MONTHYEARML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20216G3501999-09-29029 September 1999 Confirms Conversations Re NRC Staff Voluntary Response to Orange County Discovery Requests.Staff Will Voluntarily Answer Discovery Requests & Will Not Waive Any Objection or Privilege Under NRC Regulations.Related Correspondence ML20212M1081999-09-29029 September 1999 Confirms Intent to Meet with Utils on 991025 in Atlanta,Ga to Discuss Pilot Plants,Shearon Harris & Sequoyah Any Observations & Lessons Learned & Recommendations Re Implementation of Pilot Program ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML20212H7741999-06-23023 June 1999 Responds to Re Petition Filed by Orange County Board of Commissioners Re Proposed Expansion of Sf Storage Capacity at Shearon Harris Npp.Public Meeting Will Be Held at Later Date.With Certificate of Svc.Served on 990624 ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML20206R2511999-05-19019 May 1999 Responds to Addressed to Chairman Jackson Requesting That NRC Grant Standing to Orange County Board of Commissioners in Shearon Harris Proceeding Currently Before Board.With Certificate of Svc.Served on 990519 ML20206Q5281999-05-17017 May 1999 Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9601999-05-11011 May 1999 Forwards Resolution Adopted by Carrboro Board of Aldermen at 990504 Meeting.Resolution Expresses Town Concern Re Util Plans to Double high-level Nuclear Waste Storage at Shnpp ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl IR 05000400/19982011999-04-12012 April 1999 Discusses Safeguards Insp Rept 50-400/98-201 (Operational Safeguards Response Evaluation) on 980908-11.No Violations Noted.Licensee Performance During Evaluation Indicated Excellent Overall Contingency Response Capability 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18017A9241999-10-15015 October 1999 Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools 'C' & 'D' in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18017A9141999-10-12012 October 1999 Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon ML18017A9131999-10-0606 October 1999 Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld ML18017A8911999-09-30030 September 1999 Submits Comment on Encl 2 to 990617 Memo Titled Summary of Meeting with Nuclear Energy Inst. Encl 2 Was Titled Draft Technical Study of Spent Fuel Pool Accidents for Decommissioning Plants. Rept Which Provides Info Encl Also ML20212J0741999-09-29029 September 1999 Refers to Proposed License Amend for Harris NPP Which Would Allow Licensee to Activate Two of Plant Spent Fuel Pools.Serves Copy of Orange County Second Set of Document Requests to NRC Staff,Dtd 990929.Related Correspondence ML18017A8941999-09-29029 September 1999 Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves. ML18017A8881999-09-27027 September 1999 Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) ML18017A8861999-09-21021 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18017A8821999-09-14014 September 1999 Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) ML18017A8651999-09-0808 September 1999 Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety ML18017A8581999-09-0303 September 1999 Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity ML18017A8551999-09-0101 September 1999 Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS ML18017A8541999-08-20020 August 1999 Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided HNP-99-134, Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.211999-08-18018 August 1999 Forwards Rev 11 to Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p)(2) & 10CFR50.4(b)(4). Description of Changes Is Provided as Encl 2 to Ltr.Rev Withheld,Per 10CFR73.21 ML18017A8351999-08-10010 August 1999 Corrects Statement Made in 980923 Ltr,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment ML18016B0531999-08-0606 August 1999 Forwards Exercise Scenario with Controller Info & Simulation Data for Harris Nuclear Plant Emergency Preparedness Exercise Scheduled for 990921.Without Encl ML18016B0461999-08-0404 August 1999 Forwards LER 99-006-01 Describing Condition Which Resulted in Exceeding TS Requirements for CIVs & TS 4.0.4 for Generic Requirements for Surveillance Testing.Rev Includes Results of Investigation Into Failure to Recognize TS Requirements ML18016B0421999-07-30030 July 1999 Informs That in Ltr Dtd 950330 CP&L Committed to Complete Assessment of Severe Accident Mgt Capabilities & Make Any Identified Enhancements by 981231.Actions Were Completed in July 1998 ML18016B0391999-07-30030 July 1999 Forwards Rev 35 to PLP-201, Emergency Plan. Rev Replaces All Pages of Previous Rev with Exception of EAL Flow Path, Side 1 & 2 & Annex H,Operations Map & Aperature Card. Changes Made by Rev,Listed ML18016B0221999-07-26026 July 1999 Informs That CP&L Proposes to Provide Response to NRC 990414 RAI Re GL 95-07, Pressure-Locking & Thermal-Binding of SR Power-Operated Gate Valves, by 990930 ML18016B0171999-07-16016 July 1999 Forwards Corrected Pages to Annual Radioactive Effluent Release Rept, for 1998 for HNP ML18016B0051999-07-0101 July 1999 Informs of Scheduled Emergency Preparedness Exercise for Shnpp on 