IR 05000341/2007201

From kanterella
Jump to navigation Jump to search

Download: ML071210411

Text

Enclosure contains Safeguards Information. Upon removal, this letter is decontrolled. May 18, 2007Mr. Jack DavisSenior Vice President and Chief Nuclear Officer Fermi Nuclear Station Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT: FERMI NUCLEAR STATION - SECURITY INSPECTION 05000341/2007201

Dear Mr. Davis:

On April 13, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at the Fermi Nuclear Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 13, 2007, with Mr. Don Cobb, Assistant Vice President Fermi Nuclear Station and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related concerns contained in theenclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

J. Davis 2 Should you have any questions concerning this letter, please contact us. Your cooperation isappreciated.

Sincerely,/RA/Ronald J. Albert, ChiefSecurity Performance Evaluation Branch Security Oversight Division of Security Operations Office of Nuclear Security and Incident ResponseDocket No.: 50-341License No.: NPF-43

Enclosure:

NRC Inspection Report No. 05000341/2007201 (SGI)

cc w/encl:Tom Stack, Manager - Nuclear SecurityFermi Nuclear Station Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166cc w/o encl:Ronald GastonManager, Nuclear Licensing Detroit Edison Company Fermi 2 - 200 TAC 6400 North Dixie Highway Newport, MI 48166Thor Strong, Chief Radiological Protection and Medical Waste Section Waste and Hazardous Materials Div.

Michigan Deptartment of Environmental Quality PO Box 30241 Lansing, MI 48909Colonel Peter MunozEmergency Management and Homeland Security Division Michigan State Police 4000 Collins Road Lansing, MI 48910 J. Davis 3-Should you have any questions concerning this letter, please contact us. Your cooperation isappreciated.

Sincerely,/RA/Ronald J. Albert, ChiefSecurity Performance Evaluation Branch Security Oversight Division of Security Operations Office of Nuclear Security and Incident ResponseDocket No.: 50-341 License No.: NPF-43

Enclosure:

NRC Inspection Report No. 05000341/2007201 (SGI)cc w/encl:Tom Stack, Manager - Nuclear Security cc w/o encl:Ronald Gaston, Licensing Manager; Thor Strong, Chief Radiological Protection and Medical Waste Section Colonel Peter Munoz Emergency Management and Homeland Security DivisionDistribution w/encl:DSO R/F C. Grigsby, SPEB D. Riffle, NSIRDistribution w/o encl:Meghan Thorpe-Kavanaugh, NRR Project Manager Amy Mcleod - PMDAAccession No.: ML071210411*Signature on previous pageLOG #OFC:DSO/SPEBFermi/SRIRegion IIIBC:DSO/SPEB NAME: J. BeardsleyR. Michael Morris (by Email)Ken Riemer (by Email)R. AlbertDATE:5/15/075/07/075/17/075/18/07OFFICIAL RECORD COPY