Similar Documents at Surry |
---|
Category:Graphics incl Charts and Tables
MONTHYEARML20332A1592020-12-0707 December 2020 Documentation of Completion of Required Actions Taken in Response to Lessons Learned from the Fukushima Dai-Ichi Accident ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML17213A0802017-07-28028 July 2017 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules ML16130A5642016-05-0202 May 2016 NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML16049A5422016-03-0101 March 2016 Tables 1 and 2 ML12124A2972010-03-11011 March 2010 Soarca Documents Review/Approval Process ML0806406572008-02-22022 February 2008 Inservice Inspection Owner'S Activity Report (Form OAR-1), Refueling Outage S1R21, Second Period of the Fourth Ten-Year ISI Interval ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0722801962007-08-10010 August 2007 Response to Request for Additional Information 2006 Steam Generator Inservice Inspection Reports ML0609500942006-04-0303 April 2006 North Anna Units 1 and 2, and Surry Units 1 and 2, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power ML0508804122005-03-23023 March 2005 Virginia Electric and Power Company Surry Power Station Unit 2, ASME Section XI Fourth Inservice Inspection (ISI) Interval Update, Risk Informed Inservice Inspection (RI-ISI) Program, Response to NRC Request for Additional Information ML0501802572005-01-13013 January 2005 Stations Units 1 & 2, Millstone Power Station Units 2 & 3, Request for Approval of Appendix B of Topical Report DOM-NAF-2, Qualification of Westinghouse WRB-1 CHF Correlation in the Dominion VIPRE-D Computer Code. ML0501202612005-01-12012 January 2005 December Monthly Report on the Status of Open TIAs Assigned to NRR ML0434802422004-12-29029 December 2004 November Monthly Report on the Status of Open TIAs Assigned to NRR ML0501903172004-12-17017 December 2004 Virginia Electric and Power Company Surry Power Station Units 1 and 2 - Proposed Technical Specifications Change Request for Reactor Coolant System Pressure/Temperature Limits. Ltops Setpoint, and Ltops Enable Temperature with Exemption. ML0424700192004-08-24024 August 2004 Attachment 4 - Table of Where ANSI N18.7 Requirements Are Addressed by NQA-1-1994 Standards And/Or the New QA Topical Report ML0312902322003-05-0808 May 2003 Graph Emergency Diesel Fuel Oil Consumption ML19093B1121978-07-14014 July 1978 Response to Concerns Use of a Certain Type Cable Manufactured by the Continental Wire and Cable Company ML19093B0681978-04-28028 April 1978 Response to Letter of 03/16/1978 Which Requested Certain Information Regarding 11/22/1977 Submittal for Permanent Solution of Low Head Safety Injection & Recirculation Spray Pumps Net Positive Suction Head Problems ML19093B0691978-04-26026 April 1978 Purpose of Letter to Present the Surry Unit No.1 Steam Generator Surveillance Program for the Outage Which Began on 04/22/1978 ML19093B0721978-04-17017 April 1978 Vepco Is Pleased to Provide Attached Responses to Request for Additional Information Dated March 16, 1978. Submittal Contains Program Description for Monitoring Fish Populations in James River Near Power Station ML19093B0201978-02-22022 February 1978 Response to 02/02/78 Letter Possibility That Reactor Cavity Annulus Seal Ring or Associated Biological Shielding Could Become Missiles in Event of Loss of Coolant Accident Pipe... ML19093B0241978-01-23023 January 1978 Response to a Request of 05/18/1977 for Additional Information on the Reactor Vessel Material Surveillance Program ML19093A1511977-12-31031 December 1977 Annual Operating Report 1977, Volume 4 ML19093B0661977-12-14014 December 1977 Forwarding Table 4.3-2, Which Was Omitted from Revision 1 to Steam Generator Program, Surry Power Station, Unit Nos. 1 & 2, Submitted on 12/2/1977, Serial No. 532 ML19093B0671977-12-14014 December 1977 Letter to Inform of a Delay in Final Installation of Reactor Coolant System Overpressure Protection System ML19093B0331977-11-30030 November 1977 Enclosed Justification for Tube Inspection Program & Plugging Criteria, Results of Completed Surry Unit No. 1 Inspection Program with Small Change in Denting ML19093A9811977-10-31031 October 1977 Purpose of the Letter Is to Present the Surry Unit No. 1 Steam Generator Surveillance Program for the Forthcoming Outage ML19094A5601977-09-26026 September 1977 09/26/1977 Letter Proposed Design Change to Allow the Lhsi Discharge Valves to Be Remotely Throttled from the Control