Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20332A1597 December 2020Documentation of Completion of Required Actions Taken in Response to Lessons Learned from the Fukushima Dai-Ichi AccidentUnanalyzed Condition
Ultimate heat sink
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Earthquake
Backfit
ML20203M16020 July 2020VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & StatusAnchor Darling
ML17213A08028 July 2017Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules
ML16130A5642 May 2016NRC Regulatory Issue Summary 2015-16 Planned Licensing Action SubmittalsOpen Phase Condition
Fuel cladding
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
ML16049A5421 March 2016Tables 1 and 2
ML12124A29711 March 2010Soarca Documents Review/Approval Process
ML08064065722 February 2008Inservice Inspection Owner'S Activity Report (Form OAR-1), Refueling Outage S1R21, Second Period of the Fourth Ten-Year ISI Interval
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
ML07228019610 August 2007Response to Request for Additional Information 2006 Steam Generator Inservice Inspection ReportsNondestructive Examination
ML0609500943 April 2006North Anna Units 1 and 2, and Surry Units 1 and 2, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite PowerSafe Shutdown
High winds
Probabilistic Risk Assessment
Reserve Station Service Transformer
Contingency analyzer
Earthquake
Maintenance Rule Program
ML05088041223 March 2005Virginia Electric and Power Company Surry Power Station Unit 2, ASME Section XI Fourth Inservice Inspection (ISI) Interval Update, Risk Informed Inservice Inspection (RI-ISI) Program, Response to NRC Request for Additional InformationBoric Acid
Probabilistic Risk Assessment
VT-2
Large early release frequency
ML05018025713 January 2005Stations Units 1 & 2, Millstone Power Station Units 2 & 3, Request for Approval of Appendix B of Topical Report DOM-NAF-2, Qualification of Westinghouse WRB-1 CHF Correlation in the Dominion VIPRE-D Computer Code.
ML05012026112 January 2005December Monthly Report on the Status of Open TIAs Assigned to NRRBoric Acid
ML04348024229 December 2004November Monthly Report on the Status of Open TIAs Assigned to NRRBoric Acid
ML05019031717 December 2004Virginia Electric and Power Company Surry Power Station Units 1 and 2 - Proposed Technical Specifications Change Request for Reactor Coolant System Pressure/Temperature Limits. Ltops Setpoint, and Ltops Enable Temperature with Exemption.Anticipated operational occurrence
Hydrostatic
Exemption Request
ML04247001924 August 2004Attachment 4 - Table of Where ANSI N18.7 Requirements Are Addressed by NQA-1-1994 Standards And/Or the New QA Topical ReportShutdown Margin
Coatings
Nondestructive Examination
Temporary Modification
ML0312902328 May 2003Graph Emergency Diesel Fuel Oil Consumption
ML19093B11214 July 1978Response to Concerns Use of a Certain Type Cable Manufactured by the Continental Wire and Cable CompanyBoric Acid
ML19093B06828 April 1978Response to Letter of 03/16/1978 Which Requested Certain Information Regarding 11/22/1977 Submittal for Permanent Solution of Low Head Safety Injection & Recirculation Spray Pumps Net Positive Suction Head Problems
ML19093B06926 April 1978Purpose of Letter to Present the Surry Unit No.1 Steam Generator Surveillance Program for the Outage Which Began on 04/22/1978
ML19093B07217 April 1978Vepco Is Pleased to Provide Attached Responses to Request for Additional Information Dated March 16, 1978. Submittal Contains Program Description for Monitoring Fish Populations in James River Near Power Station
ML19093B02022 February 1978Response to 02/02/78 Letter Possibility That Reactor Cavity Annulus Seal Ring or Associated Biological Shielding Could Become Missiles in Event of Loss of Coolant Accident Pipe...
ML19093B02423 January 1978Response to a Request of 05/18/1977 for Additional Information on the Reactor Vessel Material Surveillance Program
ML19093A15131 December 1977Annual Operating Report 1977, Volume 4
ML19093B06614 December 1977Forwarding Table 4.3-2, Which Was Omitted from Revision 1 to Steam Generator Program, Surry Power Station, Unit Nos. 1 & 2, Submitted on 12/2/1977, Serial No. 532
ML19093B06714 December 1977Letter to Inform of a Delay in Final Installation of Reactor Coolant System Overpressure Protection System
ML19093B03330 November 1977Enclosed Justification for Tube Inspection Program & Plugging Criteria, Results of Completed Surry Unit No. 1 Inspection Program with Small Change in Denting
ML19093A98131 October 1977Purpose of the Letter Is to Present the Surry Unit No. 1 Steam Generator Surveillance Program for the Forthcoming Outage
ML19094A56026 September 197709/26/1977 Letter Proposed Design Change to Allow the Lhsi Discharge Valves to Be Remotely Throttled from the Control Room
ML19093A98726 September 1977a Submission of a Proposed Design Change Which Allows the Lhsi Discharge Valves to Be Remotely Throttled from Control Room. Provides Completed Description of Tests Along with Evaluation of Results
ML19093B00829 August 1977Informs of Necessary Change to Operating Procedures to Require Throttling Lhsi Pump Discharge Valves During Recirculation Mode of Pump Operation in Order to Assure That Lhsi Pump Cavitation Does Not Occur During ...
ML19098B4848 July 1977Forwarding Corrected Pages to 1976 Annual Operating Report
ML19098B44428 June 1977Provide Requested Information Relative to Site Settlement to Close Previously Unresolved Item Identified as 76-15/1, Site Settlement Surveillance
ML19098B4412 June 1977Response to Letter of 4/13/1977, Provide Requested Information Regarding Iodine Spiking
ML19098B42415 April 1977Furnishing Information to Present Unit 1 Steam Generator Surveillance Program for Present Outage
ML19094A7491 July 1976Submits a Copy of the Supplement to Surry Unit Nos. 1 & 2 Startup Reports Dated 05/01 & 07/31/1973 Respectively
ML19093B35312 August 1975Response to Requested for Reasons of Surry Power Technical Specification TS 4.14.A.1 Be Waived on an Interim Basis Until 12:00 PM 09/20/1975
ML19098B30523 July 19755/13/1975 Summary of Meeting with NRC Staff, VEPCO, & Stone & Webster Corp to Discuss Possibility of Differential Settlement for Major Safety Related Structures
ML19098B30718 July 1975Confirming Vepco'S Plan to Conduct Large Load Reduction Test on Unit 2, on Tentative Date of 8/2/1975, as Discussed in Meeting of 7/9/1975
ML19093B33516 May 1975Refers to Letter of 01/17/1975 Which Advised Replacement of Certain Water Temperature Monitoring Equipment at Station & Informing VEPCO of a Purchased & Installed New Monitoring System to Comply with Provisions
ML19093B3363 February 1975Confirms a Report of a Fish Impingement Incident Which Occurred on 01/28/1975 Reported to Paul Leech of Staff by John White of VEPCO on 01/19/1975