Graph Emergency Diesel Fuel Oil Consumption
ML031290232
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/08/2003
From:
Office of Nuclear Reactor Regulation
To:
Gratton C, NRR/DLPM 415-1055
Shared Package
ML031280339 List:
References
TAC MB6291, TAC MB6292
Download: ML031290232 (1)


Text

EDG Fuel Oil Consumption Worst Case -

3 EDGs Full Load Operation 1

{

TS-required seismic fuel oil supply F-r 29 hrs Realistic Case-3 EDGs LOOP Load Operation FuMite Replacement FuelIOil Supply ae Availability Minimum fuel availability required per Periodic Test 41 hours4.74537e-4 days <br />0.0114 hours <br />6.779101e-5 weeks <br />1.56005e-5 months <br /> First tanker (-7500 gals.) Arrival within 12 hrs + < 3 hrs for FO testing & tanker off-load < 15 hrs Delivery of balance of 50,000 gals. (via 6 additional tankers) within 48 hrs Wl tl Out-of-Service Buried FO Tank Available

{

O Within 12hrs

-*57% within 1 hr LOOP Recovery Time Line (hrs)

  • 98% within 25 hrs

_P C-'.

0

3 (D

N C-,

0.1 20.30

.40

.50