Room ML19093A9871977-09-26026 September 1977 a Submission of a Proposed Design Change Which Allows the Lhsi Discharge Valves to Be Remotely Throttled from Control Room. Provides Completed Description of Tests Along with Evaluation of Results ML19093B0081977-08-29029 August 1977 Informs of Necessary Change to Operating Procedures to Require Throttling Lhsi Pump Discharge Valves During Recirculation Mode of Pump Operation in Order to Assure That Lhsi Pump Cavitation Does Not Occur During ... ML19098B4841977-07-0808 July 1977 Forwarding Corrected Pages to 1976 Annual Operating Report ML19098B4441977-06-28028 June 1977 Provide Requested Information Relative to Site Settlement to Close Previously Unresolved Item Identified as 76-15/1, Site Settlement Surveillance ML19098B4411977-06-0202 June 1977 Response to Letter of 4/13/1977, Provide Requested Information Regarding Iodine Spiking ML19098B4241977-04-15015 April 1977 Furnishing Information to Present Unit 1 Steam Generator Surveillance Program for Present Outage ML19094A7491976-07-0101 July 1976 Submits a Copy of the Supplement to Surry Unit Nos. 1 & 2 Startup Reports Dated 05/01 & 07/31/1973 Respectively ML19093B3531975-08-12012 August 1975 Response to Requested for Reasons of Surry Power Technical Specification TS 4.14.A.1 Be Waived on an Interim Basis Until 12:00 PM 09/20/1975 ML19098B3051975-07-23023 July 1975 5/13/1975 Summary of Meeting with NRC Staff, VEPCO, & Stone & Webster Corp to Discuss Possibility of Differential Settlement for Major Safety Related Structures ML19098B3071975-07-18018 July 1975 Confirming Vepco'S Plan to Conduct Large Load Reduction Test on Unit 2, on Tentative Date of 8/2/1975, as Discussed in Meeting of 7/9/1975 ML19093B3351975-05-16016 May 1975 Refers to Letter of 01/17/1975 Which Advised Replacement of Certain Water Temperature Monitoring Equipment at Station & Informing VEPCO of a Purchased & Installed New Monitoring System to Comply with Provisions ML19093B3361975-02-0303 February 1975 Confirms a Report of a Fish Impingement Incident Which Occurred on 01/28/1975 Reported to Paul Leech of Staff by John White of VEPCO on 01/19/1975 2020-07-20
[Table view] Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23244A0142023-08-30030 August 2023 Inservice Inspection Owners Activity Report ML23073A1822023-03-14014 March 2023 Inservice Inspection Owners Activity Report (OAR) ML22108A2242022-04-14014 April 2022 Steam Generator Tube Inspection Report for the Fall 2021 Refueling Outage ML22048B8192022-02-17017 February 2022 Inservice Inspection Owners Activity Report (OAR) ML21243A3132021-08-27027 August 2021 Steam Generating Tube Inspection Report for the Spring 2021 Refueling Outage ML21235A0912021-08-23023 August 2021 Inservice Inspection Owners Activity Report Ended on June 1, 2021 ML20304A1542020-08-25025 August 2020 Inservice Inspection Owner'S Activity Report ML20101H3072020-03-26026 March 2020 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML20087H0092020-03-11011 March 2020 Steam Generator Tube Inspection Report for the Fall 2019 Refueling Outage ML20136A2532020-02-18018 February 2020 Submittal of Inservice Inspection Owner'S Activity Report for Surry Unit 1 Refueling Outgae s1R29 Which Ended on 11/29/2019 ML19331A9162019-11-27027 November 2019 ASME Section XI Inservice Inspection Program Proposed Alternative Request S2-15-ISI-05 to Use a Mechanical Clamping Device for a One-Inch Main Steam Line Pipe Repair ML19071A1072019-03-0404 March 2019 Inservice Inspection Owner'S Activity Report ML18331A1622018-11-19019 November 2018 Steam Generator Tube Inspection Report for the Spring 2018 Refueling Outage ML18229A0622018-08-10010 August 2018 Inservice Inspection Owner'S Activity Report ML17251A8952017-08-31031 August 2017 Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer Response to Request for Additional Information ML17261A1872017-08-29029 August 2017 Inservice Inspection Owner'S Activity Report ML17121A3782017-04-24024 April 2017 Submittal of Steam Generator Tube Inspection Report for the Fall 2016 Refueling Outage ML17040A4072017-02-0606 February 2017 Inservice Inspection Owner'S Activity Report 1-5-1-2, for Refueling Outage S1R27, First Period of the Fifth ISI Interval ML16355A3462016-12-14014 December 2016 Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(Z)(1) ML16141A1172016-05-10010 May 2016 Inspection Report for the Fall 2015 Refueling Outage ML16131A6352016-05-0505 May 2016 