Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML14135A3652014-05-0606 May 2014 Steam Generator Tube Inspection Report for the Fall 2013 Refueling Outage Project stage: Request ML14335A6062014-11-19019 November 2014 Response to Request for Additional Information Re 2013 Steam Generator Inservice Inspection Report Project stage: Response to RAI ML15072A2992015-03-16016 March 2015 Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25 Project stage: Approval 2014-05-06
[Table View] |
Similar Documents at Surry |
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23244A0142023-08-30030 August 2023 Inservice Inspection Owners Activity Report ML23073A1822023-03-14014 March 2023 Inservice Inspection Owners Activity Report (OAR) ML22108A2242022-04-14014 April 2022 Steam Generator Tube Inspection Report for the Fall 2021 Refueling Outage ML22048B8192022-02-17017 February 2022 Inservice Inspection Owners Activity Report (OAR) ML21243A3132021-08-27027 August 2021 Steam Generating Tube Inspection Report for the Spring 2021 Refueling Outage ML21235A0912021-08-23023 August 2021 Inservice Inspection Owner'S Activity Report Ended on June 1, 2021 ML20304A1542020-08-25025 August 2020 Inservice Inspection Owner'S Activity Report ML20101H3072020-03-26026 March 2020 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML20087H0092020-03-11011 March 2020 Steam Generator Tube Inspection Report for the Fall 2019 Refueling Outage ML20136A2532020-02-18018 February 2020 Submittal of Inservice Inspection Owner'S Activity Report for Surry Unit 1 Refueling Outgae s1R29 Which Ended on 11/29/2019 ML19331A9162019-11-27027 November 2019 ASME Section XI Inservice Inspection Program Proposed Alternative Request S2-15-ISI-05 to Use a Mechanical Clamping Device for a One-Inch Main Steam Line Pipe Repair ML19071A1072019-03-0404 March 2019 Inservice Inspection Owner'S Activity Report ML18331A1622018-11-19019 November 2018 Steam Generator Tube Inspection Report for the Spring 2018 Refueling Outage ML18229A0622018-08-10010 August 2018 Inservice Inspection Owner'S Activity Report ML17251A8952017-08-31031 August 2017 Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Buried Circulating and Service Water Class 3 Piping with Carbon Fiber Reinforced Polymer Response to Request for Additional Information ML17261A1872017-08-29029 August 2017 Inservice Inspection Owner'S Activity Report ML17121A3782017-04-24024 April 2017 Submittal of Steam Generator Tube Inspection Report for the Fall 2016 Refueling Outage ML17040A4072017-02-0606 February 2017 Inservice Inspection Owner'S Activity Report 1-5-1-2, for Refueling Outage S1R27, First Period of the Fifth ISI Interval ML16355A3462016-12-14014 December 2016 Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(Z)(1) ML16141A1172016-05-10010 May 2016 Inspection Report for the Fall 2015 Refueling Outage ML16131A6352016-05-0505 May 2016 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Preformed in the Fourth 10-Year Insevice Inspection Interval ML16081A1672016-03-0101 March 2016 Inservice Inspection Owner'S Activity Report ML15324A0142015-11-0606 November 2015 Steam Generator Tube Inspection Report for the Spring 2015 Refueling Outage ML15293A1242015-10-0909 October 2015 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML15224B3602015-07-31031 July 2015 Inservice Inspection Owner'S Activity Report (OAR) ML14335A6062014-11-19019 November 2014 Response to Request for Additional Information Re 2013 Steam Generator Inservice Inspection Report ML14294A4492014-10-16016 October 2014 Steam Generator Tube Inservice Inspection Report for the Spring 2014 Refueling Outage ML14216A3452014-07-24024 July 2014 Inservice Inspection Owner'S Activity Report ML14133A0062014-05-0707 May 2014 Fifth 10-Year Interval Inservice Inspection Program and Alternative Requests ML14135A3652014-05-0606 May 2014 Steam Generator Tube Inspection Report for the Fall 2013 Refueling Outage ML14056A1942014-02-18018 February 2014 Inservice Inspection Owner'S Activity Report ML13336A1422013-11-26026 November 2013 Fifth 10-Year Interval Inservice Inspection Program and Alternative Requests ML13149A2292013-05-10010 May 2013 Steam Generator Tube Inservice Inspection Report for the Fall 2012 