Inservice Inspection Owner'S Activity Report Ended on June 1, 2021
ML21235A091
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/23/2021
From: Henderson J
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
21-256
Download: ML21235A091 (6)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RI CHMO ND, VIRGINIA 23261 August 23, 2021 United States Nuclear Regulatory Commission Serial No.21-256 Attention : Document Control Desk SPS-LIC/MSG RO Washington, DC 20555-0001 Docket No. 50-280 License No. DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT (OAR)

In accordance with the requirements of ASME Code Case N-532-5, Virginia Electric and Power Company (Dominion Energy Virginia) hereby submits the lnservice Inspection Owner's Activity Report (Form OAR-1) for Surry Unit 1 refueling outage S1 R30, which ended on June 1, 2021. This document contains the reporting requirements for the first refueling outage of the third period in the fifth ten-year inservice inspection interval for Surry Unit 1.

If you have any questions concerning this information , please contact Ms. Maria Groshner at (757) 365-2593.

Very truly yours,

__.,.____ ~

Johnny Henderson Director Station Safety & Licensing Surry Power Station

Attachment:

Owner's Activity Report (Form OAR-1), Surry Unit 1 Refueling Outage S1 R30, Third Period of the Fifth ISi Interval Commitments made in this letter: None

Serial No.: 21-256 Docket No.: 50-280 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector Surry Power Station Mr. V. Thomas NRC Project Manager - Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. E. Miller NRC Senior Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Mr. R. Richardson Authorized Nuclear Inspector Surry Power Station

Serial No.: 21-256 Docket No.: 50-280

Attachment:

Page 1 of 4 ATTACHMENT OWNER'S ACTIVITY REPORT (FORM OAR-1),

SURRY UNIT 1 REFUELING OUTAGE S1R30, THIRD PERIOD OF THE FIFTH ISi INTERVAL VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)

Serial No .: 21 -256 Docket No.: 50-280

Attachment:

Page 2 of 4 CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-5 FORM OAR-1 OWI\I ER'S ACTIVITY REPORT Report Number_~l~-~5-~3~-1"-'-' /U=n=it~l=*~S=t,__,_h~I,~1t=e~rv=a~l.~3=rd~Pe=.r=io=d~,~l=st~R=e=p=o,~t~l_ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ __

Plant ----~S=u,__,_rry_,_,_P~o=w=e,_r""St,,,a"'ti""on"",~5""5,.,.7=0~H=o,,,g'-'J""sl"'a,__,_nd"---'--'R""oa,,,d"'*-...,,S"'u""rry.,_._V,__,_A-'-"'2""38,,.,8""3'------------------------

Unit No. _ _ _ _ _ _~1_ __ _ __ Commercial service date - - ~1=2~/2=2=/=19=7~2~_ Refueling outage no. --~Sl~R=3=0-(if applicable)

Current inspection interval - - - -- - - - - - - - - - - - - - ~ S ~t,h __,__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

(1st. 2nd. 3rd. 4th, other) .

Current inspection period 3rd

( 1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 2004 Edition Date and revision of inspection plans Surry Unit 1, 5th Interval ISi Plan, Revision 6 January, 202 1 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used for inspection and evaluation: - ~S""e,.,e=S=u,_,_rry-'-"U""ncsit-"1~,,,_ St,,.hul""n.,_,t....,J_,,_S,_l'""'Pl"'a,__,n.'--'R__,__,e,,_v~

_, . =6___,,S<-'ae_,, ct,,.,io"'-n'--'6"'-'-'fo"'-r.. , c"'o,_m,,,p=le"'

_,_ te"-'-"lis"'t-"o"---f""co,,.,d,.,,e._,c.,.a""se,,,.,.s'-------

(if applicable, including cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code.Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of SlR30 conform to t , f Section XI. (refueling outilge number)

Date .<<~/J,;J=

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report. and state that. to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any perso

  • a injury or property damage or a loss of any kind arising from or connected with this inspection.

(National Board Number and Endorsement)

Date _ _ l~\_7~j_tb_1.-_\_ __

Serial No.: 21-256 Docket No.: 50-280

Attachment:

Page 3 of 4 Page 1 of 1 CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-5 FORM OAR-1 OWNER'S ACTIVITY REPORT Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item Description Evaluation Description Item Number NIA, NIA None None

Serial No.: 21-256 Docket No.: 50-280

Attachment:

Page 4 of 4 Page 1 of 1 CASE CASES OF ASME BOILER AND PRESSURE VESSEL CODE N-532-5 FORM OAR-1 OWNER'S ACTIVITY REPORT Table 2 Abstract of Repair/replacement Activities Required for Continued Service Code Class Item Description Date Repair/Replacement Description of Work Completed Plan Number 1 01-RC-E-1C Steam Generator 1-RC-E-1C requires 5/11/2021 2021-058 tube plugging . QC to verify tubes to be plugged.

3 01 -CC-E-10 Piping Replacement 2/21/2021 2021-037 3 01-CC-E-10 Perform Weld repairs IAW Basemetal 3/4/2021 2020-101 Repair Instruction Sheet (Contingency) 3 01-CC-PP-18.00-CC-PIPE- Make temporary support permanent 5/24/2021 2021-065 229-121 by installing additional support structure, base plate and anchor bolts to existing stack of shims.

3 01-CC-PP-18.00-CC-PIPE- Make temporary support permanent 5/24/2021 2021-064 229-121 by installing additional support structure, base plate and anchor bolts to existing stack of shims.

3 01-CC-PP-18.00-CC-PIPE- Make temporary support permanent 5/24/2021 2021-063 229-121 by installing additional support structure, base plate and anchor bolts to existing stack of shims.

3 01 -SW-P P-3. 00-WS-PI PE- Replace 3" pipe and flange on SW 5/10/2021 2021-046 36-10 vent line.

3 01 -SW -PP-3. 00-WS-PIPE- Replace 3" pipe where 3"-WS-562- 5/10/2021 2021-045 562-151 21 X tees in (downstream of valve 1-SW-903).