Category:Graphics incl Charts and Tables
MONTHYEARLR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23249A2632023-09-0606 September 2023 Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2019 ML23249A2642023-09-0606 September 2023 Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2020 ML23249A2652023-09-0606 September 2023 Attachment 1: PSEG Site Hourly Meteorological Data (2019 - 2021), Salem/Hope Creek Finalized Hourly Meteorological Data 2021 ML23249A2662023-09-0606 September 2023 Attachment 2: Salem Pavan Input File ML23249A2672023-09-0606 September 2023 Attachment 3: Salem Pavan Output File ML23249A2682023-09-0606 September 2023 Attachment 4: Hope Creek Pavan Input File LR-N23-0050, Attachment 5: Hope Creek Pavan Output File2023-09-0606 September 2023 Attachment 5: Hope Creek Pavan Output File ML22054A1382022-02-16016 February 2022 February 24, 2022 ITS Public Meeting Material - Florida Power and Light L-2021-138, GL 2004-02 Debris Transport Calculation Non-Conservatism2021-07-15015 July 2021 GL 2004-02 Debris Transport Calculation Non-Conservatism ML20332A1592020-12-0707 December 2020 Documentation of Completion of Required Actions Taken in Response to Lessons Learned from the Fukushima Dai-Ichi Accident ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML19221B5832019-07-25025 July 2019 Biological Opinion for Turkey Point Nuclear Plant Units 3 and 4 License Renewal L-2019-020, Subsequent License Renewal Application Environmental Report Environmental Authorizations Updated Information2019-01-23023 January 2019 Subsequent License Renewal Application Environmental Report Environmental Authorizations Updated Information ML18187A0322018-07-23023 July 2018 Water Gradient Charts ML18187A0282018-07-23023 July 2018 Numeric Nutrient Criteria Violations L-2018-067, Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table ML17335A1182018-01-25025 January 2018 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident ML17213A0802017-07-28028 July 2017 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules ML17046A2962017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-112017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3.8-1 Through 3.8-11 LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted)2017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted) LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-32017-01-30030 January 2017 Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3 ML17046A3072017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Table 3A-1 (Deleted) ML17046A3112017-01-30030 January 2017 Revision 29 to Updated Final Safety Analysis Report, Table 4.1-1 Through 4.1-3 LR-N16-0161, Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal2016-12-30030 December 2016 Flood Hazards Mitigating Strategies Assessment (MSA) Report Submittal L-2016-109, Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information2016-05-11011 May 2016 Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information ML16130A5642016-05-0202 May 2016 NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML16102A2772016-03-11011 March 2016 Submittal of Annual Incidental Take Report ML16049A5422016-03-0101 March 2016 Tables 1 and 2 ML15238B7042015-09-10010 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54 Information Request - Flood Causing Mechanism Reevaluation ML15243A4472015-09-10010 September 2015 Master Report - Tables 1 and 2 ML15054A0372015-02-23023 February 2015 U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Fire PRA Facts and Observations for Turkey Point Nuclear Generating Stations, Units 3 and 4 ML15030A2492014-09-22022 September 2014 Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C' ML15030A3012014-09-22022 September 2014 Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results ML15030A3002014-09-22022 September 2014 Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results ML15030A2992014-09-22022 September 2014 Table 06B, Groundwater Analytical Results for Well AC ML15030A2982014-09-22022 September 2014 Table 06A, Groundwater Tritium Analytical Results for Well AC ML15030A2962014-09-22022 September 2014 Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014) ML15030A2952014-09-22022 September 2014 Table 04, Groundwater Measurements and Elevations - First Quarter 2014 ML15030A2942014-09-22022 September 2014 Table 03, Effluent Data Tritium Activity ML15030A2842014-09-22022 September 2014 Table 02, Sample Collection Schedule - First & Second Quarter 2014 ML15030A2832014-09-22022 September 2014 Table 01, Well Construction Details ML15030A2822014-09-22022 September 2014 Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2812014-09-22022 September 2014 Figure 15, Salem Unit 1 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A2802014-09-22022 September 2014 Figure 14, Historic Tritium Recovered Through Well Field Operation ML15030A2472014-09-22022 September 2014 Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A' ML15030A2762014-09-22022 September 2014 Figure 11, Station Wind Summary - Q1 2014 2024-04-05
