Inservice Inspection Owner'S Activity Report
ML16081A167
Person / Time
Site: Surry Dominion icon.png
Issue date: 03/01/2016
From: Lawrence D
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
16-076, N-532-5
Download: ML16081A167 (6)


Text

VIRGINIaA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 1, 2016 United States Nuclear Regulatory Commission Serial No.16-076 Attention: Document Control Desk SPS-LIC/CGL R0 Washington, DC 20555-0001 Docket No. 50-281 License No. DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT (OAR)

In accordance with the requirements of ASME Code Case N-532-5, Virginia Electric and Power Company (Dominion) hereby submits the Inservice Inspection Owner's Activity Report (Form OAR-I) for Surry Unit 2 refueling outage S2R26, which ended on December 11, 2015. This document contains the reporting requirements for the first refueling outage of the first period in the fifth ten-year inservice inspection interval for Surry Unit 2.

If you have any questions concerning this information, please contact Mrs. Candee G. Lovett at (757) 365-2178.

VeryL youri*/tr Douglas C _awrence Director Station Safety & Licensing Surry Power Station

Attachment:

Owner's Activity Report (Form OAR-I), Surry Unit 2 Refueling Outage $2R26, First Period of the Fifth ISI Interval Commitments made in this letter: None

Serial No.: 16-076 Docket No.: 50-281 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector Surry Power Station Ms. K. Cotton Gross NRC Project Manager - Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Dr. V. Sreenivas NRC Project Manager - North Anna U. S. Nuclear Regulatory Commission One White Flint North.

Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station

Serial No.: 16-076 Docket No.: 50-281 ATTACHMENT OWNER'S ACTIVITY REPORT (FORM OAR-I),

SURRY UNIT 2 REFUELING OUTAGE S2R26, FIRST PERIOD OF THE FIFTH ISI INTERVAL VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532 -5 FORM OAR-i OWNER'S ACTIVITY REPORT Rpnnr-t Nuimh~r 2-~-1 -1 (I mit 9 ~th Tntpn,~l 1~f-Pprinrl 1~t Pc'nrn-fl Plant Unit No. 2 Commercial service date 05/01/1973 Refueling outage no. $2R26 (if applicable)

Current inspection interval 5th (1st, 2nd, 3rd, 4th, other)

Current inspection period 1st (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 2004 Edition Date and revision of inspection plans Surry Unit 2, 5th Int. ISI Plan, Revision 1, Aug. 18, 2015 Edition and Addenda of Section XI aoolicable to reoair/replacement activities, if different than the inspection olans Code Cases used for inspection and evaluation: None (if applicable, including cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of $2R26 conform to th~e requi*;ments of Section XI. (refueling outage number)

Signed

  • Y~.--**/ISI1 Progam Owner Date . ,~ 2/ 4

/ ' Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Comoany of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Secton XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

,-* -* Commissions NB-7933 NS, IS; VA883(R)

Inspector's Signature National Board, State, Province, and Endorsements Date ///

Page 1 of 2 CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-5 FORM OAR-i OWNER'S ACTIVITY REPORT Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item Description Evaluation Description Item Number None

Page 2 of 2 CAS E N-532-5 CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-i OWNER'S ACTIVITY REPORT Table 2 Abstract of Repairlreplacement Activities Required for Continued Service Code Class Item Description Date Repair/Replacement

______ Description of Work Completed Plan Number I 02-RC-E-1 B Replace fasteners that were out of 11/20/2015 2015-262 procedure tolerance when tensioning during Installation.

I2-RC-R-1-VESSEL Replace reactor vessel head stud. 1 1/27/2015 2015-245 2 02-RC-E-1C Plugged 3 tubes for circumferential 11/15/2015 2015-259 PWSCC and plugged 1 tube due to restriction.

3 01-SW-PP-2.00-WS-PIPE- Replace piping to correct through wall 10/8/2015 2015-1 83 316-9107 ileak.

3 01-SW-PP-'6.00-WS-PIPE- Replace piping to correct through wall 11/3/2015 2015-239 301-9107 leak.

302-CW-PP-96.00-WC- Repair through wall leaks. 11/1/2015 2015-214 PIPE-102-10 3 02-SW-PP-2.00-WS-PIPE- Replace piping to correct through wall 11/27/2015 2015-240

.314-9107 leak.

3. 02-SW-PP-30.00-WS- Repair through walJ leaks. 11/25/2015 2015-261 PIPE-I138-10,

VIRGINIaA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 1, 2016 United States Nuclear Regulatory Commission Serial No.16-076 Attention: Document Control Desk SPS-LIC/CGL R0 Washington, DC 20555-0001 Docket No. 50-281 License No. DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT (OAR)

In accordance with the requirements of ASME Code Case N-532-5, Virginia Electric and Power Company (Dominion) hereby submits the Inservice Inspection Owner's Activity Report (Form OAR-I) for Surry Unit 2 refueling outage S2R26, which ended on December 11, 2015. This document contains the reporting requirements for the first refueling outage of the first period in the fifth ten-year inservice inspection interval for Surry Unit 2.

If you have any questions concerning this information, please contact Mrs. Candee G. Lovett at (757) 365-2178.

VeryL youri*/tr Douglas C _awrence Director Station Safety & Licensing Surry Power Station

Attachment:

Owner's Activity Report (Form OAR-I), Surry Unit 2 Refueling Outage $2R26, First Period of the Fifth ISI Interval Commitments made in this letter: None

Serial No.: 16-076 Docket No.: 50-281 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector Surry Power Station Ms. K. Cotton Gross NRC Project Manager - Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Dr. V. Sreenivas NRC Project Manager - North Anna U. S. Nuclear Regulatory Commission One White Flint North.

Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station

Serial No.: 16-076 Docket No.: 50-281 ATTACHMENT OWNER'S ACTIVITY REPORT (FORM OAR-I),

SURRY UNIT 2 REFUELING OUTAGE S2R26, FIRST PERIOD OF THE FIFTH ISI INTERVAL VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532 -5 FORM OAR-i OWNER'S ACTIVITY REPORT Rpnnr-t Nuimh~r 2-~-1 -1 (I mit 9 ~th Tntpn,~l 1~f-Pprinrl 1~t Pc'nrn-fl Plant Unit No. 2 Commercial service date 05/01/1973 Refueling outage no. $2R26 (if applicable)

Current inspection interval 5th (1st, 2nd, 3rd, 4th, other)

Current inspection period 1st (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 2004 Edition Date and revision of inspection plans Surry Unit 2, 5th Int. ISI Plan, Revision 1, Aug. 18, 2015 Edition and Addenda of Section XI aoolicable to reoair/replacement activities, if different than the inspection olans Code Cases used for inspection and evaluation: None (if applicable, including cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of $2R26 conform to th~e requi*;ments of Section XI. (refueling outage number)

Signed

  • Y~.--**/ISI1 Progam Owner Date . ,~ 2/ 4

/ ' Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Comoany of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Secton XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

,-* -* Commissions NB-7933 NS, IS; VA883(R)

Inspector's Signature National Board, State, Province, and Endorsements Date ///

Page 1 of 2 CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-5 FORM OAR-i OWNER'S ACTIVITY REPORT Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item Description Evaluation Description Item Number None

Page 2 of 2 CAS E N-532-5 CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-i OWNER'S ACTIVITY REPORT Table 2 Abstract of Repairlreplacement Activities Required for Continued Service Code Class Item Description Date Repair/Replacement

______ Description of Work Completed Plan Number I 02-RC-E-1 B Replace fasteners that were out of 11/20/2015 2015-262 procedure tolerance when tensioning during Installation.

I2-RC-R-1-VESSEL Replace reactor vessel head stud. 1 1/27/2015 2015-245 2 02-RC-E-1C Plugged 3 tubes for circumferential 11/15/2015 2015-259 PWSCC and plugged 1 tube due to restriction.

3 01-SW-PP-2.00-WS-PIPE- Replace piping to correct through wall 10/8/2015 2015-1 83 316-9107 ileak.

3 01-SW-PP-'6.00-WS-PIPE- Replace piping to correct through wall 11/3/2015 2015-239 301-9107 leak.

302-CW-PP-96.00-WC- Repair through wall leaks. 11/1/2015 2015-214 PIPE-102-10 3 02-SW-PP-2.00-WS-PIPE- Replace piping to correct through wall 11/27/2015 2015-240

.314-9107 leak.

3. 02-SW-PP-30.00-WS- Repair through walJ leaks. 11/25/2015 2015-261 PIPE-I138-10,