ML18009A628

From kanterella
Revision as of 07:40, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Shearon Harris Nuclear Power Plant Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification.
ML18009A628
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/03/1990
From: Gordon Peterson
Federal Emergency Management Agency
To: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML18009A629 List:
References
NUDOCS 9008240252
Download: ML18009A628 (5)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM DREGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9008240252 DOC.DATE: 90/08/03 NOTARIZED:

NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION PETERSON,G.C.

Federal Emergency Management Agency RECIP.NAME RECIPIENT AFFILIATION TAYLOR,J.M.

Ofc of the Executive Director for Operations

SUBJECT:

Forwards,"Shearon Harris Nuclear Power Plant Site-Specific I Offsite Radiological Emergency Pr'eparedness...." D DISTRIBUTION CODE: IE35D COPIES RECEIVED:LTR ENCL SIZE:+5 TITLE: Emergency Preparedness-Appraisal/Confirm tory A tion Ltr/Exercise Rep NOTES:Application for permit renewal file].05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: AEOD/DOA/IRB NRR/PMAS/I LRB12 OC/LFMB RGN2 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 RECIPIENT XD CODE/NAME BECKER,D I NRR/DREP/PEPB9D NUDOCS-ABSTRACT OE:DIR RGN 2 COLLINS,D NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1~1 D D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 D V

~t'GY Mg~0 a Federal Emer Washi OI 5 Mr.James M.Taylor Executive Director for Operations U.S.Nuclear Regulatozy Commission Washdm~n, D.C.20555

Dear Mr.Taylor:

Based on the engineering design review, the offsite plan reviews, and the results of the July 14, 1987, public telephone survey,.FERA, has determined that the alert and notification system installed amund the Sheamn Harris/Revision 1, and FEMA-43.'Ihezefoze, there is now zeasonable assurance that the system is adecpate to promptly alert and notify the public in the event of a radiological emezgency at.the site.'Ihe caveat on the alert and natificatian system cantained in the March 28, 1989, Title 44 CFR, Part 350, appmval of the North Camlina Emergency Response Plan site-specific to the Sheazon Harris Nucleaz Power Plant, is naw reneved.%be Honorable James G.Martin, Governor of North Carolina, has been advised of this appzoval.Notwithstanding this appmval, FEME recammends that the State of North Carolina, the local jurisdictions, and the Camlina'~'and Light Company consider increasing the frecpency of the fully tests of the Sheamn Harris alert and notification system to once a month.FEMA believes that additional full~cle tests, at a monthly fzecuency, would pmvide an added d~of assurance of the continued zeadiness ami operability of the:Qmazun Hazris alert and notification systan.agency Management Agency ngton, D.C.20472 NS 3 IS90 iC~4C/Q"L t>~!~el/.f~'2-z'c'-

'Ihe Fec~Emergency Manag~Agency (FB%)has campleted an analysis of the prompt alert and notification system for the Shearon Harris Nuclear Power Plant located in New Hill, North Camlina.'Ihis zeview has been campleted pursuant to Tit1e 44 CFR, Part 350;se1ected evaluative criteria and Apperdix 3 in.NVRHG-0654/FEMA-REP-1, Revision 1;and FEMA-43, the"Stanchzd.Guide for the Evaluation of Alert and Natification Systems for Nuclear~Plants."'%he enclosed report entitled,"Sheamn Harris Nuclear Power Plant Site-I Sysbm Quality Assurance Verification," surtmarizes the engineering design review;incorporates the~ts of the telephone suzvey of the public candu':~following a full activation of the alert and notification system on July 14, 1987;and confirms the adectuacy of the applicable evaluative'riteria fzam Nt3REG-0654/FEMA.-REP-1, Revision 1, and FH%.-43.C.termn Associate Director State and~Pzxgrams and Support P008240~05000400 p2 ej0080 pDR pDOCK pDC F A~ag DISTRIBUTION D~kk11 RBecker PAnderson Plant File DOCKET NOIS).50-400

SUBJECT:

SHEARON HARRIS NUCLEAR POHER PL'ANT, UNIT 1 The following documents concerning our review of the subject facility are transmitted for your information.

DESCRIPTION OF DOCUMENT Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental'Statement Safety Evaluation Report, or Supplement No.Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice;Applications and Amendments to Operating Licenses Involvin No Si nificant Hazards Conditions See Pagels)Exemption DATED'x Construction Permit No.CPPR-Facility Operating License No.Order Monthly Operating Report for Annual/Semi-Annual Report: t Other , Amendment No.,Amendment No.transmitted by Letter 6/14(90 transmitted by Letter Office of Nuclear Reactor Regulation

Enclosures:

As Stated": See next page 0FFgE>>PD21'SURNAME>DATE>>PAnderson'RC FORMD318 (to/80)NRCM 0240 OFFICIAL RECORD COPY

~(4 f'I I A't g1~g 4't t