ML20209C473
ML20209C473 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 07/07/1999 |
From: | NRC (Affiliation Not Assigned) |
To: | |
Shared Package | |
ML20209C471 | List: |
References | |
NUDOCS 9907120004 | |
Download: ML20209C473 (1) | |
Similar Documents at Pilgrim | |
---|---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20216G5991999-09-24024 September 1999
[Table view]Corrected Safety Evaluation Supporting Amend 182 to License DPR-35,consisting of Corrected Page 1 ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20209G3851999-07-15015 July 1999 Safety Evaluation Supporting Amend 182 to License DPR-35 ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20198H5671998-12-21021 December 1998 Safety Evaluation Supporting Amend 180 to License DPR-35 ML20198A2391998-12-11011 December 1998 Safety Evaluation Supporting Amend 179 to License DPR-35 ML20195B9161998-11-10010 November 1998 Safety Evaluation Supporting Amend 178 to License DPR-35 ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20236X4681998-07-31031 July 1998 Safety Evaluation Supporting Amend 177 to License DPR-35 ML20236U9781998-07-28028 July 1998 Safety Evaluation Supporting Amend 176 to License DPR-35 ML20249B8331998-06-19019 June 1998 Safety Evaluation Supporting Amend 175 to License DPR-35 ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20203A4221998-02-11011 February 1998 Safety Evaluation Supporting Proposed Corporate Restructuring of Beco ML20198R7901997-10-30030 October 1997 Safety Evaluation Supporting Amend 174 to License DPR-35 ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20137R8161997-04-0707 April 1997 Safety Evaluation Supporting Amend 171 to License DPR-35 ML20137D0511997-03-20020 March 1997 Safety Evaluation Approving Third 10 Yr Interval ISI Program & Requests for Relief ML20134K2621997-02-10010 February 1997 Safety Evaluation Accepting Licensee one-time Request to Defer Insp of N2A & N2B safe-end Welds,Per GL 88-01 ML20133C3111996-12-27027 December 1996 Safety Evaluation Supporting Amend 169 to License DPR-35 ML20129H3901996-10-30030 October 1996 Safety Evaluation Re Facility IPE Submittal for Internal Events & Internal Flood ML20128N8811996-10-0404 October 1996 Safety Evaluation Supporting Amend 167 to License DPR-35 ML20129F4031996-09-27027 September 1996 Safety Evaluation Accepting Second ten-year Interval Inservice Insp Program Plan Request for Relief ML20116L3231996-08-12012 August 1996 Safety Evaluation Supporting Amend 166 to License DPR-35 ML20096H2821996-01-23023 January 1996 Safety Evaluation Supporting Amend 165 to License DPR-35 ML20081L8941995-03-27027 March 1995 Safety Evaluation Supporting Amend 162 to License DPR-35 ML20081H8971995-03-22022 March 1995 Safety Evaluation Supporting Amend 161 to License DPR-35 ML20081J0381995-03-22022 March 1995 Safety Evaluation Supporting Amend 160 to License DPR-35 ML20080T7271995-03-0808 March 1995 Safety Evaluation Supporting Amend 159 to License DPR-35 ML20072H9821994-08-22022 August 1994 Safety Evaluation Supporting Amend 156 to License DPR-35 ML20029E6901994-05-16016 May 1994 Safety Evaluation Supporting Amend 153 to License DPR-35 ML20065H4431994-04-0606 April 1994 Safety Evaluation Supporting Amend 151 to License DPR-35 ML20059C3751993-12-29029 December 1993 Safety Evaluation Granting Exemption & Approving Alternative DAC Values for Use in Place of Generic Value for Radionuclides Specified in App B to 10CFR20.1001 - 20.2402 ML20058G2781993-11-29029 November 1993 Safety Evaluation Granting IST Program Relief Per 10CFR50.55a(f)(6)(i) & Approving Alternatives Per 10CFR50.55a(f)(4)(iv) ML20057D7571993-09-28028 September 1993 Safety Evaluation Supporting Amend 149 to License DPR-35 ML20056F5301993-08-11011 August 1993 Safety Evaluation Re Licensee