O gootory EAlanup Pilgrim Nuclear Power Station Rocky Hill Road Tech. Spec. 5.6.4 Plymouth, Massachusetts 02360-5599 December 11, 1998 BECo Ltr. 2.98.158 J.F. Alexander Nuclear Assessment Group Manager U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50.293 License No. DPR-35 November 1998 Monthly Operatina Report in accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. Should you have questions or comments concerning this report, please contact Robert Cannon at (508) 830-8321.
.e-r r-s.
J.. exander 05hoo293 30 PM
\\
RLC/bjt 298158
Attachment:
November 1998 Monthly Operating Report 4
'u 7D l
..,....... _ - -.... -... -. _ _. -., ~ -..
cc: Mr. Hubert Mill:r -
L R:gionil Administritor, R gion I
. U.S. Nuclear Regulatory Commission
' 475 Allendale Road i
King of Prussia, PA 19406 Senior Resident inspector t
i s.
~
l r-l l
I E-i r
l.
o Attachm@nt
~
~
OPERATING DATA REPORT DOCKET NO.
50-293 NAME:
Pilarim l
COMPLETED BY:
R.L. Cannon TELEPHONE:
(508) 830-8321 REPORT MONTH:
November 1998
)
OPERATING STATUS NOTES l
- 1. Unit Name Pilgrim I L
- 2. Reporting Period November 1998
\\
- 3. Licensed Thermal Power (MWt) 1998
- 4. Nameplate Rating (Gross MWe) 678 l-
. 5. Design Electrical Rating (Net MWe) 655
- 6. Maximum Dependable Capacity (Gross MWe) 696
- 7. ' Maximum Dependable Capacity (Net MWe)-
670 l
- 8. If Changes Occur in Capacity Ratings (Item Numbers 3 through 7) Since Last Report, Give Reasons:
No Chanaes
- 9. Power Level To Which Restricted, if Any (Net MWe):
None
- 10. Reasons For Restrictions, if Any:
N/A THIS MONTH YR-TO-DATE CUMULATIVE
- 11. Hours in Reporting Period 720.0 8016.0 227712.0
- 12. Hours Reactor Critical -
720.0 8016.0 149730.9
- 13. Hours Reactor Reserve Shutdown
' O.0 0.0 0.0
- 14. Hours Generator On-Line 720.0 8016.0 145027.5
- 15. Hours Unit Reserve Shutdown 0.0 0.0 0.0 o
- 16. Gross Thermal Energy Generated (MWH) 1424655.0 15642261.0 261253701.0 l
- 17. Gross Electrical Energy Generated (MWH) 498940.0 5407150.0 88696634.0
- 18. Net Electrical Energy Generated (MWH) 480578.0 5209073.0 85287467.0
~
~ 19. Unit Service Factor 100.0 100.0 63.7 l
- 20. Iinit Availability Factor 100.0 100.0 63.7
- 21. Unit Geoacity Factor (Using MDC Net) 99.6 97.0 55.9
' 22. Unit Capacky Factor (Using DER Net) 101.9 99.2 57.2
- 23. Unit Forced Ouage Rate 0.0 0.0 10.9
- 24. Shutdowns, Scht.duled Over Next 6 Months Refueling Outage No.12. Commencing (Type, Date, and LTuration of Each)
April 23,1999. Scheduled duration 35 days.
c
- 25. If Shutdown At End Of Report Period, Unit Operating Estimated Date of Startup
DOCKET NO.
50-293 NAME:
Pilarim COMPLETED BY:
R.L. Cannon TELEPHONE:
(508) 830-8321 REPORT MONTH:
November 1998 OPERATION
SUMMARY
The plant entered November at 100 percent Core Thermal Power (CTP) where it was essentially maintained for the remainder of the reporting period. No challenges to safety relief valves occurred during the reporting period UNIT SHUTDOWNS METHOD OF CAUSE/ CORRECTIVE ACTION / COMMENTS TYPE DURATION REASON SHUTTING DOWN NO.
DATE (HOURS)
REACTOR 1
2 3
No unit shutdowns occurred during this reporting period.
1 2
3 F - Forced A - Equip Failure 1 - Manual S - Scheduled B - Main or Test 2 - Manual Scram C - Refueling 3 - Auto Scram D - Regu!atory Restriction 4 - Continuation E - Operator Training &
5 - Other i
License Examination F - Admin G - Operation Error H - Other I-i i
e
. -.