Interim Deficiency Rept Re Welding Discrepancy in Seismic Cable Tray Supports.Qc Engineers Received Weld Size & Defect Training & Tech Specs Revised
ML19329E691
Person / Time
Site: Midland
Issue date: 08/04/1978
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
HOWE-136-78, NUDOCS 8006170827
Download: ML19329E691 (10)


Text

t

'

CODSumBhS ~~~

i POW 8r L~ ,

-

- - - --- _ ..

". . .% _

[' Stephen H. Howell Vsce President General Of fices: 1945 West Parnell Road, Jacksori, Michigari 49201

  • Area Code 517 788 0453 Auguct 4, 1978 Howe-136-78

.

Mr J G Keppler, Regional Director Office of Inspection & Enforcement Region III US Nuclear Regulatory Commission 799 Roosevelt Road -

Glen Ellyn, IL 60137 -

-

Q7

'

MIDLAND NUCLEAR PLANI' - -

UNIT NO.1, DOCKEI' NO. 50-329 UNIT NO. 2, DOCKET NO. 50-330 SEISMIC CABLE TRAY SUFFORTS

Reference:

1) Letter, S H Howell to J G Keppler, Midland Nuclear Plant -

Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330;

. Seismic Cable Tray Supports, Serial Howe-75-78, acted May 12,

- ',1978.

2) Letter, S H Howell to J G Keppler, Midland Nuclear Plant -

NRC Items of Noncompliance, Inspection Report No 50-329/78-03 andNo50-330/78-03; dated June 7, 1978

3) Letter, S H Howell to J .G Keppler, Midland Nuclear Plant -

Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Seismic Cable Tray Supports, Serial Hove-107-78, dated June 30, 1978.

The referenced letters were interim 50 55(e) reports as is this letter.

Enclosed is Bechtel's final report to MCAR-23 It provides a detailed description of the corrective actions taken and reports that the "as fabricated" conditions do not present a potential detrimental effect to the public safety. The final 50 55(e) report vill be sent following approval of the proposed changes to Specification 7220-C-304, which is the only remaining corrective action to be implemented.

Another report, either interim or final, vill be sent on or before September 8, 1978.

$ ,

A* L

+zzsvooe,.

y- IP 8006170 [

- - -

- . . . _ . .-m

.

- 2 Howe-136-78

.

,

Enclosure:

MCAR-23, Cable Tray Support Construction welding Discrepancy, Final Report, Revision 1, dated August 3, 1978 CC: Director of Office of Inspection & Enforcement Att: Mr John G Davis, Acting Director, USNRC (15)

Director Office of Management Information and Program Control, USNBC (1)

_.

e e*  %

~

9 e

=~~ e . . . . , _ ,

.

1 e

!

l i

1

._ _ ._. ._ . . - .

. - - - - - - --- - - - -- ---

-

p

. .

..

.

. .

' Bechtel Associates Professional Corporation

,

SUBJECT:

MCAR #23 (Issued 4/17/78)

Cable tray support construction welding discrepancy FINAL REPORT, REVISION 1

.

DATE: August 3, 1978 PROJECT: Consumers Power Company Midland Plant Units 1 & 2 Bechtel Job 7220

.

Introduction This final report supersedes the final report dated July 24, 1978, and is prepared in response to Midland Project Manage =ent Corrective Action r Report #23, dated April 17, 1978. Project engineering's dispositions of NCRs.1287, 1306, and 1360 are summarized in this report.

Engineering Evaluation of NCRs 1287 and 1306 NCRs 1287 and 1306' address weld discrepancies in the lower cable spreading room of the auxiliary building. Connections involved are of four types and are shown in Figures 1-4. The discrepancies consisted of oversize, undersize, and weld defects. Engineering's evaluation effort was to cxamine the adeqiiacy of the actual reported weld size to the specified design load at each connection. The above engineering evaluation led _to the conclusion that the project design stress requirements have been ret. .The velds were inspected in accordance with Section 8.15 of AWS Dl.1, Rev 2-77 and the inspection did not reveal any cracks or lack of fusion between the weld metal and base metal. Therefore, there was no adverse effect and the deviations from the AISC code for minimum weld cize are found to be acceptable.

