, - -.. _
Tech. Spec. 6.9.A.2 0
BOSTONEDISON Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, Massachusetts 02360 l
June 14,1998 l
BECo Ltr. 2.98.094 l
J.F. Alexander Regulatory Relations Group Manager U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50.293 License No. DPR-35 June 1998 Monthly Operatina Report in accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.A.2, a copy of the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. Should you have any questions concerning this report, please contact me directly.
og P*
J.F. Alexander RLC/deg/298094
Attachment:
June 1998 Monthly Operating Report l
cc: Mr. Hubert Miller
{
Regional Administrator, Region I l
U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 1
Senior Resident inspector g g, r'
.sO 4 ; 'j ; D (
9807160112 990630 PDR ADOCK 05000293 R
Att chm:nt OPERATING DATA REPORT DOCKET NO.
50-293 NAME:
Pilorim COMPLETED BY:
R.L. Cannon TELEPHONE:
(508) 830-8321 REPORT MONTH:
June 1998 OPERATING STATUS NOTES
- 1. Unit Name Pilgrim 1
- 2. Reporting Period June 1998
- 3. Licensed Thermal Power (MWt) 1998
- 4. Nameplate Rating (Gross MWe)-
678
- 5. Design Electrical Rating (Net MWe) 655
- 6. Maximum Dependable Capacity (Gross MWe) 696
- 7. Maximum Dependable Capacity (Net MWe) 670
- 8. If Changes Occur in Capacity Ratings (Item Numbers 3 through 7) Since Last Report, Give Reasons:
No Chances
- 9. Power Level To Which Restricted, if Any (Net MWe):
None
- 10. Reasons For Restrictions, if Any:
N/A THIS MONTH YR-TO-DATE CUMULATIVE
- 11. Hours in Reporting Period 720.0 4343.0 224039.0
- 12. Hours Reactor Critical 720.0 4343.0 146057.9
- 13. Hours Reactor Reserve Shutdown 0.0 0.0 0.0 l
- 14. Hours Generator On-Line 720.0 4343.0 141354.5
- 15. Hours Unit Reserve Shutdown 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1429591.0 8524979.0 254136419.0
.17. Gross Electrical Energy Generated (MWH) 479380.0 2949800.0 86239284.0
- 18. Net Electrical Energy Generated (MWH) 479607.0 2842852.0 82921246.0 1
- 19. Unit Service Factor 100.0 100.0 63.1
. 20. Unit Availability Factor 100.0 100.0 63.1
- 21. Unit Capacity Factor (Using MDC Net) 99.4 97.7 55.2
- 22. Unit Capacity Factor (Using DER Net) 101.7 99.9 56.5 l
- 23. Unit Forced Outage Rate 0.0 0.0 11.2
. 24. Shutdowns, Scheduled Over Next 6 Months (Type, Date, and Duration of Each)
None
- 25. lf Shutdown At End Of Report Period, Unit Operating i
i
/
e dp 1
2 o8 io e n3 r h et n
8 pg n0 9 n
a3 9 ei 3mC8 1
h r 9i t u
. )8 e d
2roL 0n u
t
-0l 5 u od S
i 5PR( J h e T
gm N
ur E
oo rf M
Y H
h e M
r B
T p
O t
N d
O.
DEO e s C
n a
/
ENM ia N
w N
T O O
t T
E T
n e I
E: L H c
T R
ian C
KEP PE O ma A
CMM L P n
E lye OAOEE lan T
V t
I DNCTR it ia C
nem E
s R
s ev R
ei O
m t
sc C
a n
mo ae r
Y r
/
c i
wr E
Srat R
o S
S l
laSn a
t cu A
ice N
U a
M r
rd A
u u i e M
e e W
C aa uot 3
n not nh t
t h a O
MMACO U
wle D
S
) r T
N 1 2345 N
P y-U W
O Tt H
e Cf S
O IT
( a FD A
r s T
O G R3 n
R er I
E wo N
DN O o
n i&o o a U
OTT j
I t
it iga P
c Pm HTC O
lao.
EHE enm r nn t
TUA si i ro r
mNd MSR et Ra i
r a
E o
r s
r e.i i e yT x r
u r
E n
hPe laTgor r
o nt oe it TTp N
Fr iat s nar ol eCe O
p el a ur nir e
r h
inu uif geeme o%t S
2 2
qaeepcd d
i pht C0g A
o EMRROLAOO 0n E
i r
%1 i R
e r
0 u
p ABCDE FGH 0 yd g
1 led n
lya e N
i t
tr O) o r
emr I S p
iu TR e
taxc AU r
moc RO is r o ixp UH h
ops D(
g t
d a e e
r ptaa in lu v
p l
r d d u
e e a
v d
c d
h t
aof E
d oc r
ie P
1 e
1 ri FS e
l Y
r ee r
npr T
u J gty c
FS u
c ne o
dif et a s
r n
r os ep E
w o
T o
tnet A
d r
e s
D u
t e e h
tnhg s
at n it pd e l
el n
l eda u
h nh O
o Tec N
N
l..
l NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
50 526 UNIT NAME:
PVNGS-1 DATE:
7/10/98 COMPLETED BY:
J. D. Fulton l-TELEPHONE:
f 602) 250-3549 Reporting Period:
June 1998 1.
