ML031290232
Jump to navigation
Jump to search
| ML031290232 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 05/08/2003 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Gratton C, NRR/DLPM 415-1055 | |
| Shared Package | |
| ML031280339 | List: |
| References | |
| TAC MB6291, TAC MB6292 | |
| Download: ML031290232 (1) | |
Text
EDG Fuel Oil Consumption Worst Case -
3 EDGs Full Load Operation 1
{
TS-required seismic fuel oil supply F-r 29 hrs Realistic Case-3 EDGs LOOP Load Operation FuMite Replacement FuelIOil Supply ae Availability Minimum fuel availability required per Periodic Test 41 hours4.74537e-4 days <br />0.0114 hours <br />6.779101e-5 weeks <br />1.56005e-5 months <br /> First tanker (-7500 gals.) Arrival within 12 hrs + < 3 hrs for FO testing & tanker off-load < 15 hrs Delivery of balance of 50,000 gals. (via 6 additional tankers) within 48 hrs Wl tl Out-of-Service Buried FO Tank Available
{
O Within 12hrs
-*57% within 1 hr LOOP Recovery Time Line (hrs)
- 98% within 25 hrs
_P C-'.
0
- 3 (D
N C-,
0.1 20.30
.40
.50