ML19330C699

From kanterella
Revision as of 00:27, 6 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
RO 1-80-61:on 800802,while Performing Analysis of Pipe Supports on CRD Sys,Determined That Four Supports Outside & 12 Supports Inside Drywell Could Exceed Structural Integrity.Mods for Upgrade of Supports Are Underway
ML19330C699
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/04/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
References
BSEP-80-1290, NUDOCS 8008110357
Download: ML19330C699 (1)


Text

,

Telecopied to Mr. O'Reilly August 4. 1980 5[ .

.. , , . % - . . . . . ,

Carolina Power & Light Company mmme,.,m-m x n..usan

.

Brunswick Steam Electric Plant P. O. Box 10429 Southport,.NC 28461 August 4, 1980 FILE: B09-13516 SERIAL: BSEP/80-1290

,

Mr. Janes P. O'Reilly, Director U. S. Nuclear Regulatory Cot:: mission Region II, Suite 3100 101 Marietta Street N.W.

Atlanta, GA 30303

.s BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 1 ,

LICENSE NO. DPR-71 DOCKET No. 50-325 CONFIRMATION FACSIMILE FOR AN IMMEDIATELY REPORTABLE EVENT (1-80-61)

Dear Mr. O'Reilly:

..

?* This facsimile confirms the conversation between Mr. A. C. Tollison, Jr.,

General Manager, and Mr. Paul Kellogg, of your office, at 1630 on August 2, 1980, and a subsequent conversation between Mr. A. C. Tollison, Jr., and Mr.

Austin Hardin, of your office, at 0900 on August 4, 1980.

While performing an analysis of the pipe supports on the CRD system, it has been determined that four supports outside the drywell and 12 supports inside the drywell could exceed structural integrity under the worst case conditions.

The analysis, performed by EDS Corporation, showed that these supports require redesign and upgrade to support the required loading under the worst case con-ditions. Analysis is also currently being performed on the Unit No. 2 CRD system.

Modifications for upgrade of these supports are currently in progress. Unit operation will not be resumed until completion of these modifications.

l This e-rent is being reported under Technical Specifications 6.9.1.81.

Very ly yours, l

' .

A. C. Tollison, Jr. General Manager RMP/sgb Brunswick Steam Electri Plant cc:h.R.A.Hartfield

-

I Mr. V. Stello, Jr.

CM S-

.

/O

.

800811og Q -

!- _