[Table view] Category:Memoranda
MONTHYEARML24128A2102024-05-0707 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting Regarding Saint Lucie ML23276A6242023-10-12012 October 2023 Summary of the Closed Meeting with PSEG Nuclear LLC and Westinghouse Electric Company to Discuss Cobalt-60 Production at Salem Nuclear Generating Station ML23166A0042023-06-15015 June 2023 Summary of Meeting Concerning 2023 Annual Assessment of the Saint Lucie and the Turkey Point Nuclear Plants ML23151A5472023-06-0101 June 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 ML22255A1862022-10-0303 October 2022 Tornado Classification of the Fuel Handling Trolley Support Structure License Amendment Request Audit Plan ML22238A3142022-08-0707 August 2022 Documentation of Approval for Longer Review Period for Turkey Point Digital Instrumentation and Control License Amendment Requests Acceptance Review ML22145A3932022-05-25025 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting 20220434 ML22130A1702022-05-20020 May 2022 Summary of April 21, 2022, Public Meeting to Discuss Potential Emergency Preparedness License Amendment Request ML22130A0332022-05-0909 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting Regarding North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting Number 20220349 ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al ML21159A1352021-06-0808 June 2021 Public Meeting Summary Regarding the Saint Lucie Nuclear Plant, Units 1 and 2, Docket No. 50-335 and 389, and the Turkey Point Nuclear Generating Station Units 3 and 4, Docket No. 50-250 and 50-251; Meeting Number 20210505 ML21131A1612021-05-11011 May 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Virgil C. Summer Nuclear Station, Docket No. 50-395; North Anna Power Station, Docket Nos. 50-338 and 50-339; and Surry Power Station, Docket Nos. 50-280 and 50-281, Meeting ML21067A0922021-04-20020 April 2021 Documentation of Decision by NRC Staff That EPRI Report 3002012988, Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization, Meets Criteria for a Federal Record ML21027A0232021-01-28028 January 2021 Summary of January 26, 2021 Closed Meeting with Dominion Energy Regarding Performance of Force on Force Exercises in a Pandemic Environment ML20315A2642020-12-14014 December 2020 November 5, 2020, Summary of Drop-In Meeting with Nextera-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications ML20150B6152020-11-23023 November 2020 Memo to File: Environmental Assessment and Finding of No Significant Impact and NRC Financial Analysis for Exelon Generation Co., LLC Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Salem ISFSI ML20176A5632020-06-24024 June 2020 Reconciliation - Analysis for April 30, 2020 Surry, Units 1 and 2 for NRR Response, Subsequent License Renewal Letter ML20161A1922020-06-15015 June 2020 SLRA - Delay in Issuance of Surry Subsequent Renewed Licenses ML20150A4732020-05-29029 May 2020 EOC Meeting Summary ML20136A1752020-05-15015 May 2020 Sur 2019 Aam Meeting Summary ML19330G0542019-11-22022 November 2019 Reconciliation - Analysis of EDO Response to ACRS Ltr - Response to ACRS Report on the Safety Aspects of the SLR Application of the Turkey Point Nuclear Generating Units 3 & 4 - December 2019 Fc Meeting ML19304C1462019-11-20020 November 2019 Correction to Summary of August 13, 2019 Category 2 Public Meeting Related to the Safety Review of the Surry Power Station Units 1 and 2 SLRA ML19283B6222019-10-10010 October 2019 Subsequent License Renewal Application Safety Review - Documentation of Draft Third Round Requests for Additional Information ML19253D7082019-09-24024 September 2019 Summary of August 13, 2019, Category 2 Public Meeting Related to the Safety Review of the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application ML19253A7002019-09-0606 September 2019 (FEMA Letter to NRC 09-06-19) Preliminary Capabilities Assessment (PCA) for the Surry Power Station ML19219A2842019-08-13013 