Design Electrical Rating (Net MWe):
1265
~
2.
Maximum Dependable Capacity (Net MWe):
1243
- ' { Unit 1 Nhil..i Stuttatica V SThis Month!
. Irlto Date~
Cumulative" 3.
Hours Reactor was Cettical 720.0 3,456.9 77,453.2 4.
'Hosrs Generator'was'On-dne !
720.0 3,403.5 76,214.6 5.
' Unit Reserve Shutdown' Hours J
0.0 0.0 0.0 4
6.
Not Electrical Energy Generated (MWh)?
895,656 4,129,989 90,333,257 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action 1
Hours Reason 2 Reactor 8 No.
Date Type to Prevent Occurrence No reactor shutdowns occurred during the month of June 1998.
1F-Forced 2Reason:
8Method:
S-Scheduled A-Equipment Failure (Explain) 1 Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
a
1 NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
50-529
. UNIT NAME:
PVNGS-2 DATE:
7/10/98 COMPLETED BY:
J. D. Fulton TELEPHONE:
(602) 250-3549 R: porting Period:
June 1998 1.
Design Electrical Rating (Net MWe):
1265 2.
Maximum Dependable Capacity (Net MWe):
1243 YUnit 2' Generating' Statistics"
'; This Month '
i r.to Dati
- Cumulative Y
5 3.
Hours Remotorwas Critical 720.0 4,344.0 77,769.7 4.
Hours Generator'wes Ondine'
- 720.0 4,344.0 76,576.8 5.
' Unit Reserve Shutdown Hours [ '
~ '
0.0 0.0 0.0 6.
Not Electrical Energy Generated (MWh)
- 909,478 5,514,151 91,943,710 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action N.
Date Typet Hours Reason 2 Reactor 8 to Prevent Occurrence No reactor shutdowns occurred during the month of June 1998.
2 F Forced Reason:
3Method:
S-Scheduled A Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain) t
SUMMARY
t i
l L.
NRC MONTHLY OPERATING DATA REPORT i
l DOCKET NO.:
50-528 UNIT NAME:,
PVNGS-1 DATE:
7/10/98
!. COMPLETED BY:
J. D. Fulton TELEPHONE:
(602) 250-3549 Reporting Period:
June 1998 1.
Design Electrical Rating (Net MWe):
1265 2.
Maximum Dependable Capacity (Net MWe):
1243 1 ? nit 1 Mlne Statisticsi ^ '
rThis MontO Nr.td Date CumulatiYe' U
3.
'Hodre Robtor w'as CN ' /
~ '
720.0 3,456.9 77,453.2 4.
Hours Generator waE Ond.ine
- N 720.0 3,403.5 76,214.6
~
5.
Unit Reserve Shutdown Hou's 4
- 'M 0.0 0.0 0.0 r
6.
'Not Electrical Energy Generated (MWhI -
895,656 4,129,989 90,333,257
~
UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No.
Date Typei
. Hours Reasoria Reactor 3 to Prevent Occurrence No reactor shutdowns occurred during the month of June 1998.
i
'F-Forced 2Reason:
8Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / Ucense Examination 5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
l.
l
~ - _
l NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
50-529 UNIT NAME:
PVNGS-2 DATE:
7/10/98 COMPLETED BY:
J. D. Fulton TELEPHONE:
(602) 250-3549 R: porting Period:
June 1998 1.
Design Electrical Rating (Net MWe):
1265
-2.
Maximum Dependable Capacity (Net MWe):
1243 J { UA 2' Generating SNsucs >
2This Month?
i-YitoDate LCumulatiN -
(
4 3.
Hours Reac$nr wes~ Critical,w P
720.0 4,344.0 77,769.7
- 4. -
' Hours Generator NOn-Linal 720.0 4,344.0 76,576.8 5.
U$lt Reserve SNbdo'wn Hours [ '
~
0.0 0.0 0.0 N$t Electbcal Energy Generated (MWhN ~
~
909,478 5,514,151 91,943,710 6.
UNIT SHUTDOWNS Outage Method of Duration Shutting Down No.
Date Type 1 Hours Reason 2 Reactor 3 '
Cause and Corrective Action to Prevent Occurrence
- No reactor shutdowns occurred during the month of June 1998.