Refueling Outage ML13128A1042013-05-0101 May 2013 Inservice Testing Program for Pumps and Valves Fifth Ten Year Interval Update and Associated Relief Requests ML13056A4122013-02-15015 February 2013 Inservice Inspection Owner'S Activity Report (OAR) ML12321A0472012-10-30030 October 2012 Steam Generator Tube Inservice Inspection Report for the Spring 2012 Refueling Outage ML12242A3472012-08-16016 August 2012 Inservice Inspection Owner'S Activity Report (OAR) ML11291A0582011-10-0505 October 2011 Steam Generator Tube Inservice Inspection Report for the 2011 Refueling Outrage ML11264A0362011-09-0606 September 2011 Inservice Inspection Owner'S Activity Report (OAR) ML11154A1012011-05-24024 May 2011 Steam Generator Tube Inservice Inspection Report for the 2010 Refueling Outage ML1130802582011-02-21021 February 2011 Inservice Inspection Owner'S Activity Report ML1015305332010-05-24024 May 2010 Steam Generator Tube Inservice Inspection Report for 2009 Refueling Outage ML1006804222010-02-25025 February 2010 Inservice Inspection Owner'S Activity Report (OAR) ML0932002072009-11-0404 November 2009 Steam Generator Tube Inservice Inspection Report for 2009 Refueling Outage ML0923002302009-08-0707 August 2009 Inservice Inspection Owner'S Activity Report ML0900601112008-11-14014 November 2008 Steam Generator Tube Inservice Inspection Report for the 2008 Refueling Outage 2024-07-08
[Table view] Category:Letter
MONTHYEARML24302A1762024-10-22022 October 2024 Core Operating Limits Report Surry 2 Cycle 33 Pattern Hot Revision 0 ML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code IR 05000280/20244032024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 And Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 2024-09-03
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 November 19, 2014 United States Nuclear Regulatory Commission Serial No. 14-209A Attention: Document Control Desk SPS LIC/CGL RO Washington, DC 20555-0001 Docket No. 50-280 License No. DPR-32 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION 2013 STEAM GENERATOR INSERVICE INSPECTION REPORT By letter dated May 6, 2014 (Serial No.14-209), Virginia Electric and Power Company (Dominion) submitted information summarizing the results of steam generator (SG) tube inspections performed at Surry Power Station Unit 1 during the Fall 2013 refueling outage. On October 22, 2014, the NRC requested additional information related to the SG inspections. The NRC's questions and Dominion's responses are provided in the attachment to this letter.
If you have any questions or require additional information, please contact Ms. Candee Lovett at (757) 365-2178.
Very truly yours, N. L. Lane Site Vice President Surry Power Station Attachment - Response to NRC Request for Additional Information Regarding Fall 2013 Steam Generator Inservice Inspection Report Commitments made in this letter: None
/ikoL-
Serial No.: 14-209A Docket No.: 50-280 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303 Ms. K. R. Cotton - Surry NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0 8G-9A 11555 Rockville Pike Rockville, Maryland 20852 Dr. V. Sreenivas - North Anna NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0 8G-9A 11555 Rockville Pike Rockville, Maryland 20852 NRC Senior Resident Inspector Surry Power Station Mr. R. A. Smith Authorized Nuclear Inspector Surry Power Station
Serial No.: 14-209A Docket No.: 50-280 ATTACHMENT Response to NRC Request for Additional Information Regarding Fall 2013 Steam Generator Inservice Inspection Report Surry Power Station Unit I Virginia Electric and Power Company (Dominion)
Serial No.: 14-209A Docket No.: 50-280 Attachment RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING SURRY UNIT 1 FALL 2013 STEAM GENERATOR INSPECTIONS By letter dated May 6, 2014 (Serial No.14-209 - Agencywide Documents Access and Management System (ADAMS) Accession Number ML14135A365), Virginia Electric and Power Company (Dominion) submitted steam generator tube inspection results from the Fall 2013 inspections at Surry Power Station Unit 1. In order to complete its review of the document listed above, the NRC staff requests the following additional information. The Dominion responses are provided below.