August 2019 July 29, 2019, Summary of Category 2 Public Meeting Related to the Safety Review of the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application ML19128A3372019-05-0808 May 2019 Public Meeting Summary - 2018 Annual Assessment Public Meeting Regarding Surry Power Station Docket Nos. 50-280 and 50-281 ML19121A6072019-05-0101 May 2019 Summary of Public Meeting with Turkey Point Nuclear Plant to Discuss Annual Assessment of the Turkey Point Nuclear Plant with Public for Period of January 1, 2018 - December 31, 2018 ML18360A4452018-12-26026 December 2018 06/18/18 Summary of Interagency Meeting Related to Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML18221A2652018-08-0909 August 2018 Referral Memorandum from the Secretary to the Atomic Safety and Licensing Board Panel ML18144A1242018-05-24024 May 2018 Summary of Public Meeting Concerning Annual Assessment of Turkey Point Nuclear Generating Station Unit 3 and Unit 4, for Period of January 1, 2017 December 31, 2017 ML18144A0712018-05-23023 May 2018 Summary of Annual Assessment Public Meeting Regarding Surry Power Station ML18129A3142018-05-16016 May 2018 04/17/2018 Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry, Units 1 and 2, Subsequent License Renewal Application ML18074A2522018-04-12012 April 2018 Status of Subsequent License Renewal Application ML18057A2752018-03-0101 March 2018 February 7, 2018, Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry Power Station, Units 1 and 2 Subsequent Renewal Application ML17123A1162017-05-0303 May 2017 Summary of Meeting to Discuss Annual Assessment of the Surry Power Station, Units 1 and 2 with the Public for Period of January 01, 2016 Through December 31, 2016 ML17082A5102017-04-0606 April 2017 Verbal Authorization of Relief Request No. 5 for Repair of High Head Safety Injection Recirculation Test Line - Fifth 10-Year Inservice Inspection Interval ML18187A0332016-07-19019 July 2016 County Resolution to Seek a Commitment from FPL to Discontinue Use of the Cooling Canal System at the Turkey Point Power Plant ML16097A1402016-04-0404 April 2016 March 30, 2016, Summary of Public Meeting Turkey Point Nuclear Plant ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML23333A0162016-03-0707 March 2016 Att H - MDC Report on Biscayne Bay Wq at Turkey Point CCS (March 4, 2016)-1 ML15222A5332015-08-10010 August 2015 Regulatory Audit in Support of Relief Request 1, Revised, for Fifth Ten-Year Inservice Inspection Interval ML15132A2642015-05-11011 May 2015 EOC 2014 Public Meeting Memo - Spring 2015 ML15075A2602015-03-24024 March 2015 Request for Additional Information Spring 2014 Steam Generator Tube Inspections ML14295A3342014-10-21021 October 2014 Memo_Transmittal of NUREG-XXXX, Development of a Statistical Testing Approach for Quantifying Software Reliability and Application to an Example System. ML14167A1592014-09-0202 September 2014 Summary of Category 1 Public Meeting with Salem Nuclear Generating Station, Units 1 and 2 to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 Seismic ML14156A2212014-06-0404 June 2014 Public Meeting Summary - Turkey Point Nuclear Generating Station Docket Nos. 50-250 and 50-251 2024-05-07
[Table view] Category:Status Report
MONTHYEARLR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report ML23089A3642023-03-30030 March 2023 Decommissioning Funding Status Report ML22076A0502022-03-17017 March 2022 and Salem Generating Station, Units 1 and 2 - Annual Property Insurance Status Report ML21085A5532021-03-25025 March 2021 Decommissioning Funding Status Report LR-N21-0015, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2021-03-25025 March 2021 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations IR 05000250/20200062021-03-0303 March 2021 Annual Assessment Letter for Turkey Point Nuclear Plant, Unit 3 and Unit 4 Report 05000250/2020006 and 05000251/2020006 L-2019-046, Stations - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2019-03-25025 March 2019 Stations - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update LR-N19-0014, Stations - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2019-03-25025 March 2019 Stations - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N18-0041, Annual Property Insurance Status Report2018-04-0505 April 2018 Annual Property Insurance Status Report RS-17-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2017-03-30030 March 2017 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations L-2017-040, Decommissioning Funding