Response to Reg Guide 1.97, BWR Neutron Flux Monitoring. Criteria of NEDO-31558, Acceptable for Current BWR Operating License & Const Permit Holders ML20045D9291993-06-23023 June 1993 SE Granting Relief from Certain Testing Requirements Impractical to Perform & Authorizing Proposed Alternatives Where Compliance Would Result in Hardship W/O Compensating Increase in Safety ML20036A2311993-05-0404 May 1993 SER Approving Util 930115 Request Re Onsite Disposal of Contaminated Radioactive Const Soil,Per 10CFR20.302(a) ML20035B1661993-03-25025 March 1993 Safety Evaluation Supporting Amend 147 to License DPR-35 ML20127P5631993-01-27027 January 1993 Safety Evaluation Supporting Amend 146 to License DPR-35 ML20127P5431993-01-25025 January 1993 Safety Evaluation Supporting Amend 145 to License DPR-35 ML20126F8121992-12-23023 December 1992 Safety Evaluation Accepting Facility Design W/Respect to RG 1.97 ML20116M5611992-11-16016 November 1992 Safety Evaluation Supporting Amend 143 to License DPR-35 ML20101T5191992-07-15015 July 1992 Safety Evaluation Supporting Amend 142 to License DPR-35 ML20091C8731991-06-26026 June 1991 Safety Evaluation Supporting Amend 139 to License DPR-35 1999-09-24 Category:TEXT-SAFETY REPORT MONTHYEAR05000293/LER-1999-010-02, :on 990918,reactor Startup Was in Progress. Caused by Communications Breakdown That Resulted in Operations Personnel Failing to Complete Actions in IAW Procedures.Power Ascension Was Secured.With1999-10-18018 October 1999
[Table view]
ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With 1999-09-08 |
Text
T'.
e p Rfc Op-t UNITED STATES g
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20565 @ 01 T.
/
ADDENDUM TO SAFETY EVALUATION ON THE PROPOSED TRANSFER OF OPERATING LICENSE AND MATERIALS LICENSE FROM BOSTON EDISON COMPANY TO ENTERGY NUCLEAR GENERATION COMPANY PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 OPERATING LICENSE NO. DPR-35 On April 29,1999, an order was issued approving the proposed transfer of the operating and materials licenses for the Pilgrim Nuclear Power Station from Boston Edison Company to Entergy Nuclear Generation Company (Entergy Nuclear). The application for approval
)
described Entergy Nuclear as a subsidiary of Entergy Power Generation Company, which in turn is a subsidiary of Entergy Corporation. Subsequent to the issuance of the order, counsel for Entergy Nuclear informed the Commission, by letter dated June 7,1999, of a planned substitution of the direct corporate parent of Entergy Nuclear. Instead of Entergy Power l
Generation Company being the direct parent of Entergy Nuclear, Entergy Nuclear Holding i
Company #1 would become the direct parent prior to consummation of the transfer of the l
licenses. Entergy Corporation, which would be the parent of Entergy Nuclear Holding l
Company #1, would still, therefore, be the indirect parent company of Entergy Nuclear.
l l
The NRC staff has reviewed and considered the abovo proposed substitution of the direct L
parent of Entergy Nuclear that would occur prior to the actual transfer of the licenses. The staff l
has determined that the proposed substitution would net adversely affect the staff's previous l
analysis and conclusions regarding the proposed transfer of licenses, and would not i
necessitate any change in the conditions of approval as reflected in the April 29,1999, order.
In addition, no changes would be necessary to the approved conforming amendment.
l Accordingly, the proposed substitution of the direct parent company of Entergy Nuclear would not invalidate or otherwise require any alteration of the April 29,1999, order, and would not require further NRC licensing action.
Principal Contributor: M. Dusaniwskji Date:
July 7,1999 Enclosure 9907120004 990707 PDR ADOCK 05000293 P