'F-Forced' 2Reason:
8Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
50-528 UNIT NAME:
PVNGS-1 DATE:
7/10/98 COMPLETED BY:
J. D. Fulton TELEPHONE:
(602) 250-3549 R porting Period:
June 1998 1.
Design Electrical Rating (Net MWe):
1265 2.
Maximum Dependable Capacity (Net MWe):
1243
-Unit 1 Generating Statistics "This Month
-Yr. to Date'
' Cumulative 4
3.
' Hours' Reactor was Critidal !
^
720.0 3,456.9 77,453.2 4.
' Hours Genermtor wes'On-Line 2 720.0 3,403.5 76,214.6 5.
Unit Reserve Shutdown Hours '
0.0 0.0 0.0 6.
Not Electrical Energy Generated (MWh) '
895,656 4,129,989 90,333,2S7 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action 1
Hours Reason 2 Reactor 3 No.
Date Type to Prevent Occurrence No reactor shutdowns occurred during the month of June 1998.
'F-Forced -
2Reason:
8Method:
S-Scheduled A-Equipment Failure (Explain) 1 Manual B-Maintenance or Test 2-Manuai Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)
F-Administrative G. Operational Error (Explain)
H-Other (Explain)
SUMMARY
i NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
50-529 UNIT NAME:
PVNGS-2 i
DATE:
7/10/98 COMPLETED BY:
J. D. Fulton TELEPHONE:
(602) 250-3549 -
R: porting Period:
June 1998 1:
Design Electrical Rating (Net MWe):
1265 2.
Maximum Dependable Capacity (Net MWe):
1243
-i,' ' W/::dE2' h k W ')
iTbis b J r. $ w
- C'u m l M '
7 Y
s wx
- c..
3.
Hours Reactor was" Critical 9
720.0 4,344.0 77,769.7 4.
'Hoh GeneratNwas On LIAe?
% ry 720.0 4,344.0 76,576.8
^
5.
Unit O'sinstdewN M
~
0.0 0.0 0.0
-m a 6.
Not Electrical Energy Generated (MWh);..
m 909,478 5,514,151 91,943,710 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No.
Date Typel Hours Reason 2 Reactor 3 to Prevent Occurrence No reactor shutdowns occurred during the month of June 1998.
F-Forced 2Reason:
8Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E Operator Training / License Examination 5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
2-
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.:
50-528 UNIT NAME:
PVNGS-1 DATE:
7/10/98 COMPLETED BY:
J. D. Fulton TELEPHONE:
(602) 250-3549 Reporting Period:
June 1998 j
1.
Design Electrical Rating (Net MWe):
1265 2.
Maximum Dependable Capacity (Net MWe):
1243
' T unit 1 Generating Statistical
- Thin ' Month -
I r.to Date :
$ Cumulative" Y
+
3.
Hours Reactorwas Critical 720.0 3,456.9 77,453.2 4.
Houd Generator was Ordine' 720.0 3,403.5 76,214.6 5.
Unit' Reserve Shutdown Hoursi >
0.0 0.0 0.0 6.
Nok Electricai Energy Generated'(MWhh 895,656 4,129,989 90,333,257 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action i
Hours Reason 2 Reactors to Prevent Occurrence No.
Date Tyoe N a reactor shu' downs occurred during the month of June 1998.
8
'F-Forced 2Reason:
Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuatbn E-Operator Training / License Examination 5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain) l
SUMMARY
i 1
I
E 1
t i
=0 NRC MONTHLY OPERATING DATA REPORT l
DOCKET NO.:
52:522 UNIT NAME:
PVNGS-2
- DATE:
7/10/98 l COMPLETED BY:
J. D. Fulton TELEPHONE:
(602) 250-3549 Reporting Period:
June 1998 i
1.
Design Electrical Rating (Net MWe):
1265 l
2.
Maximum Dependable Capacity (Net MWe):
1243
' Unit 2 ' Generating Stetistics ? '
~
'This Mbnth '
fYbt$Date
- Cumulistive" i
l 3.
Aours Reactorwas Critical 720.0 4,344.0 77,763.7 4.
Hours Generator w' h Ond.ine :
720.0 4,344.0 76,576.8
~
e 5.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
~~
l 6.
Not Electrical Energy Generated (MWh).
909,478 5,514,151 91,943,710 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action 1
Hours Reason 2 Reactor 3 to Prevent Occurrence No.
Date Type
- No reactor shutdowns occurred during the month of June 1998.
l 2
8 1F-Forced Reason:
Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram i
. D-Regulatory Restriction 4-Continuation E-Operator Training / Ucense Examination 5-Other-(Explain)
F-Administrative l
G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
-e 2
i l