ML19309C961

From kanterella
Revision as of 22:39, 28 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-010/03L-0
ML19309C961
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/03/1980
From: Calhoun J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309C963 List:
References
NUDOCS 8004090429
Download: ML19309C961 (1)


Text

o

/

o TENNESSEE VALLEY AUTHCRITY w arresocos Tr .csscr n ao:

716 Edney Building APR 03 1980 Mr. James P. O'Railly, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 1 - DOCKET NO. 50-327 - PACILITY OPERATING LICENSE DPR REPORTABLE OCCURRENCE REPORT SQRO-50-327/8010 The enclosed report providea details concerning the failure of gaseous vent flow rate monitors 1-FE-30-242, 2-FE-30-242, and 0-FE-30-174. This report is submitted in accordance with Sequoyah unit 1 Terhaf r=1_

Specification 6.9.1.13.b.

-

Very truly yours, TENNESSEE VALLEY AUTHORITY i

J. R. Calhoun Director of Nuclear Power 1

i Enclosure (3) l cc (Enclosure).

Director (3)  ;

Office of Management Information and Program Control j U.S. Nuclear Regulatory Commission i Washington, DC 20555 / l Director (40)

Office of Inspection and Enforcement U.S. Nuclear Reguistory Commaission Washington, DC 20555 Mr. Bill Lavallee Nuclear Safety Analysis Center Palo Alto, California 94303 I Mr. W. T. Cottle, NRC Inspector, Sequoyah pod 3

/ /

8094090427 3