Engineering Evaluation of NCR 1360

.To evaluate the adequacy of welds in areas other than the lower cable spreading room, project engineering selected at random 50 welded support connections from the installed cable tray supports in the auxiliary building on April 25, 1978. The number of welds to be inspected was ,

.

9

.

e g --m g* w ,,.

p yy -*-ywow--ps ye

-

-

m%.

Bechtel Associates Professional Corporation MCAR # 23 FINAL REPORT REVISION 1, August 3,1978.

Page 2 determined on the basis of accepted principles of the theory of proba-bility using a binomial distribution chart for a one-sided (lower) confidence limit. The field quality control group conducted a detailed ,

inspection of the sample connections and forwarded the inspection findings to project engineering for evaluation through NCR 1360.

The maximum undersize noted in the inspected welds was 1/16 inch.

Engineering evaluation of these weld connections indicated that the stresses under as-built conditions do not exceed the design stresses.

Specification C-304, Rev 4 permits an oversize of 3/16 inch for the welds under discussion. Nine welds were found to exceed this limit, but the stresses under as-built conditions are well below the design stresses.

Convexity height, rollover, and weld reinforcement can be accepted sithout limit because these conditions occur at a minimal rate and do not reduce the efficiency of the weld joints in this type of application.

Based on the above evaluation, project engineering concludes that all

-connections inspected are adequate to meet the desit conditions specified. ,

Because all inspected welds are adequate and m. -" specified design conditions and based on the sample size used, it can be stated with a 95% level of confidence that at least (but not limited to) 94% of all the weld assemblies meet or exceed the design requirements. Therefore, project engineering concludes that the adequacy of the quality of all the inspected welds is representative of the quality of welds in the uninspected support connections.

NCR 1360 was dispositioned on June 29, 1978.

.

Corrective Action The following corrective actions have been taken:

I. The quality control engineers received training on February 13 ar.d April 6, 1978, designed to prevent further problems. Although the session conducted on February 13 preceded issuance of MCAR #23, the subsequent discrepancy reports and nonconformance reports issued since the training session in this area and a review of the quality trend program indicate that the referenced welds were performed prior to the training. The instruction required two training sessions and provided direction in the following topics:

A. Undersized Fillet Welds B. Fillet Welds-

. -

1. Proper use of "fibermetal" fillet gage.
2. Actual weld coupons were examined which showed known defects and irregularities.
3. Discussion of tolerances.

C. AWS D1.1 weld symbols were, discussed including their definitions.

_ -. ._ . _

._ . ..m

.

-

. I-yc3,,I}echtel Associates ProfessionalCorporation FINAL REPORT REVISION 1, August 3, 1978 Page 3 II. The weld engineers were directed by Welding Notice 28, dated February 13, 1978, to provide instruction to the craft welders pertinent to this problem. Employing the same rationale used above, it is felt this training also postdates the deficiency.

- >

III. The technical specification has been revised to mitigate further problems. SCN-C-304-8002, it,ued March 30, 1978, states in part,

" Welds shall conform to the visual inspection acceptance criteria of AWS D1.1.. . Minimum fillet veld sizes shall be per AWS Dl.1,

-

Section 8.15.1.6. . . Maximum underrun for fillet weld lengths shall not exceed 1/4 inch, except for weld.cnd returns, underrun shall not exceed 1/8 inch for each return." This specification change notice originally written to address MCAR #21 is applicable to and clarifies the welding specification for MCAR #23.

.IV. A more rigorous application of the QCI instructions has been instituted through training and monitoring by quality control. The stated inspection technique is no longer being modi-fied by applying qualiff ng i judgement and practical experience. QC welding engineers .

have been directed to perform weld inspections on all hanger field fillet attachment welds in strict accordance with Special Instruc-tion 8 and ACT/ TASK 3.1' of PQCI/7220 W-1.000, Rev 3.

" Special emphasis is being placed on Special Instruction 8 regarding

.

the definition of (V6M) which states, " Visually examine to detect the apparent worst condition, take a measurement to verify acceptance, and visually' compare the other items based on this measurement."

