Submittal of Inservice Inspection Owner'S Activity Report for Surry Unit 1 Refueling Outgae s1R29 Which Ended on 11/29/2019
ML20136A253
Person / Time
Site: Surry Dominion icon.png
Issue date: 02/18/2020
From: Denise Wilson
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
20-057
Download: ML20136A253 (6)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 H:l, l 8 2020 Serial No.20-057 SPS-LIC/JWD RO Docket No. 50-280 License No. DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT (OAR}

' \.

\ In accordance with the requirements of ASMI:: Code Case N-532-5, Virginia Electric and I

I. Power Company (Dominion Energy Virginia) hereby submits the lnservice Inspection Owner's Activity Report (Form OAR-1) for Surry Unit 1 refueling outage S1R29, which ended on November 29, 2019. This document contains the reporting requirements for the, second refueling outage of the second period in the fifth ten-year inservice inspection interval for Surry Unit 1.

If you have any questions concerning this information, please contact M~. Jacob Dietrich at (757) 365-2161.

Very truly yours, JJ_:_Jfv1- -

David Wilson Director Station Safety & Licensing Surry Power Station * *

Attachment:

Owneris Activity Report (Form OAR-1), Surry Unit 1 Refueling Outage S1 R29, Second Period of the Fifth ISi Interval Commitments made in this letter: None

Serial No.: 20-057 Docket No.: 50-280 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector Surry Power Station Mr. V. Thomas NRC Project Manager - Surry U. S. Nuclear Regulatory Commission

\

One White Flint North

\,, Mail Stop 08 G9A

'\ 11555 Rockville Pike

\._,

'*,\ Rockville, Maryland 20852-2738 Mr. E. Miller NRC Senior Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station

\_

I,__ ,

Serial No.: 20-057 Docket No.: 50-280 ATTACHMENT OWNER'S ACTIVITY REPORT {FORM OAR-1 ),

SURRY UNIT 1 REFUELING OUTAGE S1R29, SECOND PERIOD OF THE FIFTH ISi INTERVAL VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)

CASE CASES OF ASME BOILER AND PRESSURE VESSEL C:ODE N-532-5 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 1-5-2-2 (Unit 1. 5th Interval, 2nd Period. 2nd Report)

Plant Suny Power Station, 5570 Hog Island Road. Suny, VA 23883 Unit No. _ _ _ _-=_""'1~-:-:----- Commercial service date _ __..,,1=2~/2=2~/1=9'"'7"""2'--_ Refueling outage no. _ ____,,S=l"-'R,.,2"' (if applicable)

Current inspection period Edition and Addenda of Section XI applicable to the inspection plans Date and revision of inspection plans Surry Unit 1, 5th Interval ISI Plan, Revision 4 May, 2019 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used for inspection and evaluation: -~S=ee~Su=rry~U=n=i~t=1.~5=t=h~In~t~.=IS=I~P=la~n~.~R=ev~*-4~S=e=ct=i=on~6~fo=r~co~m=p=le=te~list~o~f=co=d=e~c=a=se=s~--

(if applicable, inducting cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE

\

I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the "i.\SME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 51R29 co}:Jform to the requirements of Se *on XI. (refueling outage number)

Sig~ed * . / ISI Progam Owner Date 2 /, 3,'2.02 O

\ wner's Designee, Title ---~-~-~--------------

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

/Y2 ~ Commissions _ _ _ _ _ _ _ _~NB=--_,_7=93=3"-'-"N.s=,c.eI=S,_;V,.,A_,,8=8=3{,..,.R,.,)_ _ _ _ _ _ __

~Signature National Board, State, Province, and Endorsements

/

\

Page 1 of1 *cASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-5 FORM OAR-1 OWNER'S ACTIVITY REPORT Table 1

.. Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item Description Evaluation Description Item Number None

Page 1 of 1 CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-5 FORM OAR-1 OWNER'S ACTIVITY REPORT Table 2 1 Abstract of Repair/replacement Activities Required fo~ Continued Service I

Code Class Item Description /Date Repair/Replacement Description of Work Comoleted Plan Number 1 01-RC-PP-2.00-RC-PlPE- Hanger 1 hardware, replacement of 11/23/2019 2019-132 200-1502 fasteners I

3 01-CC-E-1 C-HTEXCH Piping Replacement, through wall leak J1'26/2019 2019-135 I

I 3 01-CC-E-1 D-HTEXCH Piping replacement, through wall leak 11/21/2019

  • 2019-122 3 01-SW-PP-30.00-WS- Through wall indication directly 11/6/2019 2019-101

\

PIPE-24-10 upstream of 1-SW-MOV-103A inlet flange

\

I