- 1. It was indicated that the steam generators (SGs) had operated for 300.9 effective full power months (EFPM) at the time of this inspection. In a letter dated October 30, 2012 (ADAMS Accession Number ML12321A047), it was indicated that the SGs had operated for 300.1 EFPM, which gives a difference of 0.8 EFPM between this and the prior outage. Please verify that these values are correct.
Response
The 300.9 EFPM value is correct, and the 300.1 EFPM value requires the following clarification. The EFPM reported in the October 30, 2012 report included the 15.9 EFPM operating time prior to the first in-service inspection. To be consistent with previous submittals, the EFPM number in the October 30, 2012 report should have been reported as 284.2 EFPM. Therefore, the approximate time between the Unit 1 Fall 2013 inspection and the Unit 1 Spring 2012 inspection would be 16.7 EFPM.
- 2. Please discuss the results of the secondary side upper bundle inspections performed in SG B and SG C, and the results of any foreign object search and retrieval inspections that were performed in the three SGs.
Response
The visual inspection of welds, components, and a check for foreign material was completed in the secondary side of SG B and SG C during the Unit 1 Fall 2013 refueling outage with no abnormal conditions identified. The steam generator internals were found to be in the as-designed configuration.
In SG B, 100 percent of the top of tube sheet was inspected with eddy current (array probe) with no indications of possible loose parts identified. Since there were no loose parts to evaluate, no foreign object search and retrieval was performed at the top of tube sheet.
Page 1 of 3
Serial No.: 14-209A Docket No.: 50-280 Attachment
- 3. Two small volumetric indications were reported in SG B row 37 column 31 (R37C31) and R45C48. Please discuss the cause of these indications. If the cause is not known, please discuss the basis for selecting the sizing technique.
Response
Two small volumetric indications were newly reported during the Unit 1 Fall 2013 refueling outage. The first in R37 031 at 04H - 24.06" was reported by bobbin as a non-quantifiable indication and then confirmed as volumetric by rotating coil examination. The indication was sized at 7 % through wall (TW) and was traced back to 1994 with no significant change in voltage or phase from 1994 to 2013. The second newly reported indication was in R45 C48 at TSC + 2.85". Historical review showed that the indication was present in 1992 eddy current examination data and has been reported consistently through 2010 with no change in signal response.
During the Unit 1 Fall 2013 refueling outage, it was reported as volumetric on the array and +PointTM probe and sized with a depth of 30 % TVV. Since both of these signals have been present since at least 1994 with no change in the eddy current signal, they are believed to be related to manufacturing anomalies.
As noted above, these volumetric indications were traced back to the 1994/1992 outages and exhibited no change. Since these indications were historical indications that exhibited no change, they were treated as manufacturing anomalies and not as possible loose part wear. Although these indications are not believed to be caused by an active damage mechanism, sizing was performed (utilizing the conservative, qualified volumetric sizing technique (21998.1)) for purposes of tracking in subsequent outages. These indications will be diagnostically examined in subsequent outages and evaluated for changes in signal formation and depth.
- 4. Please confirm that no degradation was detected during the plug, divider plate weld region, and primary channel head inspections.
Response
Visual examinations were performed in each primary side channel head in SG B.
No anomalous conditions associated with the divider plate, welds, cladding, channel head, channel head drain, or previously installed plugs were observed. Examination of the bottom of the bowl and drain in the dry condition showed no degradation.
Page 2 of 3
Serial No.: 14-209A Docket No.: 50-280 Attachment
- 5. A number of new anti-vibration bar wear indications were reported this outage. Please discuss any insights on why there was an increase in the number of indications.
Response
AVB wear not reportable during any previous inspection was reported in nine tubes in SG B during this outage (with a maximum depth of 14 %TW). This quantity and depth of newly-reported indications is within expectations based on industry experience and previous experience at Surry Unit 1 and Unit 2.
The most likely reason for the newly reported indications is related to the probability of detection of these shallow wear indications. These shallow wear flaws are near the threshold of detection for this mechanism and, hence, may have been present, but undetectable, during previous inspections.