V. The initial placement of hold tags prevented the use of possibly deficient, cable tray supports. Training and strict implementation of the inspection procedure should prevent further problems in this area. Nonconformance reports 1287 and 1306, which prompted the issuance of MCAR #23, have both been dispositioned "use as is."

All hold tags were removed on May 30, 1978.

VI. Revisions to weld acceptance requirements have been developed to modify inspection criteria for electrical supports in Specification 7220-C-304. These revisions have been submitted for review by Consumers Power Company and will be issued after coordination with them is complete. .

-

.

.

e

.

.

e .

-

. . h

'

a

'MCAR #23 FINAL REPORT REV ION 1 August 3, 1978. >

-

.

> .

Reportability Project engineering's evaluation indic:.tes that the discrepancies of the veld sizes are reported in NCRs 1287,1306, and 1360 do not present. a '

potential detrimental effect to the public safety and are not a reportable condition within the requirements of the Nuclear Quality Assurance Manual,Section V, Number 10. 1 Prepared by: f.- C ,

Reviewed by:,. .

,

t 67//.f/ d b Approved by:, T c M //scV concurrence by: M M / M %

VL 3P .

~

. s-se o m

8 "

e

%

e k

.-

- .

,.

.

.

J e

e e

. -- . - ._,

- ...<

J ME~TCTC 6'

\ .

  • ' ^ '2

,

. ,

3/

Z MId-(IYR)'

'

HCAR 23 FINAL REPORT REY. 1 l

  • b/6 August 3, 1978 Page 5 R E U ElJ s\

j 3 , , . _

c'. W.N

'

Ig+g ALTERLIATE WELD 1 i LOCATiou fce BEAM E L,'s 444e d #

I --i tkj i gig, WIDTHS s OR c,EEATER

'/2 ^ 4' Mid. l'l (typ.) <

_. b  !

d \NF BEAM ( Ts col.

FILI. FL.

y x' i i Sv' as: :i%Al*JCHOR

pExPAdStop

. ELEV.(TYP)g '

' 7. , PER SPEC. SC 3

.

. ..'9;J, ,. . fI, *: )

.

.

. d.

, TS SE f A M/ 4 Ts col.$

5/

R

. '/g#

z L 'sa4

\ [ 5/yP \i (ETuraLis TYP) 4'aMitJ.N 4< ,

_

q

'~

a5/a# 557 \ A -So7 LT5 To DE

, A307 PCLTs I'

, ED To A sdLIC, FIT l'/d,,# ' 'rg,L i' (Tic,HTETHEd TURLJED '/4 TURW l --p a n .i POE TS 4 e 4 col.

.. FOR Ts 5 ' S COLS  %

.

,

pg'ElJD \ d N 6*D

'

RETded5 /o44 V m'y [6 i i EL's 4 x 5'/2d/a ' b,,

I i (sLV) TYP 1 I / 1 l

i l

/ ,

L 1 a l l I < I

'

2 3/4 % EXPAdSIO k --7 x i8

  • 3/g )

AdCHORS k # '

1

.  !

'

.

FIG. I TYPICAL. UPPER & ~

LOWER

,

SUPPORT COLUMN CONNECTION .

. . .

. don > 7T2c MC AR do. 21

.

q .

,

,

\

'

HCAR-23 FIIIAL REPORT REV. I

'

)

h$$eN

'

b N Foe esJ ALT.

E I i

E TS-Iok[ExisTidc, 1

FLooe SEAM

/ I odLY

'/;/ MAX TYPJL co EACH ElJD M TYP FOR ALT. '/4_

q8 [

_ . _ _ _ . _ _ _ _ _

,cr = = " # g - ,

' ,I

% 9 TS-5 i TS-5 til 1

, (ALT)  : (ALT) til y f y A=.:=i~

-

~

L 4 = 3 =%,= 5'- # i

- L 4 S ge4'7 NL. 4 I_ = S_g _ es'[' og'#4 L 4es43 T'(Foe AL7 (TYP Fog (LLv) cEdTERED ddDER TS 6 6 l

-

ALT.)