990921,per Requirements of 10CFR50,App E.List of 26 Objectives Selected for Evaluation During Exercise,Encl. Without Encl ML18016A9871999-06-14014 June 1999 Forwards Response to NRC 990429 RAI Re License Amend Request to Place Spent Fuel Pools C & D in Service,Dtd 981223.Info Does Not Change Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration ML18016A9831999-06-10010 June 1999 Submits Notification That Reactor Operator Licensed at HNP Has Terminated Employment with Cp&L.Reactor Operator Info Encl.Effective 990528,individuals License Is No Longer Required & CP&L Requests That License Be Terminated ML20212H7521999-06-0404 June 1999 Encourages NRC to Schedule Open Public Forum Which Would Allow Local Citizens to Express Concerns Re Proposed Expansion of high-level Radwaste Storage Capacity at Shearon Harris Npp.With Certificate of Svc.Served on 990624 ML18016A9721999-05-28028 May 1999 Responds to 990309 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. ML18016B0011999-05-26026 May 1999 Forwards Ltr Received from Hj Jaffe Expressing Concern Re Cpl Proposal to NRC on Dec of 1998 to Make Harris Nuclear Plant Largest Storage Area for High Level Nuclear Waste in Nation ML18016A9631999-05-25025 May 1999 Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend ML18016A9511999-05-13013 May 1999 Submits Info Re Estimated Effect of Change to ECCS Evaluation Model,As Required by 10CFR50.46 ML18016A9481999-05-0606 May 1999 Forwards NRC Form 396, Certification of Medical Examination by Facility Licensee, for Senior Reactor Operator Licensed to Operate Hnp.Individuals Info Is Proprietary & Is Being Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20206R2611999-05-0505 May 1999 Requests That NRC Grant Standing to Intervention Sought by Orange County Board of Commissioners Re Proposal by CP&L to Expand Storage of Hlrw at Shnpp.With Certificate of Svc. Served on 990519 ML18016A9451999-05-0404 May 1999 Provides Proprietary Notification That One SRO Has Been Reassigned from Position for Which Util Certified Need for SRO License & Another SRO Has Terminated Employment with Util.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9441999-05-0404 May 1999 Notifies NRC of Util Completion of Actions Re GL 96-01, Testing of Safety-Related Logic Circuits at Plant ML18016A9351999-04-30030 April 1999 Forwards Info Requested in 990324 RAI as Suppl to 981223 Application for Amend to License NPF-63 for Alternative Plan for Spent Fuel Pool Cooling & Cleanup Sys Piping ML18016A9311999-04-30030 April 1999 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1998 & Rev 11 to ODCM for Shnpp HNP-99-068, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld1999-04-28028 April 1999 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan. Description of Changes Provided.Encl Withheld ML18016A9221999-04-27027 April 1999 Forwards Proprietary Notification That SRO Licensed on Shnpp Has Terminated Employment with Cp&L,Per 10CFR50.74(b). Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML18016A9211999-04-27027 April 1999 Provides Rev 2 to ISI Relief Request 2RG-008, ISI of Class 1,2 & 3 Snubbers (Code Category F-A) Per Plant TS in Lieu of ASME Code Section XI, in Response to 990408 Telcon with NRC ML18016A9161999-04-22022 April 1999 Forwards Proprietary NRC Form 396, Certification of Medical Exam by Facility Licensee, for SRO Licensed to Operate Hnp. License for Individual Should Be Amended IAW Change Noted on Form.Proprietary Encl Withheld,Per 10CFR2.790(a)(6) ML18016A9201999-04-20020 April 1999 Informs of HNP Personnel Changes to Facilitate Proper Distribution of Correspondence.Records Should Be Updated to Reflect Noted Change ML18016A9121999-04-12012 April 1999 Forwards Diskette Containing Data Re Annual Exposure Rept for Individual Monitoring for Personnel Shnpp,Per 10CFR20.2206(b).Without Encl ML18016A9021999-04-12012 April 1999 Forwards Rev 34 to PLP-201, Shearon Harris NPP Emergency Plan, Replacing All Pages of Previous Rev with Exception of EAL Flow Path,Side 1 & 2 & Annex H Operations Map & Aperture Card.Changes,Listed.Rev Summary,Encl ML18016A8911999-04-0505 April 1999 Forwards non-proprietary App 4A,pages 20-25 & Proprietary Page 4-6 to re-issued Rev 3 of Holtec International Licensing Rept HI-971760.Pages Were Inadvertently Omitted from Reissued Rept.Proprietary Page 4-6 Withheld ML18016A8891999-04-0101 April 1999 Forwards Rev 99-1 to Plant EALs for NRC Review & Approval, Per 10CFR50,App E.Encl Provides Comparison of Currently Approved EALs & Proposed Rev 99-01.Approval of EALs Prior to June 1999,requested.With Four Oversize Drawings ML18016A8811999-03-31031 March 1999 Responds to NRC 990301 Ltr Re Violations Noted in Insp Rept 50-400/98-11.Corrective Actions:Post Trip/Safeguards Actuation Rept for 981023,RT Was Corrected,Required Reviews Completed & Approval Obtained on 990219 ML18016A8671999-03-19019 March 1999 Submits Response to RAI Re Spent Fuel Pool Water Level & Revised Fuel Handling Accident Analyses,Per 990317 Telcon with NRC ML18016A8631999-03-19019 March 1999 Forwards Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept, IAW 10CFR55.45(b)(5)(ii). NRC Form 474 & Required Info Re Simulator Performance Test Results & Schedules Also Encl ML18016A8691999-03-18018 March 1999 Forwards Resolution Adopted by Lee County,North Carolina Board of Commissioners Re Proposed Expansion of high-level Radioactive Waste Storage Facilities at Carolina Power & Light Shearon Harris Nuclear Power Plant ML18016A8511999-03-15015 March 1999 Forwards Proprietary & non-proprietary Version of Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFPs 'C' & 'D'. Repts Are Reissued to Reflect Reduction in Proprietary Info.Proprietary Info Withheld ML18016A8601999-03-15015 March 1999 Informs NRC of Mod to Commitment for Hnp,Re Comprehensive Review of Implementation of TS Sr.Upon Completion of Listed Reviews,Surveillance Procedure Review Project Will Be Considered Complete 1999-09-08
