Updated LER 77-009/03L-1:on 770323,during Standby Operation, HPCI Was Inoperable for 5-h.Caused by Burnt Out Undervoltage Coil in Breaker for Motor Operated Valve Mo 2301-3,steam Supply Valve to Hpci.Caused by Overheating
ML19320C318
Person / Time
Site: Pilgrim
Issue date: 07/03/1980
From: Mcloughlin M
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19320C311 List:
References
LER-77-009-03L, LER-77-9-3L, NUDOCS 8007160648
Download: ML19320C318 (2)


Text

. . . . . . . . . .

(7 77)

, s LICENSEE EVENT REPORT (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

CONT ~.0L BLOCK: l 1

l l l l l lh 6

7 8 9 l Ml A lP l Pl Sl 1l@l 14 15 0 l Ol -l O LICENSEl0lO l O l 0 l -l 0 25l 0 l@l NUMBER 26 4LICENSE l Il i TYPE l il 1l@l JQ l

57 CAT 58 l@

LICENSEE CODE CON'T

"' "

loI3I 7 8 5o7RCE 60 lLl@l0l5 61 l0 l -l 0] 2l 9 l 368@l6301 3EVENT DOCK ET NUMS ER l 2 DATE l 3 l 7 l 747 l@] 75 O REPORT l 7 l QATE 0 l 3 l 880 l 0 l@

EVENT DESCRIPTION AND PRC0ABLE CONSECUENCES h Io Ial l On March 23, 1977, during Hot standbv ooerations, the HPCI was inocerable for l l o 131 l approximately 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, because of a burnt out undervoltage coil in the breaker l I o 141 l for clotor operated valve >D 2301-3, steam supply valve to the HPCI. (Refer to l lo Isl I supplement for additional information). l I

I o 16 I l Io I7I I I I

I o la I I 60 7 8 9 E CO E SLBC E COMPCNENT CODE SUqCCCE SU E lo191 7 8 (S l Fl@ W@ l Al@ lC lK lT lB lK lR l@ l Cl@ ]@

9 10 11 12 13 18 19 20

_ SEQUENTI AL CCCUR R ENCE REPORT REVISION LE R/ Ro EVENT YEAR R EPCRT NO. CODE TYPE No.

h , Reg l-l l010l9l l/l l 01 3l l Ll l-l l1 l

_ l217l7l 22 23 24 26 27 28 29 30 31 32 K N AC C C P T ME HOURS S8 i POR S. UP Li MANbpAC RER l33A l@l34F l@ l35Z l@ l2l@

36 l010l010l 3/ 40 lY 41 l@ [Nj@ lAl@ l44C l 7 l 7 l 047l@

42 43 CAUSE CESCRIPTION AND CCARECTIVE ACTIONS @

li lol l A 230V DC coil #1513-2 sucolied bv Cutler-Hammer overheated due to a high floating 1

{itiji charge on the 250V station batterv system. which is necessarv to maintain batterv I I i l 21 l capacity. l 11 131 I l 11 141 l l 7 8 9 80

$A  % PCWER OTHER STATUS IS AY DISCOVERY CESCRiPTION I1 l5' l l Gl@ l 0 l 0 l 0"]@l" N.A. l lAl@l Operational Event l

' " " " "

AdriviTY Cc5 TENT RELEASED CPRELEASE AMOUNT OP ACTIVITY LtXATION CP AELEASE N.A. l l N.A. l l i l 68 l3l Zl @ ltoZ l@l 7 11 44 45 80 PER$CNNEL EXPCSURES NUUSER TYPE C ESCRIPTION

  • l i l 71 l 0l 0 l 0 l@l Zl@l N.A. l PERSONN E L INJURIES NLVBER CESCRIPTION l i j a j l 0 l 0 l 0 l@l N.A. l 7 8 9 n 12 80 LCSS or CA OAV AGE TO P4CILITV Q TYPE DESCRIPTION v N.A.

l1l9llZl@l 7 8 9 10 80 l

ISSU ED e 12 i o l l N I@DE l CRiPTtON N.A. l lll[lllll1l 1lj 7 8 9 to 68 69 80 g Mr. M. Thc=as McLoughlin 617-746-7900 0

  • "' 3 8 0 0 716 OW8 "'"^"'"

X

<t

, . ,

BOSTON EDISON COMPMPI

- -

PILCRn! NUCLEAR PCWER STATION

, DOCKET No. 50-293

.

. Attachment to LER 77-009/03L-1 *

-

.

Event Description

  • On March 23, 1977 at approximately 1245 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.737225e-4 months <br />, smoke was observed in the _ area of 250V DC Motor Control Center D9. Further investigation traced the source of smoke to breaker 72-944, powar supply to HPCI steam supply motor operated valve M02301-3. The breaker was de-energized and maintenance investigation found the undervoltage coil burnt out.

The burnt undervoltage coil and relay assembly were removed. Replacement under-voltage coils of a larger capacity were evaluated and PDCR 76-89 issued to permanently resolve this problem. . While this study is in progress, the per-missives for undervoltage protection for motor operated valve MO-2301 have been jumpered in accordance with approved station operating procedures. The breaker was returned to servic.e and tested at approximately 1745 hours0.0202 days <br />0.485 hours <br />0.00289 weeks <br />6.639725e-4 months <br /> on March 23, 1977 and the HPCI_was declared operable.

J During the Re'fue'1'IV Outage, the above undervoltage coil and reiay assesiy- ~

and similar units on other safety related equipment were upgraded. PDCR 76-89 has been completed.'

.

  • **