VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 Juiy 31, 2015 United States Nuclear Regulatory Commission Serial No.15-373 Attention: Document Control Desk SPS-LIC/CGL R0 Washington, DC 20555-0001 Docket No. 50-280 License No. DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT (OAR)

In accordance with the requirements of ASME Code Case N-532-5, Virginia Electric and Power Company (Dominion) submits the Inservice Inspection (ISI) Owner's Activity Report (Form OAR-I) for the Surry Unit I refueling outage S1R26, which ended on May 27, 2015. This document addresses the reporting requirements for Surry Unit I for the portion of the third period in the fourth ten-year ISI interval from November 21, 2013 to October 13, 2014 and through the duration of the first refueling outage of the first period in the fifth ten-year inservice inspection interval. In our December 9, 2013 letter (Serial No.13-639), Revised Relief Request SPT-003 stated that the Surry Unit I fourth ISI interval was being extended to October 13, 2014, and our November 26, 2013 letter (Serial No.13-611) identified the fifth ISI interval start date as December 14, 2013.

If you have any questions concerning this information, please contact Mrs. Candee G. Lovett at (757) 365-2178.

Douglas C. L13wr~nce Director Station Safety & Licensing Surry Power Station

Attachment:

Owner's Activity Report (Form OAR-I), Surry Unit I Refueling Outage $1R26, First Period of the Fifth ISI Interval Commitments made in this letter: None 1 LVj47

Serial No.: 15-373 Docket No.: 50-280 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector Surry Power Station Ms. K. Cotton Gross NRC Project Manager - Surry

-U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Dr. V. Sreenivas NRC Project Manager - North Anna U. S. Nuclear Regulatory Commission

,;One White Flint North

  • Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station

Serial No.: 15-373 Docket No.: 50-280 ATTACHMENT OWNER'S ACTIVITY REPORT (FORM OAR-I),

SURRY UNIT 1 REFUELING OUTAGE $1 R26, FIRST PERIOD OF THE FIFTH ISI INTERVAL VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-5 FORM OAR-i OWNER'S ACTIVITY REPORT R~nnrt Niimh~r qtlrrv VA 7*4RRq

  1. nnrl gq[TN Hnn fqlnncl

£11rrv Pnwor qf*finn Plant ~rIrru Prn,,,r-~r ~1~linn ~c7fl I-Inn kIn,1 Pnrri C~Irni VA 9~RR~

I Init Nn 1 Commercial service date 12/22/1972 Refueling outage no. S1R26 (if applicable)

Current inspection interval 5th (1st, 2nd, 3rd, 4th, other)

Current inspection period 1st (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 4th Tnf_ 1qqR F-2000* A and Sth Int. 2004 F Date and revision of inspection plans Surry Unit 1, 4th Int. ISI Plan, Rev 12, Aug. 25, 2014 / 5th Int. ISI Plan, Revision 1, Mar. 12, 2015 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used for inspection and evaluation: N-586-1 (if applicable, including cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XL and (c) the repair/replacement activities and evaluations supporting the completion of $1R26 conform to the/eqi, ments of Section XI. (refueling outage number)

Signed J'ir] ..... / 1S1Progam Owner Date y/2-6 /I5 "

~Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by HSB-GS of Hartford, CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions NB-7933 NS, IS; VA883(R)

Inspector's Signature National Board, State, Province, and Endorsements Date

/ /

Page 1 of 2 CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N- 25 FORM OAR-i OWNER'S ACTIVITY REPORT Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item Number JjItem Description Evaluation Description None Note: There were no items requiring analytical evaluation to include on this table for interval 4 or interval 5 during this reporting cycle.

Page 2 of.2 CASE N-532-5 CASES OASME BOILER' ANDPRSSREVESSE COEPR FORM OAR-i OWNER'S ACTIV~~Y REPORT Table 2 Abstract of Repair/replacement Activities Required for Continued Service Code Class Item Description Date Repair/Replacement Description of Work Completed Plan Number 1 1-CH-H001 Repair pipe support on line 5/9/2015 2015-086 12"RC-i199-1502 and 2" CH-9-1 502 for

2-RC-HCV-1 556B.

I1-SI-H005-1 Repair NDE rejected indications on 5/4/2015 2015-088 integral attachment on line 2" SI-74-1 502 using the guidance of Nuclear Code Case N-586-1.

1 2" RC-56-1502 Replace piping for NDE rejected 5/5/2015 2015-082 indications.

21-RS-MEJ-2A-PIPE Weld repair expansion joint for though- 5/13/2015 2015-098 wall leak.

21 -RS-MEJ-2B-PIPE Replace expansion joint for 5/20/2015 2015-095 through-wall leak.

301 -SW-269 Replace pipe tee upstream of 11/24/2014 2014-126 01-SW-269 on line number 2" WS-171-9107.

301-SW-P-lOB Replace discharge spool piece for 6/17/2014 2014-097 through-wall leak 32" WS-314-9107 Repair fiberglass piping for through- 5/28/2015 2015-113 wall leak.

348" WC-2-10 Weld repair piping for through-wall 4/28/2015 2015-079 corrosion.

396" WC-3-10 Weld repair piping for through-wall 4/28/2015 201 5-080 corrosion.

Note: There were no interval 4 items to be included on this table during this reporting cycle.