[Table view] Category:OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC
MONTHYEARML18009A6281990-08-0303 August 1990 Forwards Shearon Harris Nuclear Power Plant Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification. ML20058L7461990-07-0909 July 1990 Forwards Shearon Harris Nuclear Power Plant Exercise on 890914 ML18009A5961990-07-0909 July 1990 Forwards Shearon Harris Nuclear Power Plant Exercise, Final Rept for Exercise Conducted on 890914.No Deficiencies or Areas Requiring Corrective Action Identified.Several Areas Recommended for Improvement ML18022A7111989-03-28028 March 1989 Approves State & Associated Local Plans for Radiological Emergencies Subj to Approval of Notification Sys by FEMA ML18022A5361987-07-22022 July 1987 Forwards Rept of 870228 Exercise of Offsite Radiological Emergency Preparedness Plans.No Deficiencies Noted.Eight Areas Require Corrective Actions & Several Areas Recommended for Improvement.Remedial Drill Conducted on 870422 ML20212E2611987-02-20020 February 1987 Forwards Response to 870219 Inquiry from E Rose Re Alert & Notification Sys ML20211M5011986-06-20020 June 1986 Updates Effects of Encl Chatham County,Nc Commissioners 860527 Resolution Concerning Shearon Harris Nuclear Power Plant Re Offsite Radiological Emergency Response Plans. State of Nc Will Schedule Meeting ML20154Q0971986-03-14014 March 1986 Forwards marked-up Rev 1 to State of Nc Emergency Response Plan in Support of Shearon Harris Nuclear Plant, Per 850913 Request for Confirmation of Facilities Capable of Treating Radiation Exposure ML20137F1191985-08-14014 August 1985 Advises That Facility Emergency Preparedness Public Info Brochure Meets Criteria of NUREG-0654/Rev 1 to FEMA-REP-1 ML18019A3191985-08-0707 August 1985 Forwards Shearon Harris Nuclear Station Exercise. No Category a Deficiencies Identified.Five NUREG-0654/ FEMA-REP-1,Rev 1 Deficiencies Observed.Emergency Plans Adequate ML18018B5111983-12-0202 December 1983 Advises That EPA Initial Comments on Fes Adequately Addressed ML18018A6041983-07-0101 July 1983 Forwards Comments on Des.Requests Clarification of Section Re Chemical Impacts of Blowdown Discharge on Reservoir. Statement Acceptable ML18018A5681983-06-22022 June 1983 Informs That Review of Des Complete.Major Factors of Environ Concern to Soil Conservation Svc Adequately Covered ML18017C0191982-08-31031 August 1982 Comments on Des.Specific Upland Acreages Proposed for Mgt & Fishery Practices Acceptable to Nc Wildlife Resources Commission Should Be Delineated ML18017B6901982-05-0707 May 1982 Informs of Endangered & Threatened Species in Vicinity of Site,As Well as Species Under Status Review,In Response to 820416 Request.Formal Consultation Must Be Requested If Determined That Species Might Be Affected ML18017B6771982-04-29029 April 1982 Responds to NRC 820416 Ltr Requesting Info on Occurrence of Any Endangered or Threatened Species in Vicinity of Facility.Request Forwarded to Regional Ofc.Biological Assessment Not Required ML18017B6531982-04-14014 April 1982 Discusses EPA Participation in NRC Review of Eis.Nrc Commended for Holding Public Meeting Re Environ Concerns ML18017A6531979-09-0505 September 1979 Discusses Suitability of Rockfill Characteristics for Main Dam Per NRC 781227 Request & Subsequent Telecon W/Oo Thompson ML19209C5221979-09-0505 September 1979 Responds to NRC 781227 Request for Assistance in Evaluating Rock Fill Characteristics for Main Dam.Review of Test Fill Rept & Site Visit Indicates That well-graded Rock Fill Can Be Achieved Utilizing Proposed Placement Procedure 1990-08-03
[Table view] |
Text
-_
- m .
!Q gs) Federal Emergency Management Agency g
8 Washington, D.C. 20472 MR I 4 585 MEMORANDlM FOR: Edward L. Jordan, Director Division of Bnergency Preparedness and Ergineering Response Office of Inspection and Enforcement Nuclear ulatory Canmission FROM: ca . .<
Assistant Associate Director Office of Natural and Technological Hazards
SUBJECT:
Medical Services Information for the Shearon Harris Nuclear Power Plant This is in partial response to your request of Septenber 13, 1985, for medical services information on several nuclear power Near-Term Operatiry Licenses (NTOL). For these NIOL's, you requested that the Federal Emergency Management Agency (FEMA) confirm that the offsite emergency plans include a list of local or regional medical facilities which have capabilities to provide treatment for radiation exposure.
