Issue date | Title | Topic | |
---|---|---|---|
ML20332A159 | 7 December 2020 | Documentation of Completion of Required Actions Taken in Response to Lessons Learned from the Fukushima Dai-Ichi Accident | Unanalyzed Condition Ultimate heat sink Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Backfit |
ML20203M160 | 20 July 2020 | VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status | Anchor Darling |
ML17213A080 | 28 July 2017 | Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules | |
ML16130A564 | 2 May 2016 | NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals | Open Phase Condition Fuel cladding |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
ML16049A542 | 1 March 2016 | Tables 1 and 2 | |
ML12124A297 | 11 March 2010 | Soarca Documents Review/Approval Process | |
ML080640657 | 22 February 2008 | Inservice Inspection Owner'S Activity Report (Form OAR-1), Refueling Outage S1R21, Second Period of the Fourth Ten-Year ISI Interval | |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML072280196 | 10 August 2007 | Response to Request for Additional Information 2006 Steam Generator Inservice Inspection Reports | Nondestructive Examination |
ML060950094 | 3 April 2006 | North Anna Units 1 and 2, and Surry Units 1 and 2, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power | Safe Shutdown High winds Probabilistic Risk Assessment Reserve Station Service Transformer Contingency analyzer Earthquake Maintenance Rule Program |
ML050880412 | 23 March 2005 | Virginia Electric and Power Company Surry Power Station Unit 2, ASME Section XI Fourth Inservice Inspection (ISI) Interval Update, Risk Informed Inservice Inspection (RI-ISI) Program, Response to NRC Request for Additional Information | Boric Acid Probabilistic Risk Assessment VT-2 Large early release frequency |
ML050180257 | 13 January 2005 | Stations Units 1 & 2, Millstone Power Station Units 2 & 3, Request for Approval of Appendix B of Topical Report DOM-NAF-2, Qualification of Westinghouse WRB-1 CHF Correlation in the Dominion VIPRE-D Computer Code. | |
ML050120261 | 12 January 2005 | December Monthly Report on the Status of Open TIAs Assigned to NRR | Boric Acid |
ML043480242 | 29 December 2004 | November Monthly Report on the Status of Open TIAs Assigned to NRR | Boric Acid |
ML050190317 | 17 December 2004 | Virginia Electric and Power Company Surry Power Station Units 1 and 2 - Proposed Technical Specifications Change Request for Reactor Coolant System Pressure/Temperature Limits. Ltops Setpoint, and Ltops Enable Temperature with Exemption. | Anticipated operational occurrence Hydrostatic Exemption Request |
ML042470019 | 24 August 2004 | Attachment 4 - Table of Where ANSI N18.7 Requirements Are Addressed by NQA-1-1994 Standards And/Or the New QA Topical Report | Shutdown Margin Coatings Nondestructive Examination Temporary Modification |
ML031290232 | 8 May 2003 | Graph Emergency Diesel Fuel Oil Consumption | |
ML19093B112 | 14 July 1978 | Response to Concerns Use of a Certain Type Cable Manufactured by the Continental Wire and Cable Company | Boric Acid |
ML19093B068 | 28 April 1978 | Response to Letter of 03/16/1978 Which Requested Certain Information Regarding 11/22/1977 Submittal for Permanent Solution of Low Head Safety Injection & Recirculation Spray Pumps Net Positive Suction Head Problems | |
ML19093B069 | 26 April 1978 | Purpose of Letter to Present the Surry Unit No.1 Steam Generator Surveillance Program for the Outage Which Began on 04/22/1978 | |
ML19093B072 | 17 April 1978 | Vepco Is Pleased to Provide Attached Responses to Request for Additional Information Dated March 16, 1978. Submittal Contains Program Description for Monitoring Fish Populations in James River Near Power Station | |
ML19093B020 | 22 February 1978 | Response to 02/02/78 Letter Possibility That Reactor Cavity Annulus Seal Ring or Associated Biological Shielding Could Become Missiles in Event of Loss of Coolant Accident Pipe... | |
ML19093B024 | 23 January 1978 | Response to a Request of 05/18/1977 for Additional Information on the Reactor Vessel Material Surveillance Program | |
ML19093A151 | 31 December 1977 | Annual Operating Report 1977, Volume 4 | |
ML19093B066 | 14 December 1977 | Forwarding Table 4.3-2, Which Was Omitted from Revision 1 to Steam Generator Program, Surry Power Station, Unit Nos. 1 & 2, Submitted on 12/2/1977, Serial No. 532 | |
ML19093B067 | 14 December 1977 | Letter to Inform of a Delay in Final Installation of Reactor Coolant System Overpressure Protection System | |
ML19093B033 | 30 November 1977 | Enclosed Justification for Tube Inspection Program & Plugging Criteria, Results of Completed Surry Unit No. 1 Inspection Program with Small Change in Denting | |
ML19093A981 | 31 October 1977 | Purpose of the Letter Is to Present the Surry Unit No. 1 Steam Generator Surveillance Program for the Forthcoming Outage | |
ML19094A560 | 26 September 1977 | 09/26/1977 Letter Proposed Design Change to Allow the Lhsi Discharge Valves to Be Remotely Throttled from the Control Room | |
ML19093A987 | 26 September 1977 | a Submission of a Proposed Design Change Which Allows the Lhsi Discharge Valves to Be Remotely Throttled from Control Room. Provides Completed Description of Tests Along with Evaluation of Results | |
ML19093B008 | 29 August 1977 | Informs of Necessary Change to Operating Procedures to Require Throttling Lhsi Pump Discharge Valves During Recirculation Mode of Pump Operation in Order to Assure That Lhsi Pump Cavitation Does Not Occur During ... | |
ML19098B484 | 8 July 1977 | Forwarding Corrected Pages to 1976 Annual Operating Report | |
ML19098B444 | 28 June 1977 | Provide Requested Information Relative to Site Settlement to Close Previously Unresolved Item Identified as 76-15/1, Site Settlement Surveillance | |
ML19098B441 | 2 June 1977 | Response to Letter of 4/13/1977, Provide Requested Information Regarding Iodine Spiking | |
ML19098B424 | 15 April 1977 | Furnishing Information to Present Unit 1 Steam Generator Surveillance Program for Present Outage | |
ML19094A749 | 1 July 1976 | Submits a Copy of the Supplement to Surry Unit Nos. 1 & 2 Startup Reports Dated 05/01 & 07/31/1973 Respectively | |
ML19093B353 | 12 August 1975 | Response to Requested for Reasons of Surry Power Technical Specification TS 4.14.A.1 Be Waived on an Interim Basis Until 12:00 PM 09/20/1975 | |
ML19098B305 | 23 July 1975 | 5/13/1975 Summary of Meeting with NRC Staff, VEPCO, & Stone & Webster Corp to Discuss Possibility of Differential Settlement for Major Safety Related Structures | |
ML19098B307 | 18 July 1975 | Confirming Vepco'S Plan to Conduct Large Load Reduction Test on Unit 2, on Tentative Date of 8/2/1975, as Discussed in Meeting of 7/9/1975 | |
ML19093B335 | 16 May 1975 | Refers to Letter of 01/17/1975 Which Advised Replacement of Certain Water Temperature Monitoring Equipment at Station & Informing VEPCO of a Purchased & Installed New Monitoring System to Comply with Provisions | |
ML19093B336 | 3 February 1975 | Confirms a Report of a Fish Impingement Incident Which Occurred on 01/28/1975 Reported to Paul Leech of Staff by John White of VEPCO on 01/19/1975 |