-o Power

.-....e.."

Vice Pressdent u company General Offices: 212 West unchegan Avenue. Jackson, Macnigen 49201 Ma ch 30, 1978 ..

~~

Hove-37-78 -

.. ,

. . ~ ' L . ~ .. g j 3

.

-

2 ca

-,

g '

Mr J. G. Keppler, Regicnal Director {, w ..

Office of Inspection and Enforcement ggc g. }_

Region III g gi.~

US Nuclear Regulatory Cecmission [-igg q -u 799 Roosevelt Road  % "

M Glen Ellyn, IL 60137 '

j- v4 g

"

MIDLAND NUCLEAR PL Wf - THIS DOCUMENT CONTAINS ki' UNIT NO.1, DOCKET NO. 50-329 P0OR QUAUTY PAGES UNIT NO. 2, DOCKET NO. 50-330 REACTOR C00LAI."2 PlNP MOTOR FLANGES

Reference:

Letter, S. H. Howell to J. G. Keppler, Midland Nuclear Plent -

Unit No. 1, Docket No. 50-329; Unit No. 2, Docket No. 50-330; Reactor Coolant Pu=p Motor Flanges, Serial Hove-13-78, dated February 10, 1978 The referenced letter was an interim report. This letter is also an interim report' in that the final design modifications are not anticipated to be co=pleted until late su=cer of 1978. B&W has approved the design modification concept, and the required supporting engineering analysis has been completed.

General Electric, the motor manufacturer, cannot revise the detail drawings and e field chan6e authorization package cennot be prepared to provide the

~ specific modifications for each motor until each motor is examined. Two of the motors are not available as they are presently located at Byron Jackson for performance testing.

Another interim report vill be sent on or before June 30, 1978.

. _ -C CC: - Dr Ernst Volgenau, USNRC (15)

-

1 Director, Office of Management 4 Information and Program Control, USURC (1) .l l

l i

s 8006100 7e0Ps0004 o4 go

~

s,o .

..

}

s a l

. $* O

,

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

,

eDISTRIBUTION FOR INCOMING MATERIAL 50-329/330 REC: KEPPLER J G ORG: HOWELL S H NRC DOCDATE: 03/30/78 CONSUMERS PWR DATE RCVD: 04/03/78 DOCTYPE: LETTER NOTARIZED: NO

SUBJECT:

COPIES RECEIVED LTR 1 ENCL 0 FURNISHING INFO ON CONSTRUCTION DEFICIENCY REPT, RE DEFICIENCY IN REACTOR COOLANT PUMP MOTOR FLANGES, SERIAL HOWE-13/78. DTD 02/10/78, AND ADVISING THATSUMMER LATE THE FINAL OF DESIGN 1978. MODIFICATIONS ARE NOT ANTICIPATED TO BE COMPLETED UNTIL PLANT NAME: MIDLAND - UNIT 1 REVIEWER INITIAL: XJM MIDLAND - UNIT 2 DISTRIBUTER INITI AL: DL.

L

                                  • DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************

CONSTRUCTION DEFICIENCY REPORT (10CFR50.55(E).

(DISTRIBUTION CODE BOO 4)

FOR ACTION: ASST DIR VASSALLO**LTR ONLY(1) BR CHIEF VARGA**LTR ONLY(1)

PROJ MGR HOOD **L NLY(1) LIC ASST SERVICE **LTR ONLY(1)

INTERNAL: R f ONL ) NRC PDR**LTR ONLY(1)

I "?.' T,Q.,QNLY ( 2) OELD**LTR ONLY(1)

GOSSICK & SfAW i4ETR' NLY(1) MIPC**LTR ONLY(1)

BOYD**LTR ONLY(1) DEYOUNG**LTR ONLY(1)

,

HELTEMES**LTR ONLY(1) R. MATTSON**LTR ONLY(1)

KNIGHT **LTR ONLY(1) ROSS**LTR ONLY(1)

TEDESCO**LTR ONLY(1) EISENHUT**LTR ONLY(1)

STANDARDS DEV.**LTR ONLY(1) K SEYFRIT/IE**LTR ONLY(1)

EX TERNAL: LPDR'S MIDLAND, MI**LTR ONLY(1)

TIC **LTR ONLY(1)

NSIC**LTR ONLY(1)

FERD DREHER/IE**LTR ONLY(1)

ACRS CAT A**LTR ONLY(16) l i

DISTRIBUTION: LTR 41 ENCL O SIZE: 1P CONTROL NER: 7809500 4 3

/ ri

,

      • o******************************* THE END *****************************h **F***1 i

l t