Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station
ML20203D610
Person / Time
Site: Pilgrim
Issue date: 11/30/1997
From: Cannon R, Desmond N
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-2.97.130, NUDOCS 9712160241
Download: ML20203D610 (3)


Text

= , *

, *- Tcch. Spec. 6.9.A.2

e
*-

Q

=

mm Pilgrim Nuclear Power Statrn Rocky Hill Road Plymouth, Massachusetts 02360-5599 Noney L Desmond Regulatory Relations Group Manager December 12,1997 BECo Ltr. 2.97.130 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50.293 License No. DPR-35 November 1997 Monthly Report

'In accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.A.2, a copy of the (

l Operational Status Summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. - Should you have any questions conceming this report, ple ^e contact me directly.

N0Q' N. L. Desmond RLC/dcg/Itrraoc Attachment November 1997 Monthly Report cc: Mr. Hubert Miller

- Regional Administrator, Region i \\

U.S. Nuclear Ragulatory Commission 475 Allendale Road King of Prussia, PA 19406

' Senior Resident inspector

/ [L o 9712160241 971130 PDft ADOCK 05000293 R PDR m_ ~ w - ,

- - . - --. . . . . - - _ _ . . ~

g.

.- Att:chmtnt QPERATING DATA REPORT DOCKET NO. 54293-NAME: Eilorim COMPLETED BY: R.L. Cannon TELEPHONE: (508) 830-8321 REPORT MONTH: November 1997 4 QEERATING STATUS NOTES

1. Unit Name Pilgrim i
2. Reporting Period November 1997
3. Licensed Thermal Power (MWt) 1998
4. Nameplate Rating (Gross MWe) 678
5. Design Electrical Rating (Net MWe) 655
6. Maximum Dependable Capacity (Gross MWe) 696
7. Maximum Dependable Capacity (Net MWe) 670
8. If Changes Occur in Capacity Ratings (Item Numbers 3 through 7) Since Last Report, Give Reasons:

No Chanaes

9. Power Level To Which Restricted, If Any (Net MWe): None
10. Reasons For Restrictions,if Any: N/A

, THIS MONTH YR-TO-DATE CUMULMIVE

11. Hours in Reporting Period 720.0 8016.0 218952.0
12. Hours Reactor Critical 546.2 6430.9 141077.8
13. Hours Reactor Reserve Shutdown - 0.0 0.0 0.0
14. Hours Generator On-Line 538.4 6269.6 136439.4
15. Hours Unit Reserve Shutdown 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1015010.0 12104802.0 244580732.0
17. Gross Electrical Energy Generated (MWH) 348380.0 4125280.0 82932894.0
18. Net Electrical Energy Generated (MWH) 335314.0 3967682.0 79735645.0

.19. Unit Service Factor 74.8 78.2 62.3-7 20. Unit Availability Factor 74.8 78.2 62.3

21. Unit Capacity Factor (Using MDC Net) 69.5 73.9 54.4
22. Unit Capacity Factor (Using DER Net) 71.1 75.6 55.6
23. Unit Forced Outage Rate 25.2 10.4 11.4
24. Shutdowns, Scheduled Over Next 6 Months (Type, Date, and Duration of Each) Planned - April 22,1998 - 7 days Lif Shutdown At End Of Report Period,

' Estimate Date Of Start-Up 12/03/97-

DOCKET NO. 50-293 -

NAME- Pilcrim -

COMPLETED BY: R. L Cannon

  • TELEPHONE: (508) 830-8321 ,

REPORT MONTH: November 1997 OPERATION

SUMMARY

The plant entered November at approximately 100 percent core thermal power (CTP) where it was essentially maintained until November 5,1997.

On November 5,1997, at 1810 hours0.0209 days <br />0.503 hours <br />0.00299 weeks <br />6.88705e-4 months <br />, the plant reduced power in response to a "B" recirculating pump trip while performing a surveillance. On November 6,1997, at 2155 hours0.0249 days <br />0.599 hours <br />0.00356 weeks <br />8.199775e-4 months <br />, the plant attained 100% CTP where it was essentially maintained until November 14,1997. On November 14, 1997, at 1805 hours0.0209 days <br />0.501 hours <br />0.00298 weeks <br />6.868025e-4 months <br />, the plant reduced power in response to receiving the "D" moisture separator drain tank level high alarm. On November 15, 1997, at 0201 hours0.00233 days <br />0.0558 hours <br />3.323413e-4 weeks <br />7.64805e-5 months <br />, the plant attained 100% CTP where it was essentidly maintainM until November 21,1997. On November 21,1997, at 2340 hours0.0271 days <br />0.65 hours <br />0.00387 weeks <br />8.9037e-4 months <br />, the plant commenced a planned reduction in power to perform a thermal backwash of the main condenser. On November 22,1997, while ct reduced power for the main condenser backwash, main steam isolation valves (MSIVs) AO-203-1C and AO-203-2B did not indicate fu!! closed during the quarterly surveillance. On November 23,1997, at 1025 nours, the plant was taken off line to facilitate maintenance oi. the MSIVs. The plant ended the reporting period in a shutdown condition. Maintenance activ".ies were performed in accordance with the outage schedule. No scfety relief valve challenges occurred during the reporting period.

UNIT SHUTDOWNS METHOD OF CAUSE/ CORRECTIVE ACTION / COMMENTS TYFE DURATION REASON SHUTTING NO. DATE (HOURS) DOWN REACDR 1 2 3 1 971123 F 181.6 A 1 Reactor was manually shutdown when Main Steam isclation valves AO-203-1C and AO-203-28 did not indicate fully cbsed during surveillance testing. The details regarding this shutdown will be documented in License Event Report 97-025-00.

1 2 3 F - Forced A - Equip Failure 1 - Manual S - Scheduled B - Main or Test 2 - Manual Scram C - Refueling 3- Auto Scram D - Regulatory Restriction 4 - Continuation E - Operator Training & 5 - Other License Examination F- Admin i G - Operation Error

( H - Other

-.