The following extracts fran the State radiological emergency offsite preparedness plans that support the Shearon Harris Nuclear Power Plant are attached:
Part 1, State Procedures to Support the Shearon Harris Nuclear Power Plant, IV. EXECUTION,Section V.B., " Medical and Public Health Support," pages 65 through 70, North Carolina anergency Response Plan In Support of the Shearon Harris Nuclear Power Plant, Revision 1, September 1984.
Hospitals ami medical centers in North Carolina in the vicinity of the Shearon Harris Nuclear Power Plant are listed that have been identified for treatment of radiologically contaninated individuals. The Radiation Protection Section of the North Carolina Ibpartment of Human Resources maintains lists and locations of other inspitals at greater distances fran the plant that will provide back-up support and that could be called upon to provide assistance if needed.
This information is confirmation that a list of medical facilities has been identified for use in case of an emergency at the Shearon Harris Nuclear Power Plant.
If you have any questions, please contact Mr. Marlow J. Stangler, Technological Hazards Division, at 646-2856.
Attachments As Stated 8603210029 860314 PDR ADOCK 05000400 o' F PDR h
_-4.f p t j j-p g l l
.l l j l l l t l ,
,i !l l l l l q
4
.. . . .- * ** * * ~ ^ * + -
' .* *y9. . * .' i. +.
-p ._tp._ . . ...'4*{* -t T
. 7 .n q-p rt T -r.{ r7r .L. * .. ,.- *T- . r-~r
.7._n. . i. . ,~*. t. '. ~.**- ~.' - .'M r .*_,-'_L+
. , i
.. _. -_ .. .- .. -- .- ... ._ .._7. , . . - . - ... . ....,i........r..._. -
- .- r
.-1 '
. ,_ ! --.- ,-.! iij.,.i.;-p_i-w$ ; ,
i l
. .i . - _,, . . 1 1 P i l
.._.,-.,-.-t4 . .t - - .
J-. g ' ,v...ag4' .--.,.....
..-..-..,..,_n',.i: p-.-._.,-----..-.-.1,.-{,-j-
+7 --._,- p,,!
l i . . - . .
4 i ; : t . i
- 1. . -
h ; i---
- p. ,
, n %.
,s E
w w C m
,y . .
.......-.-.-.+-ep",. e--7 4 .+.-. 4j .4 - -.-r;p 4T
-Ft 1l -* t q ~r * -~Q7 t i -i -b ri~ t r + - +-- t -~ *-+
.pr--- r; p i
m m7 u .t+- .--
p . . . - {. - r17-4 e r r, r + r t r t i t i t ". p . 7 7.-f +- t -- t --- * -
it-t-" +t -~r.
t t tHd-51 i-+ t '
_ *-n t 4 F
p . - - p _p, _.- . .
1-. + }y -,-: -t-..
n - - r +
r
. - . - . _ . - . _ . _ . _ , . 4-..-. - . t- , -. - . i;: - . . - i . r.r. . rr., -e, - - _
i i ; i~ i _; . ._. .
7, s ' t ! t i i r,,,._ .- - + t t-+t * -
- r "-+' - "i++l I -~ r +~i - + ~t -f +-, i T! ---+#, - .+,1 I i- .i _ . - , ,- ., -
i i l c L y g .;4 - 7y , W T1 T J f I i l ,i : ' t l g V r G'T'-' V r* Mi 1-~
7.-.'q-.'-.13 - . 7. . _-. yp-,!- t -t rYtYrr rt t*- W
- O u
> w
- t
- ' 'i + i t +~ i P tt-*~* ~* r" *m ~+*Ft-+ 'T h+ tl ~ t+ 'T't-t- rrn 1 *-+~riTt r rr- t r+T r r
+~ mr.+~- . 77 7 -+. FtT"
.~. .,
0 t t~ 1 t em r+t---ntnT r r r *~- r -
--.- rrperp
- p. ,-
g . , ,p, .. .-(y.
.i -*7 ye 7 p p. p t *7 ~-. *d.y - ,
prp 7 (p q"{r 7-mrr+t-+
tppp T +r. rf 7.- - ~t-+
7.-. gg.~3. p . 73 3 p 7 7 t7T r r rt T t Pt r g T7 7.y pt 3 , . . pp-}t. rp. -, 3-~ 7 rt Fr t 777," ' i yC T
, - - L p. . t 7._p
-.7.--7 777.- .
W m
. rp.-- rn-- ; - .. 4 p g 7373 g,,7 .-,3 7.77 ,.7.r..--r r7 7 7 m pt-t7. + 77 r.7 tk pp pr73 7 "'= = 7 r - r7.i : 1-r.-.t T.7 r rr tr Te t-7,-,--7 1--. - . - r t 7.- ..p. --777 7 7 +* t
-+-
-.-. -- 7 7 . 7 .-. - .- D -
7_, y e.- y .-+-+ T. y n e-eer ,F t rvi .3 .
i-t r - ~t-t j w
C 3, tj , ht -P+T + r p.,-,-.-.
