ML20195C995

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With
ML20195C995
Person / Time
Site: Pilgrim
Issue date: 10/31/1998
From: Alexander J, Cannon R
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-2.98.146, NUDOCS 9811170266
Download: ML20195C995 (4)


Text

'

9 saeam m l

Pilgrim Nuclear Power Station Tech. Spec. 5.6.4

's l

Rocky Hill Road l_

Plymouth, Massachusetts 02360-5599 l

November 13, 1998 BECo Ltr. 2.98.146 l

l J.F. Alexander l

Nuclear Assessment Group Manager

]

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50.293 j.

License No. DPR-35 l

October 1998 Monthly Operatina Report in accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.4, the operational l

status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. Should you have questions or comments concerning this report, please contact Robert l

Cannon at (508) 830-8321.

l F. Ale er t

l l

RLC/298146

Attachment:

October 1998 Monthly Operating Report 9811170266 981031 PDR ADOCK 05000293 R

PDR y

I

. cc: Mr. Hub:rt Millar Ragionil Administrator, R gion i U.S. Nucliar Rrgulatory Commission -

475 Allendale Road

' King of Prussia, PA 19406 enlor Resident inspector l

i

]

I r

i L

L I

l '

I 1.

..2 Attachment ~

j OPERATING DATA REPORT ~

J DOCKET NO.

50-293

[.

NAME:

Pilarim l

COMPLETED BY:

R.L. Cannon TELEPHONE:

(508) 830-8321 REPORT MONTH:

October 1998 OPERATING STATUS NOTES 1

r

1.. Unit Name Pilgrim i
2. Reporting Period -

October 1998

3.. Licensed Thermal Power (MWt) 1998
4. -Nameplate Rating (Gross MWe) 678 l'

5' Design Electrical Rating (Net MWe) 655

6. Maximum Dependable Capacity (Gross MWe) 696
7. Maximum Dependable Capacity (Net MWe) 670
8. If Changes Occur in Capacity Ratings (item Numbers 3 through 7) Since Last Report, Give Reasons:

No Chanaes -

9. Power Level To Which Restricted, if Any (Net MWe):

None

'10. Reasons For Restrictions, if Any:

N/A THIS MONTH YR-TO-DATE CUMULATIVE l.

11. Hours in Reporting Period 745.0 7296.0 226992.0 l'
12. Hours Reactor Critical 745.0 7296.0 149010.9 13; Hours Reactor Reserve Shutdown 0.0 0.0 0.0
14. Hours Generator On-Line -

745.0 7296.0 144307.5

15. Hours Unit Reserve Shutdown 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1472398.0 14217606 259829046.0

" 17. Gross Electrical Energy Generated (MWH) 515030.0 4908210.0 88197694.0

18. Net Electrical Energy Generated (MWH) 496100.0 -

4728495.0 84806889.0

19. Unit Service Factor 100.0 100.0 63.6

. 20. Unit Availability Factor-100.0 100.0 63.6

21. Unit Capacity Factor (Using MDC Net) 99.4 96.7 55.8
22. Unit Capacity Factor (Using DER Net) 101.7 98.9 57.0
23. Unit Forced Outage Rate 0.0 0.0 11.0 7
24. Shutdowns, Scheduled Over Next 6 Months (Type, Date, and Duration of Each)

None

- 25. lf Shutdown At End Of Report Period, Unit Operating L

L L

'~

DOCKET NO.

50-293 NAME:

Pilarim COMPLETED BY:

R.L. Cannon TELEPHONE-(508)830-8321 REPORT MONTH:

October 1998 OPERATION

SUMMARY

The plant entered October at 100 percent Core Thermal Power (CTP) where it was essentially maintained for the remainder of the reporting period.

No challenges to safety relief valves occurred during the reporting period UNIT SHUTDOWNS METHOD OF CAUSE/ CORRECTIVE ACTION / COMMENTS TYPE DURATION REASON SHUTTING DOWN NO.

DATE (HOURS)

REACTOR 1

2 3

No unit shutdowns occurred during this reporting period.

1 2

3 F - Forced A - Equip Failure 1 - Manual S - Scheduled B - Main or Test 2 - Manual Scram C - Refueling 3-Auto Scram D - Regulatory Restriction 4 - Continuation E - Operator Training &

5 - Other License Examination F-Admin G - Operation Error H - Other

-.