IR 05000341-07-401(DRS); 01/22/2007 - 01/26/2007; Fermi Power Plant, Unit 2; Routine Security Baseline Inspection - Cover Letter
ML070650598
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/02/2007
From: Kenneth Riemer
Plant Support Branch II
To: Cobb D
Detroit Edison
References
IR-07-401
Download: ML070650598 (6)


Text

Enclosure contains Safeguards Information. Uponseparation, this page is decontrolled. March 2, 2007Mr. Donald K. CobbAssistant Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166SUBJECT:FERMI POWER PLANT, UNIT 2NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000341/2007401(DRS)

Dear Mr. Cobb:

On January 26, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results which were discussed, on January 26, 2007, with you and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.This report documents one finding of very low security significance (i.e., Green as determinedby the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site.EXEMPT FROM PUBLIC DISCLOSUREMay be exempt from public release under the Freedom ofInformation Act (5 U.S.C. 552)Exemption number: 5 Nuclear Regulatory Commission review required before publicrelease.G. Hansen, RIII/DRS/PSB Name and organization of person making determination.

Date of determination: 2/22/07 Enclosure contains Safeguards Information. Uponseparation, this page is decontrolled.D. Cobb-2-NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section VI.A.1ofthe NRC Enforcement Policy because of the very low security significance of this violation, and because it was entered into your corrective action program. If you contest this Non-Cited Violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Fermi Power Plant, Unit 2.The finding was licensee-identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in theenclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public document room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390. D. Cobb-3-Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.

Sincerely,

/RA by D. Funk acting for/Kenneth Riemer, ChiefPlant Support Branch Division of Reactor SafetyDocket No. 50-341License No. NPF-43Enclosure: Inspection Report 05000341/2007401(DRS) w/Attachment: Supplemental Information ( )cc w/encl ( )

B. Westreich, NSIR/DNS Licensing Assistant, NSIR/DNS/RSS State Liaison Officer, State of Michigancc w/o encl ( )
K. Hlavaty, Plant ManagerR. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators Wayne County Emergency Management DivisionDOCUMENT NAME: C:\FileNet\ML070650598.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEGHansen:co DFunkCLipaDFunk DFunkKRiemer DFunkDATE02/29/0702/28/0702/28/0703/02/07OFFICIAL RECORD COPY Enclosure contains Safeguards Information. Uponseparation, this page is decontrolled.D. Cobb-3-Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA by D. Funk acting for/Kenneth Riemer, ChiefPlant Support Branch Division of Reactor SafetyDocket No. 50-341License No. NPF-43Enclosure: Inspection Report 05000341/2007401(DRS) w/Attachment: Supplemental Information ( )cc w/encl ( )

B. Westreich, NSIR/DNS Licensing Assistant, NSIR/DNS/RSS State Liaison Officer, State of Michigancc w/o encl ( )
K. Hlavaty, Plant ManagerR. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators Wayne County Emergency Management DivisionD. Cobb-4-ADAMS Distribution: w/out encl ( )TEBLXR1 MMT Enclosure contains Safeguards Information. Uponseparation, this page is decontrolled.RidsNrrDirsIribGEG KGO GLS RMM3 CAA1 LSL (electronic IR's only)

C. Pederson, DRS (hard copy - IR's only)