- tTt-t t-t--+ t-Ft TrH rFtT:~+ t-t-4 t ri -t- t4 in- j i-; - { t7 t i- ~t ttptit-tdrt r rtM
- t !T 7r g- Z rrrrt ertTr+ ' ~ ~~-+ 7t ;Tri t,{rrt yYr r'YJ-k;-~~-
rt r~ t ~- . tT* re nr t"~~1 -
T v r .
-*-t ~r ,*^" ~* t W + f nTt-VV rt"-t r *~ T .gT. + T
- T. , *py r. 7r.-_t *Tt1 7 "n TniR 7, . -7.-.-.--ny
-, ; .7 _e . .-, . 7. ,p . 7 7. s .-. c .-. T Y. T r7 Tt r rt- r t
,9 _
. _ . . n. -, + +-.
. - . - . yr . 7 q i- t T_7 j + r.-t p 4, ~ Q w .-.m.,7.-.-..
. 7..
!.9-.t..-,..-pr.r7 . -,_,-,777...- r t 7.- 77., {-7-}-7 7_4
- p +7 7+ 777h p 7 r+ t --~m rt ri r"F W ilTrtT' r
- 7. . 7- ~rt~ *
- * *- ~ * +-+ '-* +-+ -+-+-- ,
t O
+ 1 -+ T +- t - + -
7 -
7 -.
r.- t-t r.
n Q
.-.r...---.-.-. ,-. r-- - -+ *
+ * * *
+ r+ n n r + - r r t- r + " t T t r +-- e n i rrpr+ t rt i
- 7 7- 7...., r rTTTTr+t,J ~
Q 9r- rri- -; 7t ppp7 r+ T* F . _~r*T
. 7 . . i rt r+r+-t-+-+-+~ maT7T +" ,. n '. rw t t.r pr t-e y jpr p r7 7 p 7rt 7. tq t3-t~ t T.q F pt t;-ti ri-
,. +1TT77 i
-,+rp r7 t r*-~ +** re. r-+7
-~+* ~*
Ft-i-t TFrr t-.i Tri--
7,,gp;p_
.w- ,rp ,
+.,,_r.-
p- rp p 7gp
_,_.-,g.. 7 .pg .- 7, ,.
e- .
,_,r.
p .;v 7e 7,j _,7 ; 7 .3.-._
- y. y.,7 .
p --. m e . n . 4 7 9 f 4 q,p.7 nyn q j-4 ..-p+--jy q_,77 77n re7, j-j L7 q 7 _ 4ph7, 7.. pp p} Q 4 _
-. q p p g ,q }r, r.7 1 rrn v rrr 7-
.n- cre y _ . , r-.- n- n yr. T17 r-v7
.m. . ,r- p r r , i tT,t r @ t 77.".rhe+7-tttr c p. .. . np,t .+ ,,, '. t - tr. ; tTt g.t i r+ .ry+-t rt i.,- T,r. r +Tt ri Tr rtTitr ' t- r m n +trr1 - T y *t " e+ t-_f
+ -- -
r -
Q q_ p ,
, , ; 7 . ,_ - , , 7- -. . . - , 7- . 3-, .7.-7 . 3 - 777p e-,-3 3p- , - g--(
p.7,7.-_7._7.- - .,7-,-1-, .-. .
.,.+T.*+-++,7, W T *r r.- M._r.,tt. L.-.m.__rrtp--r . - .f . -_' pt. ,-t-hr r' n - n-r ~tT_ um .m_r._--
pLr.7.7
. , _ , .-4-.--+_ . u .. .y- - - . -
t 1-p"-H g7Ht--_
r .--4 j-_ _f_._ t- ; j auemm J
g ._.#, .. y . . - , . . p
. .,.-p g7 7,yp7.pyp--.-,-_77p,..{-pp.T ee
- p. - j
.-r w y Q- pp~+(777.,'+yy7 F rtN L~r t 3 r 7p- 7_7-- . .
7 p(7-77
=
- _en, -
._._.-. _v -
y.gp g 7, _
7
.,7 3 -. .
g .--_777,rypg 7ppp, t
. 7 p,3 p . 7 7 g_
3- 77 ____
.-.-.7 7 j r ,_ _.
7 71-.
.p 7 q_p. r ,77 , 7;
, 7 p - 4 {_7.b,
.7 7 t pp + ' i r.-.t 9-p Nj b.
N*t t p';"7_._.-._7 t p . 7 -.i.-n-P + r f t "MTi M.p i 7l 7T!TF M7Ft i Tt F]TM- i
."~rt rrn i r ~+T t +7 r M ' l r , - t+ r t r t + -' rt ' -t 1 ~ r d p ; 7p p7 7-q p q q--+7 + r *
- h rt t-+prn r-rt- t--t 7-t p_ r.t T ij7pp jr; -
- ~ r r t- ~ t-t T t v i .t ,7 77..,t t i t i- -+ t t -t ;T{ -L-i 7 , i{-t p t 7--t t i n t t r_{7pppp7pq t rt11 ri-"- ~ ri j J--~7--7 7 7 n 7 ~t
.,q 77-,.77 .-_
t 7 - .-9 pp. -7..777,797,4 y 7 F rm nn n n. -. p p. f p , p . 7 . r .-._ Trn Tn prppgg H an t n d- .m
+ 39.Er. ., ,, r4H-,g t 4 7p q p . --.n7_. . 7 7
,.7.,
7 g 7 7.i. -__
_p_: _
-._.9_.g p_7 _ , -p ,r .
n pp.3e pyyppp( ---- -_
,q..,r 7 7_7, 7.7m 4
; 7 . m. . . ,7 , e, .pr 7. 77, 7 7 . .. p 4 7- ..