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Preformed in the Fourth 10-Year Insevice Inspection Interval ML16081A1672016-03-0101 March 2016 Inservice Inspection Owner'S Activity Report ML15324A0142015-11-0606 November 2015 Steam Generator Tube Inspection Report for the Spring 2015 Refueling Outage ML15293A1242015-10-0909 October 2015 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML15224B3602015-07-31031 July 2015 Inservice Inspection Owner'S Activity Report (OAR) ML14335A6062014-11-19019 November 2014 Response to Request for Additional Information Re 2013 Steam Generator Inservice Inspection Report ML14294A4492014-10-16016 October 2014 Steam Generator Tube Inservice Inspection Report for the Spring 2014 Refueling Outage ML14216A3452014-07-24024 July 2014 Inservice Inspection Owner'S Activity Report ML14133A0062014-05-0707 May 2014 Fifth 10-Year Interval Inservice Inspection Program and Alternative Requests ML14135A3652014-05-0606 May 2014 Steam Generator Tube Inspection Report for the Fall 2013 Refueling Outage ML14056A1942014-02-18018 February 2014 Inservice Inspection Owner'S Activity Report ML13336A1422013-11-26026 November 2013 Fifth 10-Year Interval Inservice Inspection Program and Alternative Requests ML13149A2292013-05-10010 May 2013 Steam Generator Tube Inservice Inspection Report for the Fall 2012 Refueling Outage ML13128A1042013-05-0101 May 2013 Inservice Testing Program for Pumps and Valves Fifth Ten Year Interval Update and Associated Relief Requests ML13056A4122013-02-15015 February 2013 Inservice Inspection Owner'S Activity Report (OAR) ML12321A0472012-10-30030 October 2012 Steam Generator Tube Inservice Inspection Report for the Spring 2012 Refueling Outage ML12242A3472012-08-16016 August 2012 Inservice Inspection Owner'S Activity Report (OAR) ML11291A0582011-10-0505 October 2011 Steam Generator Tube Inservice Inspection Report for the 2011 Refueling Outrage ML11264A0362011-09-0606 September 2011 Inservice Inspection Owner'S Activity Report (OAR) ML11154A1012011-05-24024 May 2011 Steam Generator Tube Inservice Inspection Report for the 2010 Refueling Outage ML1130802582011-02-21021 February 2011 Inservice Inspection Owner'S Activity Report ML1015305332010-05-24024 May 2010 Steam Generator Tube Inservice Inspection Report for 2009 Refueling Outage ML1006804222010-02-25025 February 2010 Inservice Inspection Owner'S Activity Report (OAR) ML0932002072009-11-0404 November 2009 Steam Generator Tube Inservice Inspection Report for 2009 Refueling Outage ML0923002302009-08-0707 August 2009 Inservice Inspection Owner'S Activity Report ML0900601112008-11-14014 November 2008 Steam Generator Tube Inservice Inspection Report for the 2008 Refueling Outage 2024-07-08
[Table view] Category:Letter
MONTHYEARML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 And Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 2024-09-03
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 22,2008 U.S. Nuclear Regulatory Commission Serial No.: 08-0073 Attention: Document Control Desk S&L/TJN: R2 Washington, D.C. 20555 Docket No.: 50-280 License No.: DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
SURRY POWER STATION UNIT 1 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT As allowed by ASME Code Case N-532-4, "Repair/ Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Section Xl, Division 1," the Form OAR-1 for Surry Unit 1 refueling outage S1 R21 is enclosed. This document contains in Tables 1 and 2 the reporting requirements for the second period of the fourth ten-year inservice inspection interval for Surry Unit 1 from May 27, 2006 through the duration of the S1 R21 refueling outage that was completed on December 1, 2007. The second period ends on October 13, 2010.
This document also contains in Table 3 the reporting requirements for the first period of the fourth ten-year inservice inspection interval for Surry Unit 1 from December 4, 2004 through the duration of the S1R20 refueling outage that was completed on May 27, 2006. The first period ended on October 13, 2006. Due to an administrative error, Table 3 was inadvertently omitted from the previous Surry Unit 1 OAR-1 submittal letter dated August 18, 2006. The previous Surry Unit 1 Form OAR-1 was submitted as allowed by ASME Code Case N-532-1 "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission,Section XI, Division 1".
Should you have any questions regarding this submittal, please contact Mr. Trace Niemi at (757) 365-2848.
