Inservice Inspection Owner'S Activity Report (Form OAR-1), Refueling Outage S1R21, Second Period of the Fourth Ten-Year ISI Interval
ML080640657
Person / Time
Site: Surry Dominion icon.png
Issue date: 02/22/2008
From: Adams W
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
08-0073
Download: ML080640657 (7)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 22,2008 U.S. Nuclear Regulatory Commission Serial No.: 08-0073 Attention: Document Control Desk S&L/TJN: R2 Washington, D.C. 20555 Docket No.: 50-280 License No.: DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

SURRY POWER STATION UNIT 1 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT As allowed by ASME Code Case N-532-4, "Repair/ Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Section Xl, Division 1," the Form OAR-1 for Surry Unit 1 refueling outage S1 R21 is enclosed. This document contains in Tables 1 and 2 the reporting requirements for the second period of the fourth ten-year inservice inspection interval for Surry Unit 1 from May 27, 2006 through the duration of the S1 R21 refueling outage that was completed on December 1, 2007. The second period ends on October 13, 2010.

This document also contains in Table 3 the reporting requirements for the first period of the fourth ten-year inservice inspection interval for Surry Unit 1 from December 4, 2004 through the duration of the S1R20 refueling outage that was completed on May 27, 2006. The first period ended on October 13, 2006. Due to an administrative error, Table 3 was inadvertently omitted from the previous Surry Unit 1 OAR-1 submittal letter dated August 18, 2006. The previous Surry Unit 1 Form OAR-1 was submitted as allowed by ASME Code Case N-532-1 "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission,Section XI, Division 1".

Should you have any questions regarding this submittal, please contact Mr. Trace Niemi at (757) 365-2848.

Ve* 'trulyur W. at- Adams Director Nuclear Station (S&L)

Surry Power Station Commitments made in this letter: None

Attachment:

1. Owner's Activity Report (Form OAR-i), Surry Unit 1 Refueling Outage S1R21, Second Period of the Fourth Ten-Year ISI Interval A

Serial No.08-0073 Docket No. 50-280 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23 T85 Atlanta, Georgia 30303 NRC Senior Resident Inspector Surry Power Station Mr. S. P. Lingam NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop 8 G9A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Mr. R. A. Jervey NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop 8 G9A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station

Serial No.08-0073 Docket No. 50-280 Attachment Owner's Activity Report (Form OAR-i)

Surry Unit 1 Refueling Outage S1R21 Second Period of the Fourth Ten-Year ISI Interval Virginia Electric and Power Company (Dominion)

SURRY POWER STATION, SI R21 OUTAGE FORM OAR-I OWNER'S ACTIVITY REPORT Report Number: 1-4-2-1 (Unit 1 4th Interval 2`6 Pprind 1 st Report)

Plant: Surry Power Station, 5570 Hog Island Rd, Surry, VA 23883 Unit No. 1 Commercial service date 12/22/72 Refueling outage no. Si R21 Current inspection interval ath

,~nd Current inspection period Edition and Addenda of Section Xl applicable to the inspection plans 1998 Edition through 2000 Addendum Date and revision of inspection plans Surry Unit 1 4 Interval ISI Plan Revision 4, February 2008 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans. N/A Code Cases used: N-532-4 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this Report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluation supporting the completion of S1 R21 conform to the requirements of Section XI.

Sig ~j~Z 6 4 oi~Je~~ Date 2 g I ttle)

Ues*gnee, Owner's or

/(Owner's

.- (wners o Ownrs esignee, Title)

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virginia and employed by H.S.B. - CT of Hatford. CT have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XA.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacements activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

___-______-__ Commissions VA 883(R)

IJ Inspector's Signature National Board, State, Province, and Endorsements Date //,6/0

SURRY POWER STATION Si R21 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Item Description Evaluation Description number None

SURRY POWER STATION

$1R21 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE R/R Plan #

Code Item Description Description of Work Date Completed Class 3 01-SW-646 Replace Piping 11/11/2006 2006-425 3 01-SW-757 Replace 2" Pipe 11/17/2006 2006-466 1 01-CH-LCV-1460A Replace Fasteners 11/03/2007 2007-231 1 01-CH-LCV-1460B Replace Fasteners 11/05/2007 2007-237 Remove ISI Indications 2 01-RH-E-1A Buff or Grind 11/10/2007 2007-263 Repair Indication at weld 2 01-RH-E-1B 1 -B02 11/12/2007 2007-279 2 01-RH-E-1B Weld Repairs 11/12/2007 2007-274 2 01-RH-E-1B Repair Indications 11/11/2007 2007-270 01 -SI-PP-2.00-SI- Repair Indication at weld 2 PIPE-81-1502 7-01BC 11/12/2007 2007-281 2 01-RH-E-1A Weld Repairs 11/13/2007 2007-271 01-CS-PP-10.00-2 CS-PIPE-4-153 Remove Indications 11/16/2007 2007-286 01-CW-PP-96.00-3 WC-PIPE-4-10 Weld Repairs 11/21/2007 2007-241 1 01-SS-PP-0.38-SS Replace Tubing 11/19/2007 2007-236

  • 2 01 -SI-FT-1 940A Weld Repair 07/14/2006 2006-205
  • 2 01-CH-TIC-1109 Replace Fasteners 10/10/2006 2006-340 3 01-VS-YS-1D Replace Component 10/23/2006 2006-318 3 01 -SW-756 Replace Valve 12/16/2006 2006-476 Note: All Section XI Repair/Replacement work performed during the 4 th Interval from 05/27/06 to 12/01/07 was reviewed for applicability to this Table.
  • No ANII involvement required per IWA-4131.2(a)

SURRY POWER STATION S1R20 OUTAGE**

FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Condition' Found During Repair, Scheduled Replacement, Section X1 R/R Plan Code or Corrective Item Description Description of Work Examination Date #

Class Measure or Completed, Test (Yes or No) 3 Corrective 1 1/2"WS-450-21X, Install Clamp No 08/22/05 05-266 Measure Pipe 3 Replacement 1-SW-896 Replace Valve No 09/07/05 05-268 3 Replacement 1 '2"WS-450-21X, Replace Piping No 08/23/05 05-269 Pipe 3 Replacement 1-SW-573 Replace Fitting No 10/21/05 05-303 3 Repair 8"-WS-466-151, Weld Repair No 09/06/05 05-272 Pipe 3 Repair 1-FC-41 Weld Repair No 04/11/06 06-115 2 Replacement 1-CH-98 Replace Bonnet No 05/01/06 06-152 2 Repair 01-RH-PP-0.75- Repair Weld No 05/03/06 06-146*

RH-PIPE 2 Repair 1-SI-ICV-3546 Replace Valve and No 05/03/06 06-145*

Tubing Note: All Section XI Repair/Replacement work performed during the 4th Interval from 12/04/04 to 5/27/06 was reviewed for applicability to this Table.

  • No ANII involvement required per IWA-4131.2(a).
    • Note: that this attachment pertains to S1 R20 Outage Form OAR-1 Activity Report.