. , q . 3 9t,_., .
t n t-t ,r. ; +t 7rr+ r7-r " Trp .p+
Fr".t',i p.
y-ti-{-+.7 p 7 p }- 7 q g7p "---
.p
.re.7, gr t-.q - _pr g ._, p. 7 ,3 ; . , -. pp ,7 p _ 9 7 _. _
- . , 7.- , g_ 11 . .-. 7 7 g -9
+-*+
...'t-t-++7t*++FFrF*r' W-p 1 ,_7t g Y t rTTn-P
+-+-t Tr t r' '--
e r -+ r 7 - + + - t t t
- t -+ n -e J -MT+ t- + n * *Tt err
- nt i-"+t--+
77 7 . r .--*T r p p ,- _ .-. , r-~ +- = + r +- rrt r+Trtwri t n Frrt-+Trrt rtTiTtT"T n- rt-7._p-,~T-~i r 7 7 t, .- _ 7 --. +-Fr-+ t M H ti rt '.1 + - +-']+-+ +r'7-t " + +7 -+
] rH -t Fr r1 t (+ +b+t r* + *-r+ t-* r +-+T + r T i+ b r r T ' M i-+ : i Mt-"Y rt F ppy.7.--._t 77377, n.- 77p;_pppy._7}.,7g 4 .errr_r_ _-
, i
. . 7- . . . . - 7 ,_ p _7 9 7
; 7-- 7- j7 . p. - . e t r -+ - + r + F r* r+-"-+ r* -'. TT r + r~;~ ~ ~rrFt!ii . Tr+Ttti;Frrtr-t F "i~ T. t T. +- f M e = g .r_t-+ t 7-r
- t, ;-+ t- t + +- F r - *-r+~; '
t +..-.-~~.4.p t - *trri. ~ ~t'.-- ., _.i i .;.- .- .j_m, , t.T. .r i T,
. - . . _ . . . t- T.r..--._.- t t~ "
.._._.--. ._ - _ _r.,- , - - . . . . ._c-,-. -
4 r r i , . ;, i i ,,i,.,,t i , ! , i , i1 ii.i. .ii,1 i ii, ,
i ,,, r i , ,,1, ,j,, ,. ,
,iif, i Y i I-^ 7 r i i ITI i j l i1 r" l g ~
j i! iTia]4 [I T T~tTiTi~ I' I" i t]t ~rtT "
TI-r ~i I-"TrTIi I t '~7 i i-* 7 T i j l Ti i T i~- i-
. i 5 .i i iT- . , , +7rt.T.r t_yr - ctt_T- _ _-+T_t-~"'I'4"i +Tr ~
TiIi. . i rt i .
i - . . .
_9 7. _ _ _~ _L_p _"-"_Tri- In. -"T. - tit . t. N. i i. i . I
. .. 1 . .. .
Page x TABLE OF CONTENTS Section Pm Mutual Support Agre em en t s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii Foreword................................................ vii Record of Changes....................................... ix PART 1 STATE PROCEDURES TO SUPPORT THE SHEARON HARRIS NUCLEAR POWER PIANT I. PURP0SE............................................ 1 II. C0NCEPT............................................ 1 A. Planning....................................... 1 B. Operations..................................... 3 III. ORGANIZATION AND RESP 0NSIBILITIES.................. 9
( A. Principal Response Organizations............... 9 B. Responsibilities............................... 10 IV. EXECUTION.......................................... 32 A. Emergency Classification System................ 32 B. Warning and Notification Methods and Procedures 34 C. Accident Assessment............................ 37 D. Public Education and Information............... 41 E. Protective Response for Plume Exposure Pathway 44 l l
F. Protective Actions for In ,
Pathway..................gestion Exposure
...................... 51 I i
G. Radiological Exposure Control.................. ' 56 l H. Recovery, Reentry, and Post-Accident Operations 60 l C
Revised 3 Sep 84
Page xi Section Page V. SUPPORT RESOURCES, PROCEDURES
^)
EQUIPMENT.....................,. FACILITIES, AND
.................... 62 l A. Emergency Response Support and Resources....... 62 l B. Medical and Public Health Support.............. 65 l C. Emergency Facilities and Equipment.............
70 l VI.
EMERGENCY COMMUNI CATIONS . . . . . . . . . . . . . . . . . . . . . . . . .73. . l VII. PLANS, EXERCISES, DRILLS, AND TRAINING............. 80 l A.
Evalua tion of Plans and Skills . . . . . . . . . . . . . . . . . 80 l B.
Exercises...................................... 80 l C.
Drills......................................... 82 l D. Evaluation and Critique........................ 82 l E.