Ve* 'trulyur W. at- Adams Director Nuclear Station (S&L)
Surry Power Station Commitments made in this letter: None
Attachment:
- 1. Owner's Activity Report (Form OAR-i), Surry Unit 1 Refueling Outage S1R21, Second Period of the Fourth Ten-Year ISI Interval A
Serial No.08-0073 Docket No. 50-280 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23 T85 Atlanta, Georgia 30303 NRC Senior Resident Inspector Surry Power Station Mr. S. P. Lingam NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop 8 G9A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Mr. R. A. Jervey NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop 8 G9A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station
Serial No.08-0073 Docket No. 50-280 Attachment Owner's Activity Report (Form OAR-i)
Surry Unit 1 Refueling Outage S1R21 Second Period of the Fourth Ten-Year ISI Interval Virginia Electric and Power Company (Dominion)
SURRY POWER STATION, SI R21 OUTAGE FORM OAR-I OWNER'S ACTIVITY REPORT Report Number: 1-4-2-1 (Unit 1 4th Interval 2`6 Pprind 1 st Report)
Plant: Surry Power Station, 5570 Hog Island Rd, Surry, VA 23883 Unit No. 1 Commercial service date 12/22/72 Refueling outage no. Si R21 Current inspection interval ath
,~nd Current inspection period Edition and Addenda of Section Xl applicable to the inspection plans 1998 Edition through 2000 Addendum Date and revision of inspection plans Surry Unit 1 4 Interval ISI Plan Revision 4, February 2008 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans. N/A Code Cases used: N-532-4 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this Report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluation supporting the completion of S1 R21 conform to the requirements of Section XI.
Sig ~j~Z 6 4 oi~Je~~ Date 2 g I ttle)
Ues*gnee, Owner's or
/(Owner's
.- (wners o Ownrs esignee, Title)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virginia and employed by H.S.B. - CT of Hatford. CT have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XA.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacements activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
___-______-__ Commissions VA 883(R)
IJ Inspector's Signature National Board, State, Province, and Endorsements Date //,6/0
SURRY POWER STATION Si R21 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Item Description Evaluation Description number None
SURRY POWER STATION
$1R21 OUTAGE FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE R/R Plan #
Code Item Description Description of Work Date Completed Class 3 01-SW-646 Replace Piping 11/11/2006 2006-425 3 01-SW-757 Replace 2" Pipe 11/17/2006 2006-466 1 01-CH-LCV-1460A Replace Fasteners 11/03/2007 2007-231 1 01-CH-LCV-1460B Replace Fasteners 11/05/2007 2007-237 Remove ISI Indications 2 01-RH-E-1A Buff or Grind 11/10/2007 2007-263 Repair Indication at weld 2 01-RH-E-1B 1 -B02 11/12/2007 2007-279 2 01-RH-E-1B Weld Repairs 11/12/2007 2007-274 2 01-RH-E-1B Repair Indications 11/11/2007 2007-270 01 -SI-PP-2.00-SI- Repair Indication at weld 2 PIPE-81-1502 7-01BC 11/12/2007 2007-281 2 01-RH-E-1A Weld Repairs 11/13/2007 2007-271 01-CS-PP-10.00-2 CS-PIPE-4-153 Remove Indications 11/16/2007 2007-286 01-CW-PP-96.00-3 WC-PIPE-4-10 Weld Repairs 11/21/2007 2007-241 1 01-SS-PP-0.38-SS Replace Tubing 11/19/2007 2007-236
- 2 01 -SI-FT-1 940A Weld Repair 07/14/2006 2006-205
- 2 01-CH-TIC-1109 Replace Fasteners 10/10/2006 2006-340 3 01-VS-YS-1D Replace Component 10/23/2006 2006-318 3 01 -SW-756 Replace Valve 12/16/2006 2006-476 Note: All Section XI Repair/Replacement work performed during the 4 th Interval from 05/27/06 to 12/01/07 was reviewed for applicability to this Table.
- No ANII involvement required per IWA-4131.2(a)
SURRY POWER STATION S1R20 OUTAGE**
FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Condition' Found During Repair, Scheduled Replacement, Section X1 R/R Plan Code or Corrective Item Description Description of Work Examination Date #
Class Measure or Completed, Test (Yes or No) 3 Corrective 1 1/2"WS-450-21X, Install Clamp No 08/22/05 05-266 Measure Pipe 3 Replacement 1-SW-896 Replace Valve No 09/07/05 05-268 3 Replacement 1 '2"WS-450-21X, Replace Piping No 08/23/05 05-269 Pipe 3 Replacement 1-SW-573 Replace Fitting No 10/21/05 05-303 3 Repair 8"-WS-466-151, Weld Repair No 09/06/05 05-272 Pipe 3 Repair 1-FC-41 Weld Repair No 04/11/06 06-115 2 Replacement 1-CH-98 Replace Bonnet No 05/01/06 06-152 2 Repair 01-RH-PP-0.75- Repair Weld No 05/03/06 06-146*
RH-PIPE 2 Repair 1-SI-ICV-3546 Replace Valve and No 05/03/06 06-145*
Tubing Note: All Section XI Repair/Replacement work performed during the 4th Interval from 12/04/04 to 5/27/06 was reviewed for applicability to this Table.
- No ANII involvement required per IWA-4131.2(a).
- Note: that this attachment pertains to S1 R20 Outage Form OAR-1 Activity Report.