'/

/ Edp 'RETdRds s AT TOE OF AlJc,La

'

  • I4 (TYP. FOR ALT.)

.

'

4

~

~

FLAT STEEL SdRFACE I N &*V ) \% 1

,

Js-le d L . ) )

.l .. s [

  • i
  • gg7 g EdD \ [ 4,3,3j (TYFl) g , gi

toe Apc,LE OF5^/pg' g .

_ _

FIG.2 TYPICAL CROSSOVER BEAM CONNECTION 4_ PIS7I, ddlSTELJT OR i i i STRUCT. STEEL i i

VERT. EdPPORT i i I 'i MEMBER , /4 Plool

.

i l[1 -- - t, i

i t _ -. f .

I 1 >>

'

I l f\

-

'

i

"

3/[1 i h.

.

M "49 FIG. 3 TYPICAL ' HORIZONTAL TO VERTICAL l STRUCT MEMBER CONNECTION l

.J

_ , , . - _ _ _ _ - _ _ _ _ _ _

'>

-

'. MCAR )Jo. E S .

'

.-

'*NCkR-23FINALREPORTREV.1 August 3, 1978 Page 7 ,

,

jW BEAM OR TLJ PE STEEL r  ::: J-c _.

_  : : :

-

.

.  !

.. lllI : a ALTERL} ATE WELD LocATio LJ FOR

-

.

.

OR W^FS "' **

il WIDTHS.

._

-

n- r - ' a i I

  • c r r "b _ _

,

- -

1 ) (TYP. _  :-

(TYF' 4

i 1 i

-

g 33g i I

i Y ~

i risse rissi i j, '

..

g;' Passi (4Ve LEC, VEE .',

TYB

. gl PIOOI 4 W OR. Ts

.

FIG. 4 TYPICAL VERTICAL HANGER

'

CONNECTION

.

e e

O 9

e e

O O

e

'.,

~

..

'

G sn/re .

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIBUTION FOR INCOMING MATERIAL (50-3+- 330 1 REC: KEPPLER J O ORG: HOWELL S H DOCDATE: OS/04/78 NRC CONSUMERS PWR DATE RCVD: 08/10/78

.DOCTYPE: LCTTER - NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 15

. FORWARDING DECHTEL"S FINAL CONSTRUCTION DEFICIENCY REPT TO MCAR-23,

.CONCERNING DISCREPANCY IN THE CABLE TRAY SUPPORT CONSTRUCTION WELDING. W/ATT

' DRAWINGS.

.

PLANT NAME: MIDLAND - UNIT 1 REVIEWER INITI AL: XJM MIDLAND - UNIT 2 DISTRIBUTER INITIAL: g4_

ocoo*o*********** DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************

CONSTRUCTION DEFICIENCY REPORT (10CFR50.55E) *

(DISTRIBUTION CODE B019)

FOR ACTION: ASST DIR VASSALLO**W/ ENCL BR CHIEF LWR #4 BC**W/ ENCL PROJ MGR HOOD **W/ ENCL LIC ASST LWR #4 LA**W/ ENCL INTERNAL: GF .*W/ ENCL NRC PDR**W/ ENCL I . E**W/2 ENCL DELD**W/ ENCL GOSSICK & STAFF **W/ ENCL MIPC**W/ ENCL DIRECTOR DPM**W/ ENCL DEPUTY DIR DPM**W/ ENCL QAB**W/ ENCL DIRECTOR DSS **W/ ENCL AD FOR ENG**W/ ENCL AD FOR REAC SFTY**W/ ENCL AD FOR PLANT SYSTEMS **W/ ENCL AD FOR SYS & PROJ**W/ ENCL SDn*W/ ENCL K SEYFRIT/IE**W/ ENCL FERD DREHER/IE**W/ ENCL

'

EXTERNAL: LPDR'S MIDLAND, MI**W/ ENCL TERA **W/ ENCL NSIC**W/ ENCL

,

ACRS CAT A**W/16 ENCL

.

DISTRIBUTION: LTR 41 ENCL 41 CONTROL NDR: --7022avvo?