05000293/LER-1983-022-03, /03L-0:on 830413,overload on Valve Motor 1301-17 Resulted in Loss of High Pressure Core Cooling Backup Capability.Caused by Oxidation in Motor End Bell & Motor Brushes,Due to Humidity Caused by Leaking Valve Packing

From kanterella
(Redirected from ML20023D018)
Jump to navigation Jump to search
/03L-0:on 830413,overload on Valve Motor 1301-17 Resulted in Loss of High Pressure Core Cooling Backup Capability.Caused by Oxidation in Motor End Bell & Motor Brushes,Due to Humidity Caused by Leaking Valve Packing
ML20023D018
Person / Time
Site: Pilgrim
Issue date: 05/04/1983
From: Crowder J
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20023D016 List:
References
LER-83-022-03L, LER-83-22-3L, NUDOCS 8305190029
Download: ML20023D018 (1)


LER-1983-022, /03L-0:on 830413,overload on Valve Motor 1301-17 Resulted in Loss of High Pressure Core Cooling Backup Capability.Caused by Oxidation in Motor End Bell & Motor Brushes,Due to Humidity Caused by Leaking Valve Packing
Event date:
Report date:
2931983022R03 - NRC Website

text

T N "C FM.M 3sg U.S. NUCL3 AR M':TULATWY CSMMISSt3 N APP d VEDi,Y %MS 8858881' Uo*[r3so LICENSEE EVENT REPORT CONTROL B LOCK: l l

l l

l l

l@

(PLEASE PRINT oR TYPE ALL REOUIRED INFORMATloN)

FlIl b. l A l P l Pl Sl 1 l@l 0 l 0 l -l 0l0 l 0 l 0 l 0 l -l Ol 0 l@l 4 l 1 l 1l 11 Il@l l

l@

7 LIC EN.EE CODE le 9.

LIC EN.E NU M.E R I.

2.

LIC E N.E T YPE

.7 CAT..

I CON'T l 0 l1 l "C"' l Ll@l0 l 5 l 0 l -l 0l 219 l 3 l@l 0 l 411 l 318 l 3 l@l 0l5 l 0 l 4 l 8 I 3 l@

y

.9 DOCK ET NUMW ER EVENT D ATE 74 7.

R EPORT D ATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h l o 12 l l On 4/13/83, while performing the RCIC valve timina (in anticipation of making l

l 0 l3 l l HPCI inop. for maintenance) the 1301-17 valve motor indicated an overload. thus l

lo l4 l l creating a loss of high pressure core cooling backup capability. RCICwasmadein]

I l o lS l l opernble due to the 1'101-17 MOV prnblom nnd nn invoerionrinn en datormino eniico l 0 l6 l l was initiated. The LCO was met through performance of tests required by T.S.

l l o l 7 l l Section 4.5.D.2. This event created no threat to the public health and safety.

l loIsll l

'm'E m'I

  • =E

.U Cl.;E

. "h":E C MPONENT.

.E lol9l lC lE l @ [EJ @ lA l@ lV l A l L l Vl 0l Pl@ lB l@ l D l@

lm:,":.'".'

  • m """
- E,EN,, EAR O ' " 'N I813 I l-l 101212l I/I I 01 31 L.tj I-I LO_J 5

. It II 33 to 2.

27 3.

I.

3 El 32 TAKEN ACTON ON PLANT M ETHOD HOUR.

M TTED FORM.U S.

.U P P LI E M ANUF ACTUR ER l B l@lZ l@ l Zl@

lZl@

[0l010 W l Nl@

l Nl@ lN l@

lGl0l8l01 33 34 3.

3.

31 4.

49 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVF ACTIONS h 1110llA humid atmosphere, created by leaking valve packing in the near vicinity, caused]

lil'l [ oxidation in motor end bell and on motor brushes. Motor was repaired by G.E.,

l l1l2ll tested,run reinstalled. The motor windinas were lacauered and heat treated and l l 1 l 37 l the bearines were replaced before reinstallation. The valve operator was over-l I114 l l hauled and the valve was repacked. No future corrective action is required.

l r

' T A E'l

@ l"'/ COVE

%PONER OTNER.T ATu.

oi.COvERv oe.CR PnON l t l s l [gj @ l 0 l 91 9 l@l N/A lBl@l Operator observation l

44 RELE

.ED RELE A.E Aff 0UNT OF ACTIVITV LOC ATIO*e OF R ELE A.E I 116 I [KJ @ [Zj@l N/A l

[

N/A l

i.

is a

a a

N MSER TTPE D E. C R IPT LO N l i17 l l 0101 Ol@[Zj@l N/A

}

i.

NUM ER E. C R I PT IO N l

l il e l l O l 01 Ol@l h/A l

'J Or OR o Ai. Ag'TO,r A ciuT vg L

l1l9l

@[

N/A l

8305190029 830504 oE.cRiPnON@

PDR ADOCK 05000293 NRC USE oNLY

,U.uC,,,

is uEn l TIM l N IOL._

S PDR

\\

l lllllllllllll 1

i l

617-746-7900 NA ME oF PREPARER J. D. Crowder PHONE: