VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRG[NTA 23261 September 6, 2011 United States Nuclear Regulatory Commission Serial No.11-489 Attention: Document Control Desk SPS-LIC/CGL RO Washington, DC 20555-0001 Docket No. 50-281 License No. DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT (OAR)

In accordance with the requirements of ASME Code Case N-532-4, Virginia Electric and Power Company (Dominion) hereby submits the Inservice Inspection Owner's Activity Report (Form OAR-i) for Surry Unit 2 refueling outage $2R23. This document contains the reporting requirements for the third refueling outage of the second period in the fourth ten-year inservice inspection interval for Surry Unit 2.

If you have any questions concerning this information, please contact Mrs. Candee G. Lovett at (757) 365-2178.

Very truly yours, B. L. Stanley Director Station Safety & Licensing Surry Power Station

Attachment:

Owner's Activity Report (Form OAR-i), Surry Unit 2 Refueling Outage S2R23, Second Period of the Fourth ISI Interval Commitments made in this letter: None

Serial No.: 11-489 Docket No.: 50-281 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I1 Marquis One Tower 245 Peachtree Center Avenue NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector Surry Power Station Ms. K. R. Cotton NRC Project Manager - Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852 Mr. R. E. Martin NRC Project Manager- North Anna U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852 Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station

Serial No.: 11-489 Docket No.: 50-281 ATTACHMENT Owner's Activity Report (Form OAR-I),

Surry Unit 2 Refueling Outage S2R23, Second Period of the Fourth ISI Interval VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-4 FORM OAR-i OWNER'S ACTIVITY REPORT Report Number 2-4-2-3 (Unit 2. 4th Interval. 2nd Period. 3rd Renort 8 Plant Surrv Power Station. 5570 Hog Island Road, Surry, VA 23883 Unit No._ 2 Commercial service date 05/01/1973 Refueling outage No. $2R23 (if applicable) 4th Current inspection interval (1st, 2nd, 3rd, 4th, other)

Current inspection period 2nd (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 1998 Edition, 2000 Addenda Date and revision of inspection plans Surry Unit 2, 4th Interval ISI Plan, Revision 8, April 1, 2010 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Code Cases used: N-532-4, N-566-2 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,&*on XI and (c) the repair/replacement activities and evaluations supporting the completion of $2R23 conf rm the r iremants of Section XI. (refueling outage number)

Signe 4-

-. -?- " ,. OI.*,Jod* Date O0/? /ao I ner or Owner's Designe , Title, CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Virginia and employed by HSB-CT of CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

4' '* i 4 "j*?I-.-* Commissions VA883(R)

Inspector's Signature National Board, State, Province, and Endorsements Date ___ _ _ 1__/ __

Page 1 of 3 CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-4 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Item Description Evaluation Description Category and Item B-P,B15.70 2-SI-91 / Bolted Flange During the performance of an ASME Section XI system pressure test (2-NPT-RC-002), boric acid was discovered on the flange of 2-Sl-91.

(CA198572)

Code Case N-566-2 was used to perform an evaluation of the bolting and component material.

This evaluation determined the bolting and component to be acceptable for continued service.

B-P,B15.70 2-RC-MOV-2592 / Bolted Flange During the performance of an ASME Section Xl system pressure test (2-NPT-RC-002), boric acid was discovered on the flange of 2-RC-MOV-2592.

(CA198573)

Code Case N-566-2 was used to perform an evaluation of the bolting and component material.

This evaluation determined the bolting and component to be acceptable for continued service.

B-P,B15.60 2-RC-P-1C During the performance of an ASME Section XI system pressure test (2-PT-11), boric acid was discovered on the flange of 2-RC-P-1 C as a result of seal leakage. (CA203790)

Code Case N-566-2 was used to perform an evaluation of the bolting and component material.

This evaluation determined the bolting and component to be acceptable for continued service.

F-A,F1.30 6" CC-153/ 2-CC-H001 VT-3 examination on spring support 2-CC-H001 revealed a bent rod and weld configuration discrepancy. (CR425333)

Engineering evaluation concluded the spring support is functional.

F-A,F1.10 12" RC-310 / 2-RC-HO02A VI-3 examination on spring support 2-RC-HO02A revealed misalignment. (CR423836)

Engineering evaluation concluded the spring support is functional.

F-A,F1.10 12" RC-310 / 2-RC-HO02B VT-3 examination on spring support 2-RC-HO02B revealed misalignment. (CR423841)

Engineering evaluation concluded the spring support is functional.

Page 2 of 3 CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-4 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Item Description Evaluation Description Category and Item F-A,F1.20 6" WAPD-150 / 2-WAPD-H025 VT-3 examination on a vertical/lateral constraint piping support 2-WAPD-H025 revealed incorrect clearances.

(CR424116)

Engineering evaluation concluded the vertical/lateral constraint piping support is functional.

F-A,F1.40 2" RC-359 / 2-RC-H002 Vr-3 examination on spring support 2-RC-H002 revealed that the as-found cold load setting was outside of the acceptance tolerance given for this spring support.

(CR424757)

Engineering evaluation concluded the spring support is functional.

F-A,F1.10 4" RC-314 / 2-RC-H037A VT-3 examination on spring support 2-RC-H037A revealed that the as-found cold load setting was outside of the acceptance tolerance given for this spring support.

(CR425068)

Engineering evaluation concluded the spring support is functional.

F-A,F1.10 4" RC-314 / 2-RC-H037B VT-3 examination on spring support 2-RC-H037B revealed that the as-found cold load setting was outside of the acceptance tolerance given for this spring support.

(CR425070)

Engineering evaluation concluded the spring support is functional.

Page 3 of 3 CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-4 FORM OAR-i OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date Repair/Replacement Description of Work Completed Plan Number 2 02-RC-MOV-2591 Replace damaged fasteners. 05/14/2011 2011-063 2 02-CH-E-6C Replace flange fasteners for 02- 04/30/2011 2011-002 CH-E-6C heat exchanger.

2 02-CH-E-6C Replace flange fasteners for 02- 04/28/2010 2010-018 CH-E-6C heat exchanger.

2 02-CH-E-6A Replace heat exchanger 02-CH- 01/13/2010 2010-001 E-6A due to ruptured tube.

2 02-CC-PP-6.00-CC-PIPE-1 53- Restore integral attachment on 05/11/2011 2011-116 151 02-CC-PP-6.00-CC-PIPE-153-151.

3 30" WS-137-10 Repair through wall leak. 05/23/2011 2011-129 3 96" WC-101-10 Repair through wall leak. 05/25/2011 2011-118 3 02-SW-TCV-208A Replaced valve due to through 02/26/2010 2010-010 wall leak.