Status Reports/Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2017-03-30030 March 2017 Decommissioning Funding Status Reports/Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML17094A5222017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report LR-N17-0043, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2017-03-29029 March 2017 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N17-0041, Annual Property Insurance Status Report2017-03-24024 March 2017 Annual Property Insurance Status Report L-2016-068, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of FLEX Final Integrated Plan2016-06-20020 June 2016 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of FLEX Final Integrated Plan LR-N16-0043, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-29029 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) LR-N15-0167, PSEG Nuclear Llc'S Fifth Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA2015-08-26026 August 2015 PSEG Nuclear Llc'S Fifth Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12 NL-15-1620, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-26026 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML15244B2022015-08-24024 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) L-2015-193, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-11011 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) L-2015-194, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA- 12-051)2015-08-11011 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA- 12-051) ML15089A4262015-03-30030 March 2015 Annual Property Insurance Status Report LR-N15-0048, Salem, Units 1 and 2, Hope Creek - Annual Property Insurance Status Report2015-03-30030 March 2015 Salem, Units 1 and 2, Hope Creek - Annual Property Insurance Status Report ML15093A1042015-03-26026 March 2015 Decommissioning Funding Status Report ML15069A2292015-03-0202 March 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) L-2015-017, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049)2015-02-26026 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049) ML15051A2702015-02-18018 February 2015 PSEG Nuclear Llc'S Fourth Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-1 LR-N15-0023, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)2015-02-18018 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) ML15030A2942014-09-22022 September 2014 Table 03, Effluent Data Tritium Activity ML15030A3012014-09-22022 September 2014 Table 08, Unit 2 Seismic Gap Drain Tritium Analytical Results ML15030A3002014-09-22022 September 2014 Table 07, Unit 1 Seismic Gap Drain Tritium Analytical Results ML15030A2992014-09-22022 September 2014 Table 06B, Groundwater Analytical Results for Well AC ML15030A2982014-09-22022 September 2014 Table 06A, Groundwater Tritium Analytical Results for Well AC ML15030A2962014-09-22022 September 2014 Table 05, Groundwater Analytical Results (1.22.2003 Through 3.31.2014) ML15030A2752014-09-22022 September 2014 Figure 10, Precipitation Measurements ML15030A2442014-09-22022 September 2014 Figure 2, Station Layout Map ML15030A2452014-09-22022 September 2014 Figure 3, Salem Generating Station Layout Map ML15030A2462014-09-22022 September 2014 Figure 4, Station Shallow Groundwater Elevation Contours - February 2014 ML15030A2472014-09-22022 September 2014 Figure 5, Salem Generating Station Hydrogeologic Cross Section A-A' ML15030A2482014-09-22022 September 2014 Figure 6, Salem Generating Station Hydrogeologic Cross Section B-B' ML15030A2492014-09-22022 September 2014 Figure 7, Salem Generating Station Hydrogeologic Cross Section C-C' ML15030A2502014-09-22022 September 2014 Figure 8,Salem Generating Station Hydrogeologic Cross Section D-D' ML15030A2432014-09-22022 September 2014 Figure 1, Site Location Map ML15030A2422014-09-22022 September 2014 Appendix a, Mass Flux Calculations ML15030A2512014-09-22022 September 2014 Figure 9, Salem Generating Station Hydrogeologic Cross Section E-E' ML15030A2822014-09-22022 September 2014 Figure 16, Salem Unit 2 - Tritium Concentrations in Water Recovered Through Seismic Gap Drain Operation ML15030A1632014-09-22022 September 2014 Remedial Action Progress Report First Quarter 2014 ML15030A2952014-09-22022 September 2014 Table 04, Groundwater Measurements and Elevations - First Quarter 2014 ML15030A2842014-09-22022 September 2014 Table 02, Sample Collection Schedule - First & Second Quarter 2014 ML15030A2832014-09-22022 September 2014 Table 01, Well Construction Details 2024-03-07
[Table view] |