Radiological Emergency Response Training....... 83 l F. Responsibility for Plan Development, Period Review, and Distribution...................ic .... 84 ATTACHMENTS )
- 1. Authorities, References, and Agreements.............. 1-1
- 2. Supporting Plans and Their :
Sources................... 2-1
- 3. Inventory of Emergency Kits and Radiological Monitoring Equipment.................................
3-1
@, Ch4.L bCAltrutY drL%a L6sh. 4h8.T4.E6 M,-y,a ku s. 9-4 PART 2 CHATHAM COUNTY PROCEDURES TO SUPPORT THE SHEARON HARRIS NUCLEAR POWER PLANT I.
P UR P O S E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1. . . .
II. CONCEPT OF !
OPERATIONS.............................. 1 1
l III. ORGANIZATION AND RESPONSIBILITIES.................. 2 IV.
EXECUTION.......................................... 18 A.
En argency Classification Sys tem. . . . . . . . . . . . . . . . 18
, H Revised 3 Sep S4
PART 1 Pege 65
- c. Further laboratory analysis assistance is available from SMRAP Signatory States. -
- 4. Resources Support Coordination.
- a. Resources and support assistance from sources external to State and local governments may be required to conduct emergency operations within the EPZ. To assure that these resources are committed in an efficient and effective manner, the SERT leader will designate a SERT member to serve as the State's representative at the Shearon Harris Plant Emergency Operations Facility.
- b. Carolina Power and Light Company will designate a company representative to serve with SERT.
- c. Each county within the plume pathway EPZ will designate a representative to serve with SERT as a representative of their respective Board of County Commissioners.
B. Medical and Public Health Support.
- 1. Hospital and Medical Services for Contam ina ted Individuals.
- a. RPS systematically visits and evaluates the capabilities, procedures, and willingness of North Carolina hospitals to accept and treat radiation accident victims. The evaluation form used for this is shown in Figure
- o. Few hospitals in the State have the internal capability to evaluate radiation exposure and internal contamination. These limitations are adequately compensated for by the following:
(1) RPS has executed formal agreements with three in-state corporations (General i
Electric Corporation, Carolina Power and Light Company, and Duke Power Company) which have whole body counting equipment to be used in support of the emergency response plan. In addition, the Federal government and its contractors can provide whole body counting assistance.
(2) DHR and several medical institutions in the State are capable of providing urinalysis to determine body burdens of radioactivity in victims. This is supplemented through available support f-from Federal and private commercial laboratories.
Revised 3 Sep 84
PART 1, Page 66 RADIATION ACCIDENT ~~
HOSPITAL EVALUATION CHECK SHEET Hospital Name Address including Zip Code Persons to contact: 24-Hour ph66e numbers,sxtEssib6, A/C Will facility accept contaminated patients? , but only if Survey equipment available:
[] Check if Alpha detection capability available A. Meters Range Range Range i
B. Others (imaging equipment or calibrators) t Written emergency procedures: Yes, attached
'rk)
I f,
Inspector's comment concerning the facility and its ability. to cope with an emergency: j
)
i 1
Figure %
l-ID
{
Revised 3 Sep 84
, - , , . - ~ _ . , -
Page 67 PART I (3) RPS is prepared to arrange for complex blood studies to assess the amount of whole body radiation exposure. This includes the use of limited capabilitieu at major State medical institutions and services provided by Federal (NRC) agencies and their medical consultants.
(4) In addition to available local and region-al hospitals, RPS has made-special arrangements with the Oak Ridge Radiation Emergency Assistance Center / Training Site (REAC/TS), Oak Ridge, Tennessee to provide expert consultation for attending phys-cians and state-of-the art facilities for care and' treatment of severe radiation.
- 2. RPS standard procedures and reference materials related to medical- support include:
- a. Map showing the location of all hospitals that can provide medical support for victims of radiological accidents.
- b. Current lists of names, addresses, phone numbers and administrators of all hospitals.
- c. Copies of evaluation reports showing each hospital's capabilities, needs, willingness to accept contaminated patients, and their notification procedures.
- d. Copies of each hospital's emergency response plans for radiation accident victims.
- e. Procedures for selecting appropriate facilities to receive contaminated victims and for determining the quantity and type of support to be provided to those facilities. I
- 3. The following local and regional hospitals in the I vicinity of the Shearon Harris Plant will support ,
the plant and the surrounding, communities in the '
event of a radiological emergency. All hospitals listed are capable of treating contaminated injured patients, however, Duke University Medical Center, Rex Hospital and North Carolina Memorial Hospital have the additional capabilities and expertise to treat victims of severe radiation exposure. (RPS maintains lists and locations of other hospitals at greater distances from the plant that will provide back-up support.)
- a. Duke University Medical Center, Durham, N.C. 27710 Telephone: 9T9/684-2713 i
Administrator: William J. Donelan Bed Capacity: 1008 Revised 1 Apr 85
Page 68
. . PART 1 Location: Durham, N.C.
Heliport: Yes(Between North and South Hospitals)
Distance from Shearon Harris Plant: 33 miles Conrad Knight Contact Person (s):
919/684-2194 (Office)
David B. Jorgensen 919/684!2194 (Office)
. 919/383-6117 (Home)
Hospital has a plan to treat 15 patients.
- b. Wake County Medical Center, Raleigh,_ N.C.
i Telephone: 919/755-8500 l
Administrator: Raymond Champ, President Bed Capacity: 576 Location: 3000 New Bern Avenue Heliport: Yes (Near Emergency Room) 31 miles Distance from Shearon Harris Plant:
Emergency Room 919/755-8500 Contact Person (s):
Hospital has a plan to treat 3 patients.
- c. Central Carolina Hospital, Sanford, N.C.
TClephone: 919/774-4100 Adtcinis trator : Phillip Shaw 7
Bed Capacity: 142 Location: 1135 Carthage Street Heliport: No Distance from Shearon Harris Plant: 26 miles Contact Person (s): Emergency Rodm 919/774-4100 Hospital has a plan to accept 10 persons or more if required.
- d. Raleigh Community Hospital, Raleigh, N.C.
Telephone: 919/872-4800 Ext. 270 Administrator: Harrison T. Ferris Bed Capacity: 238 Location : 3400 Old Wake Forest Road Heliport: No Distance from Shearon Harris Plant: 29 miles Contact Person (s): Emergency Room 919/872-4800 Ext. 270 Hospital has a plan to treat two patients but could expand to four or more.
- e. Rex Hospital, Raleigh, N.C.
Telephone: 919/755-3100 Administrator: John R. Willis, Exec. Director Bed capacity: 394 Location: 4420 Lake Boone Trail Heliport: No (Could use parking lot near Emergency Room)
Distance from Shearon Harris Plant: 22 miles Contact Person: Emergency Room Charge Nurse 919/755-3100-Hospital has a plan to treat 35 to 45
' contaminated patients at one time and is the primary hospital for the Shearon Harris Plant.
Revised 1 Apr 85
. PART 1 Page 69
- f. North Carolina Memorial Hospital ~~ at Chapel Hill, Chapel Hilf, N.C.
Telephone: 919/966-4131 Administrator: Eric B. Munson, Director Bed Capacity: 665 Location: Chapel Hill, N.C.
Heliport: Yes (Near entrance to hospital and Emergency Room)
Distance from Shearon Harris Plant: 31 miles Contact Person (s): Emergency Room 919/966-4721 Hospital has a plan to treat 15 patients.
- g. Good Hope Hospital, Inc. Erwin, N.C.
Telephone: 919 /BFT~8151 Administrator: Phillip S. Lakernick Bed Capacity: 55 Location : Erwin, N.C.
Heliport: No Distance from Shearon Harris Plant: 31 miles Contact Person (s): Emergency Room 919/897-6151 Hospital can accept six patients but would
~
request assistance from Radiation Protection Section, DHR, or CP&L.
- h. Chatham Memorial Hospital, Siler City, N.C.
Telephone: 919/663-2113 Administrator: S. Barry Stanly, Director Bed Capacity: 65
( s Location: Siler City, N.C.
Heliport: No Contact Person (s): S. Barry Stanly 919/663-2113 Distance from Shearon Harris Plant: 35 miles They do not have a plan...no nuclear medical department nor instrumentation.
Number of radiation patients which can be handled: None Duke University Medical Center and North Caraolina Memorial Hospital are Regional Hospitals that treat parients from the entire State and southeastern United States.
- 4. Radiological survey instrumentation will be provided by consultants to the hospitals listed above. RPS will also make recommendations to the SERT leader for additional support from the Federal government. .
- 5. Transportation of Radiation Victims
- a. The Emergency Medical Services (EMS) Section, Facility Services Division, DHR is responsible for developing procedures to marshal cmbulance and rescue resources and for coordinating
('
emergency services at radiation accident sites and shelters.
Revised 1 Apr 85
l~ , PART I Page 70 l 1
1 l b. RPS will advise EMS of the medical facilities '
i to be evacuated, and those facilities capable ., I of receiving radiated patients.
J
- c. EMS staff, in consultation with RPS, will determine the number of vehicles needed and dispatch them to a local staging area as required.
- e. If necessary, the Military Assistance to Safety and Traffic (MAST) programs will be used to assist in transporting non-ambulatory persons to and from medical facilities.
- f. At a staging area, EMS personnel will be issued dosimeters, briefed on the nature and extent of the accident, and assigned missions.
C. Emergency Facilities and Equipment.
- 1. North Carolina State Government conducts emergency command and control functions from the State EOC located in the sub-basement area of the Administration Building at 116 W. Jones Street, Raleigh, N.C. 27611. The EOC will serve as SERT's command and control facility. .
- 2. The State EOC has approximately 20,000 square feet g of floor space occupied daily by DEM staff. 1
- 3. Office space is maintained in a readiness condition for the Governor and his staff. Space is also reserved for other key officials who assist the Governor and his staff in carrying out command and control functions.
- 4. The State EOC is equipped with an emergency power plant, a communications center, eating and sleeping quarters, and other necessities required for continuous operation.
- 5. SERT, when directed to establish a command and control facility, will locate at one of two facili-ties in the vicinity of the Shearon Harris Plant.
- a. Primary location: The State Emergency Opera-tions Center. ,
- b. Alternate Location: The National Guard Head-quarters at Raleigh located on 4105 Reedy Creek Road. Arrangements have been made for use of a designated area in this facility by SERT. The facility is equipped with emergency power, a communications center, and other necessities j required for continuous operation over an extended period.